Appendix E - Traffic Impact Assessment · MCU22/0051

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 56, section 1. The text section number identifies this passage in the reader.

Performance outcomes                                       Acceptable Outcomes                                      Response
environmental impacts, including from run-off and          Council’s Planning Scheme Policy PSP6 Engineering
erosion.                                                   Design Standards – Roads, drainage and earthworks



External Works and Infrastructure Table 9.4.7.3 Criteria for assessable development (part)

Performance outcomes                                       Acceptable Outcomes                                      Response
External Works and Infrastructure
PO14                                                       AO14                                                     Complies with PO and AO
Development is provided with external works—               Where not already existing, the following infrastructure Gateway Drive is constructed to its required
                                                           components are provided at the frontage of the site— standard along the site’s frontage and beyond in
          1.   along the full extent of the frontage of                                                             both directions. A new pedestrian concrete footpath
               the site to an appropriate standard                 1. full width sealed road;                       is proposed along the site’s frontage consistent with
               having regard to the specified function             2. concrete kerb and channel where               the existing path to the north and south.
               of the road; and                                          appropriate;
          2.   provided beyond the site’s frontage if              3. forming and grading to footpaths;
               required.                                           4. vehicular kerb and footpath crossings;
                                                                   5. a constructed bikeway;
                                                                   6. a constructed footpath;
                                                                   7. a constructed carriageway;
                                                                   8. required alterations to public utility
                                                                         mains, services or installations;
                                                                   9. construction of any required alterations to
                                                                         public utility mains, services or
                                                                         installations;
                                                                   10. stormwater drainage works; and
                                                                   11. installation of electrical conduits.
PO15                                                                                                                Complies with PO
Any alterations or repairs to infrastructure as a result   No acceptable outcome provided                           The minor upgrade works on Gateway Drive are to
of the development are made at no cost to Council.                                                                  be undertaken by the applicant.

Used in these records

About this file

File size
10.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Traffic Impact Assessment.pdf · 10.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.