Appendix B- SWMP

of 76

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

KG

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

Appendix B

Stormwater Management Plan

Request for a Change to the Conditions
specification within the Decision Notice (Minor
Change)

5 Pearl Street & 54 Elm Street, Cooroy 4563 QLD
Lot 2 on RP64750 & Lot 2 RP153798

Cooroy Villas PTY LTD (ACN: 86 668 393 182)

rgstrategic.com.au

 
Log in to download the original file

Appendix B- SWMP.pdf · 4.8 MB (large file)

The download may take up to a minute.

Full text of the other 75 pages

Page 2

                                                                SITE BASED STORMWATER
                                                                      MANAGEMENT PLAN



                                              PROPOSED TOWNHOUSE DEVELOPMENT AT
                                                                  5 PEARL STREET
                                                                         COOROY


                                                                                                            Prepared for

                                                                                                        Altum Property Group
                                                                                                  Attention: Rob McCready



                                                                                            Document Reference
                                                                                                           23098 - SBSMP/2



Record of Issue:

 Issue         Status              Author            Date           Checked             Date            Authorised   Date
                                                    18 Sep                              19 Sep      Henry Morgan     20 Sep
    0        For Review           Rick Cui                         Darren Yuen
                                                     2023                                2023        RPEQ 11950       2023
                                                    26 Sep                              28 Sep      Henry Morgan     29 Sep
    1       For Approval          Rick Cui                         Darren Yuen
                                                     2023                                2023        RPEQ 11950       2023
                                                     17 Jan                             17 Jan      Henry Morgan     17 Jan
    2       For Approval          Rick Cui                        Winston Boon
                                                      2024                               2024        RPEQ 11950       2024

This investigation and report has been authorised by Mr Henry Morgan, a Director of Morgan
Consulting Engineers Pty Ltd.




Henry J Morgan           RPEQ 11950                                                        Wednesday, 17 January 2024


D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Current\23098 - SBSMP - Rev 2.docx

Page 3

                                                                                             23098 - SBSMP/2
                                                                                                       Page 2




                                            Table of Contents
1     INTRODUCTION ............................................................................................ 3
2     EXISTING SITE.............................................................................................. 4
  2.1    The Site ................................................................................................ 4
  2.2    Surrounding Area ...................................................................................... 4
3     PROPOSED DEVELOPMENT ............................................................................... 5
4     EXISTING DRAINAGE PATTERNS ......................................................................... 6
  4.1    Existing Infrastructure ............................................................................... 6
  4.2    Existing Drainage Patterns ........................................................................... 7
  4.3    Lawful Point of Discharge............................................................................ 7
5     STORMWATER QUANTITY................................................................................. 8
  5.1    Rational Method Assessment ........................................................................ 8
    5.1.1     Design Storms ....................................................................................8
    5.1.2     Rainfall Intensity ................................................................................8
    5.1.3     Times of Concentration .........................................................................8
    5.1.4     Runoff Coefficients ..............................................................................8
    5.1.5     Peak Flows ........................................................................................9
  5.2    Proposed Development Drainage ................................................................... 9
  5.3    XPSTORM Modelling ................................................................................... 9
    5.3.1     Intensity Frequency Distribution ..............................................................9
    5.3.2     Initial and Continuing Losses ................................................................. 10
    5.3.3     On-site Detention .............................................................................. 10
    5.3.4     Comparison of Peak Flows at Lawful Point of Discharge ................................. 10
6     STORMWATER QUALITY ................................................................................ 12
  6.1    State Planning Policy Assessment ................................................................ 12
  6.2    Construction Phase ................................................................................. 12
  6.3    Operational Phase .................................................................................. 14
    6.3.1     Sources of Contaminants ..................................................................... 14
    6.3.2     Proposed Treatment Train ................................................................... 15
    6.3.3     Pollutant Export Modelling ................................................................... 15
    6.3.4     MUSIC Modelling Parameters ................................................................. 15
    6.3.5     MUSIC Modelling Results ...................................................................... 16
7     FLOODING ................................................................................................ 18
8     CONCLUSION ............................................................................................. 19
Appendix A DETAILED SITE SURVEY ........................................................................ 20
Appendix B PROPOSED DEVELOPMENT PLANS ............................................................ 21
Appendix C NSC INTERACTIVE MAPPING PLANS .......................................................... 22
Appendix D NSC WATER QUALITY AND DRAINAGE CODE ................................................ 23
Appendix E RATIONAL METHOD CALCULATIONS ......................................................... 24
Appendix F CONCEPT SITE LEVELS AND DRAINAGE PLANS .............................................. 25
Appendix G BOM IFD ......................................................................................... 26
Appendix H XPSTORM PRE DEVELOPMENT RESULTS ..................................................... 27
Appendix I XPSTORM POST DEVELOPMENT RESULTS .................................................... 28
Appendix J XPSTORM POST DEVELOPMENT MITIGATED RESULTS ...................................... 29
Appendix K STORMWATER QUALITY OPERATION AND MAINTENANCE GUIDELINES .................. 30
Appendix L NSC FLOOD HAZARD OVERLAY MAP .......................................................... 31




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 4

                                                                              23098 - SBSMP/2
                                                                                      Page 3




1 INTRODUCTION
This Site Based Stormwater Management Plan (SBSMP) has been prepared for the Proposed
Townhouse Development at 5 Pearl Street, Cooroy.

This SBSMP has been prepared to investigate the effects the development will have on stormwater
quantity and quality.

The objective of this SBSMP is to ensure that there is no adverse impact by the development on
the environmental value of the receiving waters during the construction and operational phases
of the development. This SBSMP will also provide recommendations to ensure that the post-
development peak outflow conditions are not greater than the pre-development peak outflow
conditions.

In order to achieve this objective, this SBSMP:

    1. Describes the environmental setting of the development site and precinct;

    2. Describes the nature of the proposed development as it relates to stormwater quality;

    3. Calculates the peak flows for both pre and post-development conditions;

    4. Calculates the detention volume if required to achieve the pre-development outflow in the
       post-development state; and

    5. Identifies potential sources of contaminants and describes the management techniques
       designed to be employed on the site to achieve the water quality objectives.

The proposed development has been assessed against the following guidelines and planning
documents:

    1. State Planning Policy 2017 (SPP 2017);

    2. Urban Stormwater Quality Planning Guidelines 2010;

    3. The Queensland Urban Drainage Manual (QUDM); and

    4. Noosa Shire Council Plan 2020;




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 5

                                                                                   23098 - SBSMP/2
                                                                                           Page 4




2 EXISTING SITE

2.1 The Site
The subject site, comprised of Lot 2 on RP153798 and Lot 2 on RP64750 is approximately 2,274m2
(0.2274ha) in area. The site is currently occupied by two existing residential dwellings, with
associated sheds and garages. Trees and shrubs are scattered throughout the subject site.

The subject site generally slopes from the southwest (with an approximate height of 107.41m AHD)
towards the northeast (with an approximate height of 105.2m AHD). Existing access to the subject
site is currently provided from Pearl Street and Elm Street.

Refer to Figure 2.1 for a Locality Plan and Appendix A for the Detailed Site Survey.




   N

                                             Sapphire Street

                                                           Subject Site
                                Elm Street




                                                                                                    Kauri Street
                                                Pearl Street




                         Figure 2.1 – Locality Plan of Site and Surrounding Area

2.2 Surrounding Area
The site is located within the limits of the NSC region and is classified as Medium Density Residential
Zone. The site is surrounded by residential properties to the north and east and commercial
properties to the west and south. Cooroy Creek lies further west and Cooroy Train Station lies
further south west.


Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 6

                                                                      23098 - SBSMP/2
                                                                             Page 5




3    PROPOSED DEVELOPMENT
The Proposed Townhouse Development primarily involves:

    1. Three buildings containing a mix of two and three-bed units;

    2. Carparking spaces for residents and visitors;

    3. Vehicular access via Pearl Street, south of the site; and

    4. Dedicated landscaping and planting throughout the site.


Refer to Appendix B for the Proposed Development Plans.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 7

                                                                                                   23098 - SBSMP/2
                                                                                                            Page 6




4 EXISTING DRAINAGE PATTERNS

4.1 Existing Infrastructure
Data obtained from the NSC Interactive Mapping plans and detailed site survey indicate the
following existing drainage infrastructure:
    1. Swale drain traversing the northern verge of Pearl Street, south of the site;
    2. Swale drain traversing the eastern verge of Elm Street, west of the site;
    3. A 300mm dia. to 600mm dia. stormwater line traversing the southern verge of Pearl Street,
       south of the site; and
    4. A 1350mm dia. to 1800mm dia. stormwater line traversing the eastern boundary of 11 Pearl
       Street, east of the site.

Refer to Figure 4.1 for the existing stormwater infrastructure and drainage patterns and Appendix
C for the Noosa Council Interactive Mapping Plans.




   N




                                                                 Subject Site

                                                                                         Ø 1350
                    Elm Street




                                                                                                    Ø 375
                                                                                         Ø 1800




 Legend
                                          Pearl Street
 Sheet Flow Path
 Stormwater Line                                         Ø 300
 Stormwater Pit                                                                 Ø 600             Ø 750

 Swale Drain
 Headwall


                                 Figure 4.1 – Existing Drainage Paths & Infrastructure




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 8

                                                                               23098 - SBSMP/2
                                                                                       Page 7




4.2 Existing Drainage Patterns
Following an assessment of the existing site conditions and drainage infrastructure we can confirm
that the site has the following drainage patterns:

Roofwater Runoff
    1. Roofwater runoff from the site is discharged onto the ground where it sheet flows to the
       Environmental Management and Conservation Area, northeast of the site.
Surface Runoff
    1. Surface runoff from the site sheet flows to the Environmental Management and
       Conservation Area, northeast of the site.
External Catchment
    1. There is an external ground catchment contributing runoff from 52 Elm Street, southwest
       of the site, which sheet flows through the site to the Environmental Management and
       Conservation Area, northeast of the site.

It is noted that all sheet flow traversing across the site becomes concentrated along the eastern
boundary of the site due to an existing bund along this boundary that was constructed as part of
7 Pearl Street. Concentrated flow along this boundary is directed to the Environmental
Management and Conservation Area, northeast of the site.

Refer to Figure 4.1 for a drainage schematic and Appendix A for the detailed site survey plan.


4.3 Lawful Point of Discharge
If the proposed development maintains pre-development flow conditions, the lawful point of
discharge (LPD) is the existing Environmental Management and Conservation Area, northeast of
the site.

In consideration of the site characteristics, surrounding topology and stormwater drainage
infrastructure, the aforementioned proposed lawful point of discharge is considered to be
compliant with the criteria for lawful point of discharge outlined in Section 3.9.1. of QUDM 2017
as per below:

    i) The location of the proposed discharge point is under the lawful control of the local
       government or other statutory authority from whom permission to discharge has been
       received.

    ii) The post development discharge will not cause an actionable nuisance, nor environmental
        or property damage, as the existing flow characteristics and drainage patterns will be
        maintained for the proposed development.

    iii) Authority to discharge over affected properties will not be required as the proposed
         drainage patterns does not impact surrounding properties adjacent to and downstream of
         the subject site.

Refer to Section 5 outlining the Stormwater Quantity aspects of this site and Appendix D for the
Water Quality and Drainage Code.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 9

                                                                               23098 - SBSMP/2
                                                                                        Page 8




5 STORMWATER QUANTITY
A roof and allotment drainage system is to be designed to comply with:

    1. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage;

    2. The Queensland Urban Drainage Manual (QUDM), and;

    3. The Noosa Council Engineering Design Standards – Road, drainage and earthworks.


5.1 Rational Method Assessment
The Rational Method has been used to calculate the peak discharges from the site under the
existing (pre-development) and proposed (post-development) conditions.

5.1.1 Design Storms
As defined in the BRC Planning Scheme Policies the following design storms were adopted:

    1. Minor Drainage System: 10 year ARI statistical flood (Q10 storm);

    2. Major Drainage System: 100 year ARI statistical flood (Q100 storm).

5.1.2 Rainfall Intensity
Rainfall intensities for this study were obtained from the Australian Bureau of Meteorology.

5.1.3 Times of Concentration
Times of concentration (tc) were calculated as defined in the QUDM. Refer to Table 5-1 for the
adopted tc’s and Appendix E for tc calculations.

                                     Table 5-1 – Adopted tc values
                                   Pre development         Post development
                                       tc (mins)                tc (mins)

                                          10                     5.5



5.1.4 Runoff Coefficients
The 10 year runoff coefficient’s (C10) were determined as defined in the QUDM. Refer to Table 5-2
below for the adopted C10 values.

                                      Table 5-2 – Adopted C10 Values

                                         Property State                C10

                                       Pre-development                 0.75
                                       Post-development                0.85




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 10

                                                                                        23098 - SBSMP/2
                                                                                                Page 9




5.1.5 Peak Flows
Refer to Table 5-3 for a summary of the predicted minor and major discharge rates for pre and
post development conditions and Appendix E for the Rational Method calculations.

                               Table 5-3 – Pre and Post Development Peak Flows

    Property State       Q1 (m3/s)    Q2 (m3/s)    Q5 (m3/s)   Q10 (m3/s) Q20 (m3/s) Q50 (m3/s) Q100 (m3/s)

  Pre development          0.037        0.044        0.066      0.081       0.097      0.122       0.140
  Post development         0.051        0.060        0.092      0.113       0.135      0.172       0.195

As shown in Table 5-3, an increase in impervious surface areas will consequently increase
stormwater runoff peak flow rates from the proposed development.
Hence, it is proposed to utilise a series of on-site above ground detention tanks to mitigate the
stormwater runoff of the proposed development prior to discharging to the Lawful Point of
Discharge, northeast of the site.

Refer to Appendix E for the Rational Method Calculations, Appendix F for the Concept Site Levels
and Drainage Plans and Section 6 for the Stormwater Quality Management Plan.


5.2 Proposed Development Drainage
The proposed development drainage intent is as follows (refer to Appendix F for the Concept Site
Levels and Drainage Plan):

Development Catchment:

    1. Runoff from the roof catchments will flow via downpipes to aboveground detention tanks
       combined with rainwater reuse for mitigation prior to discharging to the lawful point of
       discharge, northeast of the site.
    2. Runoff from the ground catchment will be directed to the bioretention basin and level
       spreader located in the north eastern corner of the site prior to discharging to the lawful
       point of discharge, northeast of the site.
External Catchment:

    1. Runoff from the external ground catchment, southwest of the site, will be collected by a
       positive drainage system and directed to the lawful point of discharge, northeast of the
       site.

Refer to Appendix F for the Concept Site Levels and Drainage Plans.


5.3 XPSTORM Modelling
5.3.1 Intensity Frequency Distribution
The IFD data and temporal patterns used for the XPSTORM modelling has been obtained from the
Bureau of Meteorology for the following coordinates:
       Latitude -26.4153
       Longitude 152.9125

Refer to Appendix G for a copy of the BOM IFD data table.


Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 11

                                                                                        23098 - SBSMP/2
                                                                                              Page 10




5.3.2 Initial and Continuing Losses
Initial and continuing losses were approximated based on calibrating the pre-development flows
within XPSTORM to be comparable with Rational Method results. Refer to Table 5-4 below for the
adopted initial and continuing losses.

                           Table 5-4 – Adopted Initial and Continuing Losses

                             Designation               Initial Loss   Continuing Loss

                           Impervious Areas                 0.0            0.0
                            Pervious Areas                 10.0            2.6

5.3.3 On-site Detention
In order for the post-development stormwater discharge conditions to match the pre-development
conditions, it is proposed to incorporate a series of on-site above ground detention tanks with a
maximum storage volume of 27.5kL. The detention tanks will be located adjacent to each roof
catchment within the site.

The proposed OSD tanks will typically have the following properties:

       Available detention depth above reuse component = 1.420 m;

       Low flow orifice diameter = 0.070 m;

       High flow pipe diameter = 0.150 m;

       High flow pipe elevation above reuse component = 1.135 m;

       Total required detention volume = 23.5 kL; and

       Total provided detention volume = 27.5 kL.

The detention tanks will be designed to contain all flows up to a Q20 storm event from the roof
catchment and will mitigate flows at or less than pre-development for all flows up to a Q100 storm
event.

Refer to Appendix F for the Concept Siteworks and Drainage Plan which details the proposed on-
site detention system.

5.3.4 Comparison of Peak Flows at Lawful Point of Discharge
The pre-development and post-development mitigated peak mean/median flow rates were
compared for the catchment and are shown in Table 5-5 below.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 12

                                                                                  23098 - SBSMP/2
                                                                                          Page 11




                                     Table 5-5 - Comparison of Peak Flows
                             XPSTORM          XPSTORM                 XPSTORM            XPSTORM
         XPSTORM Total
                          Post-development Post-development        Post-development       Total Post-
  ARI    Pre-development
                          Flows into Tanks Bypass Flows (Un -      Flows from Tanks   development Flows
(years) Flows (Catchment)
                3          (Un -Mitigated)     Mitigated)             (Mitigated)         (Mitigated)
              (m /s)
                                (m3/s)           (m3/s)                  (m3/s)             (m3/s)
   1            0.040               0.038                  0.021        0.019               0.040

   2            0.047               0.043                  0.024        0.021               0.046

   5            0.069               0.057                  0.036        0.026               0.062

  10            0.083               0.064                  0.043        0.029               0.072

  20            0.095               0.073                  0.050        0.039               0.089

  50            0.117               0.084                  0.070        0.039               0.109

 100            0.132               0.092                  0.086        0.039               0.125


As can be seen, the XPSTORM pre-development results are comparable to Rational Method for all
storm events, as they are generally within 10% to the Rational Method results. Therefore, the results
show that a reasonable validation in peak flows has been achieved from the XPSTORM model when
compared to Rational Method and is considered acceptable in assessing for mitigation of post
development flows.

Subsequently, the XPSTORM hydraulic modelling results have demonstrated that the proposed
mitigation implemented will maintain pre-development flows (or less) for all design storms at the
LPD located northeast of the subject site.

Refer to Appendix H for the pre-development XPSTORM results, Appendix I for the post-
development XPSTORM results and Appendix J for the XPSTORM post-development mitigated
results.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 13

                                                                                       23098 - SBSMP/2
                                                                                                Page 12




6 STORMWATER QUALITY
The following section of the report will outline the potential contaminants and proposed solutions
to be incorporated during the construction and operational phases of the proposed development.

6.1 State Planning Policy Assessment
The purpose of this sub section is to determine if State Planning Policy (SPP 2017) stormwater
quality requirements, as set out by the Department of Environment and Resource Management, will
be triggered for this development. Refer to Table 6-1 for the State Planning Policy Checklist for
stormwater quality.
                                Table 6-1 – State Planning Policy Checklist

                                    Material Change of Use (MCU)                           Y/N?

            MCU for an urban purpose that involves premises ≥ 2500m 2                       N
            AND
            Will result in 6 or more dwellings
                                                                                            Y
            OR
            Will result in impervious area greater than 25% of the net developable area.
                                                                                            Y

The development has been assessed against the latest State Planning Policy 2017 (SPP 2017). The
proposed development will entail the material change of use for urban purposes, which will involve
a land less than 2,500m2. Consequently, State Planning Policy 2017 (SPP 2017) is not triggered.
However, in accordance with Performance Outcome PO6 outlined in the Water Quality and
Drainage Code (Noosa Plan 2020), all stormwater runoff is treated to achieve maximum removal
of nutrients, gross pollutants and suspended solids as determined by cost to efficiency ratios.
Hence, tertiary stormwater quality treatment is warranted for this development in accordance
with the requirements of Noosa Shire Council.

6.2 Construction Phase
Sediment generated during the construction phase shall be dealt with in accordance with an
Erosion and Sediment Control Plan and kept on site during the construction phase.

Erosion and Sediment Control (ESC) Measures such as silt fences, diversion drains, drainage
structure protection and dust control (clearing) will be implemented. Silt fences are to be erected
along the boundary of the site and around the construction area. These fences are to be cleaned
by the contractor when the capacity is reduced by 25%. Where possible, disturbance to the existing
surface is to be limited to the immediate work area. The existing ground cover is not to be stripped
until the contractor is ready for earthworks to begin.

Stockpiles and construction materials are not permitted to be stored within the road reserve and
should be contained using silt fences. Diversion drains are to be provided at upstream catchments
to reduce flows to earthworks areas. In any areas where flows could enter adjacent properties
temporary stabilisation is to be provided.

All ESC measures are to be provided as soon as earthworks have commenced and staged to suit
construction. The contractor is responsible for this action. A temporary construction exit is to be
located at each entry point to the site and will be determined based on the stage of works being
completed. The contractor is to ensure all dust tracked onto surrounding roads is immediately swept
to remove silt/dust.



Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 14

                                                                                        23098 - SBSMP/2
                                                                                                 Page 13




All new stormwater pits are to be protected from sediment infiltration by wrapping new pits and
grates in geofabric or covering appropriately with timber board. Silt fences are to remain in place
during the maintenance period until the site is established (80% ground cover).

Potential sources of contaminants identified for the construction phase of the development are
outlined in Table 6-2 together with proposed stormwater quality improvement devices,
management and maintenance procedures.

                   Table 6-2 - Potential Contaminants and Proposed Treatments

                                                                                 Proposed Treatment
                                                       Management /
     Pollutant           Potential Source                                       Device and Maintenance
                                                   Maintenance Procedures
                                                                                       Procedure
   Sediment &         Excavated material, fill     Provision of sediment and     Sand filled filter socks.
     Eroded             material, exposed           silt barriers to the site      Removal of excess
    material           ground, stockpiles of        drainage entry and exit       sand/silt build-up at
                            material.                        points.              regular intervals and
                                                                                   after every storm.
       Dust           Stockpiles of material,      Covering the material or       Coverage of material
                         exposed ground.             wetting it down at          with plastic, geotextile,
                                                      regular intervals.        surface binding agents or
                                                                                    regular watering.
      Litter           Refuse generated by         Construction waste is to       Industrial bin is to be
                              staff.                be cleaned off the site        provided within the
                                                   area and disposed of into    construction area - to be
                                                     an industrial bin then       emptied on at least a
                                                      removed by a refuse             weekly basis.
                                                     collection contractor.
     Concrete          Washing of concrete         Provision of a closed area   Liquids to be removed by
                      trucks/tools to remove       onsite for washing off of       a waste collection
                      wet/unused concrete.             concrete slurries.        contractor. Solids to be
                                                                                placed into a refuse bin.
    Surfactants      Washing down operations        No cleaning of vehicles     Monitoring & prevention
   (detergents)      on hardstand area using       will be permitted on site.
                           detergents.
    Chemical         Typically this may occur        Where spills occur, the    A temporary containment
     (Paints,           due to spillage of           containment area is to          area. This is to be
  thinners etc.)             product.                   stop escape. The          impermeable and of a
                                                    material is to be treated           size to permit
                                                        (as required) and          mixing/transfer, and
                                                    removed and cleaned by      with a storage volume of
                                                     a licensed contractor.           twice the largest
                                                     Minor spillage outside            container used.
                                                   this area shall be cleaned    Treatment of spills is to
                                                       up with cloths and             occur on site. No
                                                    disposed of to waste via       discharge of treated
                                                       the industrial bin.      water to the stormwater
                                                                                     system is to occur
                                                                                without council approval.
                                                                                    Incidents are to be
                                                                                   reported to the EPA.
   Wastewater            Spillage from the           A licensed contractor         No leakage is to be
                     relocation of the existing    shall remove any residue      permitted to enter the
                      sewerage reticulation.         sewage from unused         groundwater or discharge
                                                   pipes and contaminated          to the stormwater
                                                    soils are to be disposed            system.
                                                   of via the industrial bin.

Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 15

                                                                                         23098 - SBSMP/2
                                                                                                  Page 14




6.3 Operational Phase
Water quality objectives (WQO’s) for South East Queensland as set out in State Planning Policy 2017
(SPP 2017) should be achieved by identifying and adopting best practise techniques in accordance
with the abovementioned guidelines. Refer to Table 6-3 for the target WQO’s.

                           Table 6-3 – Minimum Mean Annual Load Reductions

                                                             Minimum Mean Annual
                                    Contaminant
                                                                Load Reductions

                            Total Suspended Solids (TSS)            ≥ 80%
                               Total Phosphorus (TP)                ≥ 60%
                                Total Nitrogen (TN)                 ≥ 45%
                               Gross Pollutants (GP)                ≥ 90%

6.3.1 Sources of Contaminants
Potential sources of contaminants and stormwater quality improvement devices identified for the
operational phase of the development are outlined in Table 6-4.

                                   Table 6-4 - Sources of Contaminants

                                                 Pollutant
               Target Pollutant Type                             Acceptable Treatment Examples
                                                   Size

         Primary        Screening of gross                     Litter baskets, swales, buffer strips,
                                                 >5000um
        Pollutants          pollutants                            GPT’s, underground detention
                        Sedimentation of
        Secondary                                125um -
                        coarse to medium                       Swales, sedimentation basins, ponds
        Pollutants                               5000um
                            sediment
                                                               Underground detention, constructed
                           Enhanced
                                                  10um –      wetland macrophyte zones, other bio
                      sedimentation of fine
                                                  125um          technologies, proprietary tertiary
                          particulates
                                                                   stormwater treatment dvices
         Tertiary     Adhesion and filtration                Constructed wetland macrophyte zones,
                                                 0.45um –
        Pollutants    of very fine / colloidal                  other bio technologies, proprietary
                                                   10um
                             sediment                         tertiary stormwater treatment dvices

                       Biological uptake of                  Constructed wetland macrophyte zones,
                                                 <0.45um
                        dissolved particles                          other bio technologies




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 16

                                                                                        23098 - SBSMP/2
                                                                                                 Page 15




6.3.2 Proposed Treatment Train
The proposed treatment train has been modelled using the following methodology:

Proposed Development Catchment

    1. Roofwater from the proposed roof catchments will flow via downpipes to above ground
       rainwater tanks for treatment with overflow to an internal drainage network.

    2. Surface runoff from the proposed ground catchment will be directed to an end of line
       bioretention basin for treatment, which is located in the north eastern corner of the site.

All runoff described above will then discharge to the legal point of discharge. The Concept Site
Levels and Drainage Plans of the proposed internal drainage network detailing the treatment train
assets are included in Appendix F. Refer to Table 6-5 for details of the proposed treatment train
assets.

                                Table 6-5 - Proposed Treatment Assets

          Treatment          Treatment
                                                                    Description
            Level              Asset

                           Rainwater Reuse
                                                Total of 12.5kL located adjacent to each proposed
           Primary/       Tanks (Landscape
                                                building, irrigating an area of 627m2 and servicing
          Secondary       Irrigation, Toilets
                                                toilets and laundry for all units.
                             and Laundry)

          Primary/                                   9m2 Total Filter Area
         Secondary/      Bioretention Basin          0.4m Filter Media Depth
          Tertiary                                   0.1m Extended Detention Depth


Refer to Appendix K for the Stormwater Quality Operational Management and Maintenance
Guidelines.

6.3.3 Pollutant Export Modelling
Following the definition of water quality objectives for the site and an assessment of the treatment
options suitable for the development, the most appropriate treatment scheme for the site was
identified. The impact of the stormwater management strategy on the quality of stormwater runoff
discharged from the site has been assessed using the pollutant export model, Model for Urban
Stormwater Improvement Conceptualisation (MUSIC).

6.3.4 MUSIC Modelling Parameters
The MUSIC model was set up in accordance with the Water-By-Design MUSIC Modelling Guidelines
for South East Queensland to the parameters listed in Table 6-6. Refer to Figure 6.1 for source
node areas in the proposed development area.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 17

                                                                                         23098 - SBSMP/2
                                                                                               Page 16




                                           Table 6-6 – MUSIC Parameters

                       Parameter                               Data Used

                      Rainfall Data                   40609 ELANORA 1989 to 1998

                   Modelling Timestep                          6 minutes

                         Routing                   No routing drain links were adopted


                              Table 6-7 – Catchment Runoff Generation Parameters

                                   Parameter                       Residential Catchment


                              Rainfall Threshold                              1

                         Soil Storage Capacity (mm)                          18

                     Initial Storage Capacity (% capacity)                   10

                             Field Capacity (mm)                             80

                      Infiltration Capacity Coefficient a                   243

                      Infiltration Capacity Coefficient b                    0.6

                              Initial Depth (mm)                             50

                           Daily Recharge Rate (%)                            0

                           Daily Baseflow Rate (%)                           31

                         Daily Deep Seepage Rate (%)                          0


6.3.5 MUSIC Modelling Results
Refer to Figure 6.1 for a print screen schematic of the MUSIC model for the proposed development
and Figure 6.2 for the annual pollutant loads that will be discharged from the site for the proposed
development.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 18

                                                                               23098 - SBSMP/2
                                                                                       Page 17




                            Figure 6.1 - MUSIC Model Print Screen Schematic




                                   Figure 6.2 - MUSIC Modelling Results

The modelling results show that the pollutant reduction objectives are met for all contaminants
given in Section 6.

Should operational requirements change, this plan is required to be amended to suit. Substantial
changes may require resubmission to the local authority. Following completion of construction, this
plan is to be incorporated into the total-site management practices.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 19

                                                                          23098 - SBSMP/2
                                                                                 Page 18




7 FLOODING
Information from the Noosa Shire Council Flood Hazard Overlay Map confirms that the site is
unaffected by flooding and inundation.

Refer to Appendix L for the NSC Flood Planning Control Property Report.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 20

                                                                              23098 - SBSMP/2
                                                                                     Page 19




8 CONCLUSION
The proposed Proposed Townhouse Development at 5 Pearl Street, Cooroy has been assessed for
its impact on the quantity and quality of stormwater drainage.

The lawful point of discharge is the existing Environmental Management and Conservation Area,
northeast of the site.

On-site detention (OSD) is warranted for the proposed development.

Sediment generated during the construction phase shall be dealt with in accordance with an
Erosion and Sediment Control Plan to be kept on site during the construction phase.

The proposed development requires tertiary stormwater quality treatment in accordance with the
requirements of Noosa Shire Council. Rainwater reuse and bioretention end-of-line treatment will
be incorporated into the proposed development to meet the prescribed water quality objectives.

The subject site is unaffected by flooding.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 21

                                                            23098 - SBSMP/2
                                                                  Page 20




                                             APPENDIX A


                                     DETAILED SITE SURVEY




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 22

Skyline Surveyors
Suite 11C
Brightwater Corporate Centre   PHONE
                               07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au

Page 23

                                                           23098 - SBSMP/2
                                                                 Page 21




                                             APPENDIX B


                            PROPOSED DEVELOPMENT PLANS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 24

 

 

 

 

     
    
  
  

  
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

     
 

 

 

 

 

 

     
 

     
     
    
   
 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
  
 
    
 
 
    
        
        
 
  

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 
 
 

 

 

  

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
        

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5 5 g g g 7 g & é | g g
‘ : ( - ( 1
‘ | . 1 ja] Ea I BIO REKENTION
| \ : oof 1g] ‘ Ol
— —— == —— aonnseTRACK kA} bye fi for ret sm
7 fe He Aes t ree
‘ I ra 109m? oA : ia nov oe TERRACE 1 *t
I ita i TERRACE am TERRACE ‘ gi ke TERRACE TERRACE Dn gs oon
Wd | tg | ath : | ees be ce fp he |
I ‘ Uo Tham 1 Fost Va g fp tte
| a 2 { a |
! 5 ep |
a
Ls ‘| da] 2 | -
a } ie =
| C SpE |
“es ' a Ie ot |
| : ' 1 :
uw zt 4 RIGHEN KAICHEN i ‘ s, KITCHEN KITCHEN | as
zl ‘ P 1 = *
w B | ETSI ES ' 5 LISI Lie oF
gli Ld 2 Y :
a Z| \ i y 5 ' . |
j Z|: GARAGE ‘GARAGE BARAGE GARAGE ! | fc GARAGE GARAGE 4,
OLE u01 U02 : U03 ‘U04 : | U05 eel U06.. U07 vos ~
Z ie TYPEO1 TYPE02 TYPE02 "TYPEO2 TYPE02 : i TYPEO2>, TYPE02 TYPEO3
GARAGE i i n \ | ; .
og | 4 ele *
= | a 1a RS
4 | YS \ | a.
t \ ee f 2
sf , | a et
| tae LM vay |S 105m
| _ r 4 RSD =
| { frooo y 2500 _|s00y. yp ‘ 00 ~ ae Ll 1i20_ 1000 J.
| i 7% wy . *, BUILDING 01 *. \ BUILDING 02° ~~ - ---
| d . mop fe 6520 150) sm. 250 so. as0yp sa sa mye LL s +
| / . an <2 eh 2 7 dt
| z ns . 270 . +
| et g zt
| a 3 lg 5 ee
IL- ‘e | + 2 ~
¥ \ hy 2
j oo 4 ey
£ E £ 30.175, E 262°02 £ AY £ £
106.2m
105.6m
4 U09 U10 .
TyPE02 || TYPEO2 1 u12 |
GARAGE GARAGE TYPEQ2 TYPEO2
3 GARAGE ~ GARAGE.
KITCHEN L_ 13] E=4
KITCHEN
106m DEVELOPMENT,
‘eae win) ALTUM
/
'
'
lI ! FLOOR PLAN - LEVEL 1
'
“ t
! Development Approval
ah ; ‘ i . / north scale: 1:100@A1
1250 - 1x 1100L RECYCLING ‘ \ NS ‘ / scale: 1:200 @A3
= 1x 1100L GENERAL WASTE ao : ‘sO ‘ 1 issue: 06
date: 19-12-23
\
Project Number 7283-DA04

 

 

exist
TREE

‘PEARL STREET

BUCK BURNEJ/CISON

ARCHITECTURE | LANDSCAPE | INTERIOR | PROJECT MANAGEMENT

01 FLOOR PLAN LEVEL 1

1:100 meee

 

 

 

 

Page 25

                                                            23098 - SBSMP/2
                                                                  Page 22




                                             APPENDIX C


                            NSC INTERACTIVE MAPPING PLANS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 26

Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability          20/09/2023

Page 27

                                                           23098 - SBSMP/2
                                                                 Page 23




                                             APPENDIX D


                      NSC WATER QUALITY AND DRAINAGE CODE




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 28

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                              Acceptable Outcomes                                 Solution1                      Comments                                      Council Use

Stormwater Drainage Design
PO1                                               AO1                                                                RO1
The development and its stormwater                A stormwater management plan is prepared                           The proposal complies. Refer to the
management system is planned and                  consistent with PSP6 Engineering Design                            Site Based Stormwater Management
designed having regard to:                        Standards - Roads, drainage and earthworks.                        Plan (SBSMP) report prepared by
 (a) the natural features of the site;                                                                               MCE.
 (b) the need to avoid impacts and potential
     risks to ecologically important areas;
 (c) the likely effectiveness of erosion and
     sediment control and stormwater                                                                       
     drainage measures during rainfall
     events during and post construction;
     and
 (d) the need to protect environmental
     values and water quality of receiving
     waters both during and post
     construction
PO2                                               AO2.1                                                              RO2.1
Stormwater drainage infrastructure is             Stormwater drainage planning, design and                           The proposal complies. All stormwater
planned, designed and                             construction is in accordance with PSP6                            design will comply with the PSP6
                                                                                                                     Engineering Design Standards –
constructed to:
 (a) incorporate allowance for increased
                                                  Engineering Design Standards - Roads,
                                                  drainage and earthworks and the latest version
                                                                                                                    Roads, drainage and earthworks and
     flood risk and tidal inundation through      of the Queensland Urban Drainage Design                            the latest version of the Queensland
     pipework as a result of cilmate change       Manual.                                                            Urban Drainage Design Manual.
     and sea level rise;                          AO2.2                                                              RO2.2
 (b) ensure the development is adequately         The stormwater drainage system connects to a                       Refer to the SBSMP prepared by
     drained; and                                 lawful point of discharge in accordance with                      MCE for the lawful point of discharge.
 (c) ensure stormwater is managed and             PSP6 Engineering Design Standards - Roads,
     lawfully discharged without altering         drainage and earthworks
     stormwater drainage characteristics          AO2.3                                                              RO2.3
     external to the site.                        Stormwater flows discharging from the                              The proposal complies. Above ground
                                                  development are demonstrated to be                                detention tanks will be utilised to
                                                  consistent with pre-development                                    mitigate flows prior to discharge to the
                                                  characteristics.                                                   legal point of discharge. Refer to the
                                                                                                                     SBSMP prepared by MCE.


1
    Solution:        Acceptable Solution                                                                                                                                                      Page 1 of 10
                A/S   Alternative Solution                                   D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                 Job: 23098
                                                                                                                                                                                                     Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                               22/09/2023

Page 29

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                               Acceptable Outcomes                                   Solution1                      Comments                                      Council Use

                                                   AO2.4
                                                   Development provides for the management of
                                                   stormwater to incorporate appropriate
                                                   allowance for climate change impacts                      N/A
                                                   (including rainfall intensity and sea level rise),
                                                   in accordance with PSP6 Engineering Design
                                                   Standards – Roads, Drainage and Earthworks.
PO3                                                AO3.1
Stormwater drainage infrastructure conveys         Stormwater drainage infrastructure meets the
run-off in a manner that allows roads to           desired standards of service for roads
deliver desired standards of service               functionality set out in PSP6 Engineering                 N/A
appropriate to the local conditions and local      Design Standards - Roads, Drainage and
stormwater drainage characteristics.               Earthworks.
PO4                                                AO4.1                                                                RO4.1
Stormwater infrastructure is compatible with       The location, design and construction of                             Refer to RO2.1.
existing infrastructure, allows for easy           stormwater drainage structures is in
access for the ongoing maintenance by
Council, is cost effective across its design
                                                   accordance with PSP6 Engineering Design
                                                   Standards - Roads, drainage and earthworks.
                                                                                                              
life
                                                   AO4.2
                                                   Where infrastructure is located on private land
                                                   an easement is dedicated over the
                                                   infrastructure in accordance with PSP6                    N/A
                                                   Engineering Design Standards - Roads,
                                                   drainage and earthworks.
                                                   AO4.3                                                                RO4.3
                                                   Any alterations or repairs to infrastructure as a                    The proposal complies.
                                                   result of the development are made at no cost              
                                                   to Council.
                                                   AO4.4                                                                RO4.4
                                                   Development avoids stormwater inflow and                             The proposal complies. Stormwater
                                                   infiltration to the sewer infrastructure network.                   will be designed to avoid inflow and
                                                                                                                        infiltration into the sewer infrastructure
                                                                                                                        network.
                                                   AO4.5                                                                RO4.5
                                                   Stormwater infrastructure is designed to                             The proposal complies.

1
    Solution:         Acceptable Solution                                                                                                                                                        Page 2 of 10
                A/S    Alternative Solution                                     D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                   Job: 23098
                                                                                                                                                                                                        Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                                  22/09/2023

Page 30

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                               Acceptable Outcomes                                  Solution1                      Comments                                      Council Use

                                                   minimise maintenance costs and the
                                                   requirement for specialized equipment for
                                                                                                             
                                                   maintenance techniques.
PO5                                                AO5.1
Stormwater drainage infrastructure is              Stormwater drainage infrastructure avoids
aligned to avoid crossing waterways,               crossing waterways, wetlands drainage lines              N/A
wetlands, drainage lines and ecological            and ecologically important areas or follows the
important areas, or where it is demonstrated       edge of existing disturbed areas.
this is unavoidable, disturbed areas are           AO5.2
reinstated and revegetated upon completion         Stormwater drainage infrastructure avoids
of works.                                          crossing waterways, wetlands drainage lines              N/A
                                                   and ecologically important areas or follows the
                                                   edge of existing disturbed areas.
                                                   AO5.3
                                                   Temporary vehicular crossings of waterways
                                                   must be designed and constructed to be                   N/A
                                                   consistent with the current International
                                                   Erosion Control Association Best Practice
                                                   Book Series.
Stormwater quality and protection of receiving waters
PO6                                                AO6.1                                                               RO6.1
Development is located, designed,                  Stormwater runoff discharging into High                             The proposal complies.
constructed and operated to protect and            Ecological Value waters as a result of
enhance environmental values and water
quality of waterways, wetlands, lakes,
                                                   development causes no increase in gross
                                                   pollutants, total suspended solids, total
                                                                                                             
ground waters and drainage systems.                phosphorous or total nitrogen compared to
                                                   a pre-development scenario.
Editor’s note: Environmental values of
waters and water quality objectives are            AND
prescribed in Schedule 1 of the                    AO6.2                                                               RO6.2
Environmental Protection (Water) Policy            All stormwater runoff is treated to achieve                         The proposal complies. A bio-
2009 and are identified on the State               maximum removal of nutrients, gross                                 retention system will be incorporated
Planning Policy Interactive Mapping System         pollutants and suspended solids as determined                       into the drainage design to achieve
                                                   by cost to efficiency ratios. (e.g. bioretention                    the target pollutant reduction loads.
                                                   basins must be sized to                                             Refer to the SBSMP prepared by

1
    Solution:         Acceptable Solution                                                                                                                                                       Page 3 of 10
                A/S    Alternative Solution                                    D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                  Job: 23098
                                                                                                                                                                                                       Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                                 22/09/2023

Page 31

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                               Acceptable Outcomes                                  Solution1                      Comments                                      Council Use

                                                   achieve at least 80% reduction in total
                                                   suspended solids, 60% reduction in total
                                                                                                                      MCE.

                                                   phosphorous, 45% reduction in total nitrogen
                                                   and 90% reduction in gross pollutants >5mm)

                                                   OR
                                                   AO6.3
                                                   Developments achieve a minimum 3 drop
                                                   rating consistent with the Water by Design
                                                   Living Waterways Scoring Guide (Healthy
                                                   Land and Water).

                                                   Editor’s note— PSP6 Engineering Design                   N/A
                                                   Standards - Roads, Drainage and Earthworks
                                                   provides guidance on stormwater design and
                                                   modelling requirements

PO7                                                AO7.1                                                               RO7.1
Water quality treatment systems use natural        Water quality treatment systems are designed                        The proposal complies.
processes and                                      to be integrated into the landscape consistent
materials, whenever possible, and are              with the technical design guideline published
integrated into development                        by Healthy Land and Water Water by Design
to enhance biodiversity and landscape              for the                                                   
benefits                                           feature. (eg. For Bioretention Basins:
                                                   Bioretention Technical Design Guidelines
                                                   (October 2014) and for Wetland Systems the
                                                   Wetland Technical Design Guideline (May
                                                   2017).
PO8                                                AO8.1
Water quality treatment infrastructure to be       Detailed life cycle costing is provided for the
                                                                                                            N/A
dedicated as public assets are proven to be        entire treatment train system including
suitable for its use and of a cost                 replacement costs of asset parts.
effective and efficient standard                   AO8.2
                                                   Treatment systems dedicated as public assets
                                                   are designed to minimise maintenance,
                                                   renewal and adaption costs and the                       N/A

1
    Solution:         Acceptable Solution                                                                                                                                                       Page 4 of 10
                A/S    Alternative Solution                                    D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                  Job: 23098
                                                                                                                                                                                                       Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                                 22/09/2023

Page 32

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                               Acceptable Outcomes                                  Solution1                      Comments                                      Council Use

                                                   requirement for specialised equipment,
                                                   material or maintenance
                                                   techniques.
                                                   AO8.3
                                                   Vegetated stormwater management systems
                                                   to be dedicated as public assets are
                                                   established and maintained during the
                                                   maintenance period to ensure optimal                     N/A
                                                   vegetated growth and that the functional
                                                   elements of the system achieve the design
                                                   function at the end of the maintenance period.
PO9                                                AO9.1                                                               RO9.1
Treatment systems are designed to                  Free draining inlets and outlets are provided to                    The proposal complies. The proposal
eliminate or minimise health, safety and           ensure that waters do not pond for more than                       stormwater treatment system will be
aesthetic hazards, including risks associated      24 hours.                                                           designed to be free draining.
with insect breeding, odour and public             AO9.2                                                               RO9.2
safety.                                            Developments are designed to eliminate                              The proposal complies. Retaining
                                                   retaining walls in excess of 0.8m for any water                    walls do not exceed 0.8m.
                                                   quality treatment device.
Hydraulic and Waterway Stability
PO10                                               AO10                                                                RO10
Development prevents increased bed and             The development is designed to:                                     The proposal complies. Refer to the
bank erosion and                                  (a) limit the peak 1 year ARI event discharge                        SBSMP prepared by MCE.
sedimentation in receiving waterways by               within the receiving waterway to the pre-
avoiding changes in low                               development peak 1 year discharge;
rate, peak flow run-off and flow duration.        (b) maximise pervious areas by using
                                                      pervious alternatives for otherwise
                                                      impervious areas wherever possible;
                                                  (c) provide for capture and reuse of
                                                      stormwater for non-potable purposes for
                                                      gardening, toilet flushing, laundry and hot
                                                      water supply uses;                                     
                                                  (d) incorporate appropriate detention features;
                                                      and
                                                  (e) incorporate natural channel design

1
    Solution:         Acceptable Solution                                                                                                                                                       Page 5 of 10
                A/S    Alternative Solution                                    D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                  Job: 23098
                                                                                                                                                                                                       Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                                 22/09/2023

Page 33

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                              Acceptable Outcomes                                 Solution1                      Comments                                      Council Use

                                                        principles.

                                                  Editor’s note: The Sustainable Building
                                                  Design Code includes requirements for
                                                  stormwater capture and reuse.
PO11                                              AO11.1
Water sensitive urban design principles are       The design and construction of a natural
applied to achieve multifunctional design of      channel or natural channel rehabilitation works
waterways, wetlands and drainage lines that       are in accordance with the Natural Channel              N/A
provide for:                                      Design Guidelines (Brisbane City Council)
 (a) stormwater conveyance that uses              having regard to local topography, geology and
     natural channel design;                      geomorphology.
 (b) protection of landscape features and         AO11.2
     ecological important areas including         Landscape features, plant species and habitat
     terrestrial and aquatic habitat;             types used in stormwater conveyance                     N/A
 (c) aesthetic and passive recreation             channels are complementary to the local
     values;                                      context and natural waterways
 (d) flood management and conveyance of           AO11.3
     external catchment stormwater through        Bank and bed stability and planting densities
     the development;                             result in a stable channel over the long term           N/A
 (e) landscaping that incorporates local          and minimal potential for pest plant species.
     native species; and                          AO11.4
 (f) bed and bank stability                       Water Sensitive Design measures are
                                                  incorporated into the development, as detailed
                                                  in the document Water Sensitive Designs
                                                  small improvements, new ideas, concepts and             N/A
                                                  sketch designs for stormwater filtration
                                                  systems (Healthy Waterways Water by
                                                  Design).
                                                  AO11.5
                                                  Floodplain management is designed in
                                                  accordance with the Framework for the
                                                  Integration of Flood and Stormwater                     N/A
                                                  Management into Open Space published by
                                                  Healthy Waterways Water by Design (version
                                                  current at the time of development

1
    Solution:        Acceptable Solution                                                                                                                                                      Page 6 of 10
                A/S   Alternative Solution                                   D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                 Job: 23098
                                                                                                                                                                                                     Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                               22/09/2023

Page 34

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                              Acceptable Outcomes                                 Solution1                      Comments                                      Council Use

                                                  application).
PO12                                              AO12.1
Development protects in-stream ecology by         Where run-off from or within the site passes
maintaining pre development low flow              through or drains to natural channels,
discharge regimes and maintaining fish            waterways or wetlands, development protects
passages.                                         in steam ecology by maintaining pre-
                                                  development low flow discharge regimes in               N/A
                                                  accordance with the frequent flow
                                                  management objectives in PSP6 Engineering
                                                  Design Standards - Roads, drainage and
                                                  earthworks
                                                  AO12.2
                                                  Instream structures such as roads, bridges,
                                                  culverts, and other stormwater infrastructure           N/A
                                                  do not cause barriers to fish passage and
                                                  facilitate the movement of terrestrial and
                                                  aquatic fauna along waterway corridors
                                                  AO12.3
                                                  Benthic substrate retains a continuous grade
                                                  with the direction of flow consistent with the          N/A
                                                  natural bed profile.
PO13                                              AO13.1
Development is designed and constructed to        The location and form of stormwater discharge
maintain surface and ground water balances        points do not alter the pre-development                 N/A
that sustain the environmental values of          hydrology of receiving surface water or
water dependent ecosystems, including             groundwater.
downstream aquatic, riparian, wetland and         AO13.2
terrestrial ecosystems.                           Developments located on groundwater
                                                  recharge or discharge areas are designed and
                                                  managed in accordance with a groundwater
                                                  recharge and discharge management plan
                                                  prepared by a suitably
                                                  experienced and qualified groundwater
                                                  hydrologist. The groundwater recharge or
                                                  discharge must demonstrate that the                     N/A
                                                  development does not affect groundwater

1
    Solution:        Acceptable Solution                                                                                                                                                      Page 7 of 10
                A/S   Alternative Solution                                   D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                 Job: 23098
                                                                                                                                                                                                     Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                               22/09/2023

Page 35

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                               Acceptable Outcomes                                 Solution1                      Comments                                      Council Use

                                                   balances beyond the property boundaries

                                                   Editor's Note— PSP6 Engineering Design
                                                   Standards - Roads, drainage and earthworks
                                                   provides guidance on prepare a groundwater
                                                   recharge and discharge plan.
Construction and establishment of stormwater management systems
PO14                                               AO14.1                                                             RO14.1
Construction methods provide for                   An erosion and sediment control plan prepared                      An Erosion and Sedimentation Control
appropriate controls to avoid entry and            in accordance with the International Erosion                       Plan shall be prepared (prior to
transport of litter, sediment, and associated      Control Association Best Practice Books                            commencement of construction) and
prescribed water contaminants into receiving       demonstrates that the capture and release of                       maintained for the management of the
waters.                                            stormwater achieves the design objectives                          sediment laden stormwater during the
                                                   listed in Table A: Construction phase –                            construction phase in accordance with
Editor's note— Water contaminants are              stormwater management design objectives                            IECAs Best Practice guidelines.
prescribed in the                                  of the State Planning Policy (Appendix 2).               
Environmental Protection Act 1994
                                                   Editor’s note— PSP6 Engineering Design
                                                   Standards - Roads, drainage and earthworks
                                                   provides guidance on requirements for
                                                   preparing an Erosion Management Plan.
                                                   AO14.2                                                             RO14.2
                                                   Construction works are designed and                                Unnecessary disturbance to soil shall
                                                   managed to restrict the extent of clearing and                     be avoided and soil surfaces shall
                                                   soil exposure to the minimum necessary for
                                                   access, and safe construction at any one time
                                                                                                                     remain stabilized.


                                                   AO14.3                                                             RO14.3
                                                   For buildings:                                                     The proposal complies. Refer to
                                                  (a) upstream runoff is diverted around the                          RO14.1.
                                                       construction site;
                                                  (b) sediment barriers are provided downslope
                                                       of disturbed areas to prevent sediment
                                                       washing into gutters, drains and
                                                       waterways , wetlands or drainage lines
                                                       either on or off the site; and

1
    Solution:         Acceptable Solution                                                                                                                                                      Page 8 of 10
                A/S    Alternative Solution                                   D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                 Job: 23098
                                                                                                                                                                                                      Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                                22/09/2023

Page 36

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                              Acceptable Outcomes                                 Solution1                      Comments                                      Council Use

                                                 (c) temporary or permanent downpipes are
                                                      connected to the stormwater system
                                                                                                           
                                                      before laying the roof; or
                                                 (d) localised erosion is avoided by directing
                                                      flow from downpipes over non-erosive
                                                      areas.
                                                  AO14.4                                                             RO14.4
                                                  Chemical flocculants used as part of an                            The proposal complies. Refer to
                                                  erosion and sediment control plan do not harm                     RO14.1.
                                                  the environmental values within receiving
                                                  waters.
                                                  AO14.5                                                             RO14.4
                                                  Appropriately sized litter containment areas,                      The proposal complies. Refer to
                                                  with provision for sorting recyclables are                        RO14.1.
                                                  provided for the type of litter expected to be
                                                  generated onsite.
Wastewater management and effluent disposal
PO15                                              AO15
Development does not discharge                    Wastewater (non-sewage) generated from the
wastewater unless it can be demonstrated to       development is collected and contained on-
not compromise environmental values of            site, and is;
waters and water quality objectives.             (a) lawfully disposed to sewer; or
                                                 (b) transferred off-site for treatment/disposal
Editor’s Note—Environmental values of                  to an appropriately
waters and water quality objectives are                licenced facility;
prescribed in Schedule 1 of the                  (c) reused on-site in a closed-cycle irrigation
Environmental Protection (Water) Policy                scheme, industrial processes, washing or
2009.                                                  cleaning or other purpose; or                      N/A
                                                 (d) treated to meet the drinking water supply
                                                       environmental values prior to release.

                                                  Editor’s Note—The Plumbing and Drainage
                                                  Act 2003 sets out requirements for wastewater
                                                  management.



1
    Solution:        Acceptable Solution                                                                                                                                                      Page 9 of 10
                A/S   Alternative Solution                                   D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                 Job: 23098
                                                                                                                                                                                                     Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                               22/09/2023

Page 37

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                              Acceptable Outcomes                                   Solution1                      Comments                                      Council Use

PO16                                              AO16
On-site effluent treatment and disposal           An onsite effluent system and disposal area is:
systems are designed, constructed and            (a) not located on a slope greater than 1 in
managed to not compromise the                         (10%);
environmental values of waters and water         (b) not located at or below the 1% annual
quality objectives.                                   exceedance probability (AEP flood event);
                                                 (c) not located within a riparian buffer area
                                                      mapped on a Biodiversity, Waterways and
                                                      Wetlands Overlay Map; and
                                                 (d) setback 400 metres minimum from the full
                                                      supply level of Lake Macdonald.

                                                  Editor’s Note—The Plumbing and Drainage
                                                  Act 2003 sets out requirements for on-site                N/A
                                                  effluent treatment and disposal. The
                                                  Queensland Plumbing and Wastewater Code
                                                  and associated
                                                  guidelines are used to confirm the suitability of
                                                  each site to accommodate an on-site
                                                  sewerage facility; or where a centrally located
                                                  group collection treatment system is proposed,
                                                  confirmation as to the suitability of the
                                                  designated site to accommodate the onsite
                                                  sewerage facility. Additionally, where the
                                                  combined total peak design capacity of effluent
                                                  treatment is less than 21 equivalent persons,
                                                  the design of the system achieves a low to
                                                  medium risk classification in accordance with
                                                  Seqwater’s Land Use Risk Tool for onsite
                                                  sewerage facilities




1
    Solution:        Acceptable Solution                                                                                                                                                       Page 10 of 10
                A/S   Alternative Solution                                     D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                   Job: 23098
                                                                                                                                                                                                       Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                                 22/09/2023

Page 38

                                                           23098 - SBSMP/2
                                                                 Page 24




                                             APPENDIX E


                           RATIONAL METHOD CALCULATIONS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 39

                                                              Rational Method Peak Flow Calculations
Job No:              23098                                                                                                                                                  MORGAN CONSULTING
Job Type:            Proposed Townhouse Development                                                                                                                          ENGINEERS PTY LTD
Address:             5 Pearl Street, Cooroy                                                                                                                              1 GREAT GEORGE STREET
Council:             NSC                                                                                                                                                   PADDINGTON QLD 4064


IFD Data:            26.4125 (S),152.9125 (E)                               Minor Storm:      Q10                                                                            Designed:      RC
1
    I10              70mm/hr                                                Major Storm:     Q100                                                                            Checked:       HM

Pre Development                                                                                          Post Development

Time of Concentration

Standard Inlet Time                                                                                      Standard Inlet Time
     Standard Inlet Time                            mins                                                        Standard Inlet Time                 5   mins

Sheet Flow (Friends Equation)
     Sheet flow length (L)                    64      m                                                  Pipe Flow
           roughness (n)                    0.03             short grass                                               Flow distance        68.26        m      Pipe
              Fall of NSL                   2.21     m                                                                Fall of channel                    m
     Slope of Surface (S)                    3.5     %                                                                 Flow Velocity             2.5    m/s
                      total                 10.0    mins                                                                         total           0.5    mins
Concentrated Overland Flow                                                                               Concentrated Overland Flow
           Flow distance                        0    m                                                               Flow distance                       m
                 velocity                     0.7   m/s                                                                    velocity              0.7    m/s
                    mins                      0.0   mins                                                                      mins               0.0    mins
   Surface type multiplier                    3.0                                                            Surface type multiplier             4.0
                     total                    0.0   mins                                                                       total             0.0    mins

Total tc                                    10.0    mins                                                                  Total tc               5.5    mins



Runoff Volume Calculations

          Name        Area (ha)        tc              fi     C10                                            Name          Area (ha)        tc             fi    C10
                       0.227                         0.24     0.75                                                          0.227                        0.74    0.85

             Total      0.227         10.0                    0.75                                                Total      0.227         5.5                   0.85

                     Frequency                                                                                            Frequency
        ARI                            Cy             Iy                     Qy                               ARI                           Cy            Iy              Qy
                       Factor                                A (Ha)                                                         Factor                             A (Ha)
      (years)                       (Fy*C10)        (mm/h)                 (m3/s)                           (years)                      (Fy*C10)       (mm/h)          (m3/s)
                        (Fy)                                                                                                 (Fy)
          3 mth                                                            0.018                             3 mth                                                      0.025
            1           0.800        0.599           97       0.227        0.037                               1             0.800        0.679          118    0.227   0.051
            2           0.850        0.636           110      0.227        0.044                               2             0.850        0.721          133    0.227   0.060    37%
            5           0.950        0.711           148      0.227        0.066                               5             0.950        0.806          180    0.227   0.092    38%
           10           1.000        0.749           172      0.227        0.081                              10             1.000        0.848          211    0.227   0.113    39%
           20           1.050        0.786           196      0.227        0.097                              20             1.050        0.891          241    0.227   0.135    39%
           50           1.150        0.861           225      0.227        0.122                              50             1.150        0.975          280    0.227   0.172    41%
           100          1.200        0.898           247      0.227        0.140                              100            1.200        1.000          309    0.227   0.195    39%




                                                                                           Page 1 of 1                                                                               20/09/2023

Page 40

                                                           23098 - SBSMP/2
                                                                 Page 25




                                             APPENDIX F


                  CONCEPT SITE LEVELS AND DRAINAGE PLANS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 41

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retai ned or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 42

                                                            23098 - SBSMP/2
                                                                  Page 26




                                             Appendix G


                                                  BOM IFD




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 43

Copyright Commonwealth of Australia 2016 Bureau of Meteorology (ABN 92 637 533 532)

IFD Design Rainfall Intensity (mm/h)
29-Aug-23

Issued:

Location La5 Pearl Stree: Cooroy
Requested Latitude
Nearest gri Latitude

Duration
1 min

2 min

3 min

4 min

5 min

10 min
15 min
20 min
25 min
30 min
45 min

1 hour
1.5 hour
2 hour

3 hour
4.5 hour
6 hour

9 hour
12 hour
18 hour
24 hour
30 hour
36 hour
48 hour
72 hour
96 hour
120 hour
144 hour
168 hour

Duration inn

UU BWNPR

10
15
20
25
30
45
60
90
120
180
270
360
540
720
1080
1440
1800
2160
2880
4320
5760
7200
8640

10080

165
141
132
126
120
97.3
82.3
71.8
64
58
46
38.7
30.2
25.3
19.8
15.4
13
10.2
8.54
6.63
5.51
4.75
4.19
3.42
2.53
2.04
1.71
1.49
1.33

-26.4153 Longitude
26.4125 (S) Longitude 152.9125 (E)

50%
186
159
149
142
135
110

92.9

81

72.2

65.4

51.9

43.8

34.3

28.8

22.6

17.7

15

11.8

9.95

7.78

6.48

5.6

4.95

4.04

2.99

2.4

2.02

1.75

1.56

152.912

Annual Exceedance Probability (AEP)
63.20%

20%
250
216
203
192
183
148
125
109

97.1

88.1

70.3

59.5

47

39.8

31.5

25.1

21.4

17.1

14.6

11.5

9.7

8.43

7.48

6.15

4.58

3.67

3.08

2.66

2.35

10%
293
256
239
226
215
172
145
127
113
103

82.6

70.2

55.8

47.4

37.8

30.3

26

20.9

17.9

14.2

12

10.5

9.35

7.72

5.78

4.64

3.89

3.36

2.97

5%
333
295
275
259
245
196
165
144
129
117

94.5
80.7
64.4

55
44.1
35.5
30.5
24.7
21.2

17
14.4
12.6
11.3
9.37
7.06
5.69
4.78
4.12
3.63

2%
385
348
323
303
285
225
190
166
149
136
110

94.5
76.1
65.3
52.7
42.7
36.8
29.9
25.8
20.8
17.7
15.6

14
11.7
8.86
7.17
6.02
5.19
4.55

1%
424
390
360
336
315
247
208
182
164
150
122
105

85.1
73.3
59.4
48.3
41.8

34
29.4
23.8
20.4

18
16.2
13.6
10.4
8.41
7.06
6.08
5.32

Page 44

                                                           23098 - SBSMP/2
                                                                 Page 27




                                             Appendix H


                        XPSTORM PRE DEVELOPMENT RESULTS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 45

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

 

Summary information:

 

6 Total No. of Ensembles: 70

 

7 No. of Storms per ensemble: 10
8 No. of AEP Bands: 7

9 Object Name: PRE DEV
0 Result type: Max Flow
2

13. Results:

 

AEP: 1% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.1185 0.1298 0.1190 0.1360 0.1333 0.1350 0.1313 0.1241 0.1419 0.1261 0.1295 0.0072 0.1306
ECN_lpet_15min 0.1348 0.1321 0.1117 0.1088 0.1389 0.1312 0.1150 0.1634 0.1349 0.1129 0.1284 0.0159 0.1316
ECN_lpet_1_Shr 0.0784 0.0907 0.0973 0.0849 0.0970 0.0953 0.0918 0.1159 0.0863 0.0954 0.0933 0.0095 0.0935

ECN_lp¢et_lhr 0.1408 0.1162 0.0919 0.1013 0.0744 0.1143 0.0801 0.0970 0.0977 0.0946 0.1008 0.0181 0.0974

ECN_lpet_20min 0.1151 0.1564 0.1151 0.1043 0.1115 0.1229 0.1108 0.1142 0.1174 0.1305 0.1198 0.0139 0.1151

ECN_lpet_25min 0.1070 0.1586 0.1205 0.1194 0.1263 0.1105 0.1031 0.1261 0.1137 0.1351 0.1220 0.0153 0.1199

ECN_lpcet_2hr 0.1013 0.0832 0.0774 0.0915 0.0919 0.0850 0.0655 0.0693 0.0786 0.0977 0.0841 0.0111 0.0841
ECN_lpet_30min 0.1154 0.1222 0.1506 0.0962 0.1127 0.1413 0.1092 0.1128 0.1205 0.1096 0.1191 0.0152 0.1141
ECN_lpcet_3hr 0.0813 0.0795 0.0936 0.0702 0.0523 0.0785 0.0539 0.0956 0.0470 0.1029 0.0755 0.0184 0.0790
ECN_lpet_45min 0.1506 0.1395 0.0950 0.1252 0.1098 0.0919 0.0983 0.1364 0.0791 0.1153 0.1141 0.0222 0.1126
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_15min.
The median pattern for this ensemble is storm 2 (storm name : ECN_Ipct_15min_2).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_lpct_15min_8).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_10pet_10min 0.0723 0.0737 0.0687 0.0742 0.0806 0.0759 0.0784 0.0795 0.0739 0.0774 0.0755 0.0034 0.0751
ECN_10pet_15min 0.0713 0.0746 0.0798 0.0862 0.0845 0.0798 0.0748 0.0821 0.0999 0.0979 0.0831 0.0090 0.0810
ECN_10pet_1_Shr 0.0791 0.0509 0.0738 0.0736 0.0589 0.0645 0.0536 0.0522 0.0466 0.0630 0.0616 0.0105 0.0609

ECN_10pet_1hr 0.0856 0.0644 0.0629 0.0572 0.0691 0.0686 0.0695 0.0690 0.0596 0.0931 0.0699 0.0106 0.0688
ECN_10pet_20min 0.0649 0.0718 0.0798 0.0905 0.0879 0.0818 0.0760 0.1052 0.1067 0.0690 0.0834 0.0136 0.0808
ECN_10pet_25min 0.0724 0.1054 0.0608 0.0631 0.0596 0.1039 0.0746 0.0760 0.0808 0.0959 0.0793 0.0162 0.0753

ECN_10pet_2hr 0.0666 0.0442 0.0582 0.0843 0.0589 0.0557 0.0621 0.0460 0.0638 0.0609 0.0601 0.0106 0.0599
ECN_10pet_30min 0.0551 0.0876 0.0952 0.0690 0.0624 0.0813 0.0961 0.0812 0.0842 0.0873 0.0800 0.0129 0.0828

ECN_10pet_3hr 0.0722 0.0464 0.0451 0.0621 0.0540 0.0347 0.0507 0.0390 0.0457 0.0455 0.0495 0.0104 0.0461
ECN_10pet_45min 0.0765 0.0771 0.0860 0.0663 0.0685 0.0679 0.0656 0.0528 0.0937 0.0863 0.0741 0.0116 0.0725

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_30min.

The median pattern for this ensemble is storm 9 (storm name : ECN_10pct_30min_9).

The pattern with the greatest <Max Flow> for this ensemble is storm 7 (Storm name : ECN_10pct_30min_7).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_2pet_10min 0.1060 0.1160 0.1064 0.1214 0.1191 0.1206 0.1173 0.1110 0.1264 0.1033 0.1147 0.0073 0.1166
ECN_2pet_15min 0.1202 0.1163 0.1001 0.0984 0.1258 0.1176 0.1044 0.1447 0.1222 0.1026 0.1152 0.0136 0.1169
ECN_2pet_1_Shr 0.0691 0.0799 0.0862 0.0710 0.0860 0.0845 0.0813 0.1019 0.0765 0.0845 0.0821 0.0088 0.0829

ECN_2pcet_lhr 0.1255 0.1040 0.0813 0.0908 0.0665 0.1025 0.0719 0.0864 0.0875 0.0842 0.0901 0.0162 0.0869

ECN_2pet_20min 0.1042 0.1414 0.1029 0.0933 0.1012 0.1099 0.1005 0.1032 0.1061 0.1186 0.1081 0.0127 0.1037

ECN_2pet_25min 0.0967 0.1423 0.1089 0.1082 0.1127 0.1002 0.0934 0.1141 0.1021 0.1223 0.1101 0.0136 0.1085
ECN_2pcet_2hr 0.0889 0.0736 0.0684 0.0807 0.0815 0.0753 0.0580 0.0614 0.0695 0.0858 0.0743 0.0096 0.0744
ECN_2pet_30min 0.1036 0.1069 0.1359 0.0870 0.1017 0.1254 0.0989 0.1021 0.1089 0.0989 0.1069 0.0133 0.1028
ECN_2pet_3hr 0.0719 0.0703 0.0829 0.0612 0.0463 0.0695 0.0473 0.0846 0.0416 0.0911 0.0667 0.0164 0.0699
ECN_2pet_45min 0.1347 0.1244 0.0851 0.1125 0.0988 0.0816 0.0885 0.1217 0.0710 0.1030 0.1021 0.0198 0.1009
CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_15min.
The median pattern for this ensemble is storm 6 (storm name : ECN_2pct_15min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).
AEP: 20% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

Page 46

 

 

 

 

 

 

 

 

 

 

 

 

 

ECN_20pet_10min 0.0590 0.0567 0.0567 0.0622 0.0554 0.0576 0.0570 0.0619 0.0536 0.0596 0.0580 0.0026 0.0573
ECN_20pet_15min 0.0577 0.0580 0.0623 0.0655 0.0652 0.0670 0.0692 0.0725 0.0782 0.0820 0.0678 0.0076 0.0662
ECN_20pet_1_Shr 0.0510 0.0683 0.0664 0.0404 0.0695 0.0350 0.0448 0.0557 0.0708 0.0572 0.0559 0.0122 0.0564

ECN_20pet_lhr 0.0811 0.0492 0.0573 0.0662 0.0679 0.0646 0.0452 0.0461 0.0700 0.0572 0.0605 0.0110 0.0610
ECN_20pet_20min 0.0569 0.0625 0.0556 0.0672 0.0646 0.0608 0.0741 0.0625 0.0774 0.0882 0.0670 0.0096 0.0636
ECN_20pet_25min 0.0643 0.0625 0.0515 0.0537 0.0624 0.0667 0.0745 0.0659 0.0889 0.0794 0.0670 0.0107 0.0651

ECN_20pet_2hr 0.0502 0.0487 0.0498 0.0457 0.0574 0.0421 0.0760 0.0694 0.0413 0.0455 0.0526 0.0110 0.0492
ECN_20pcet_30min 0.0901 0.0563 0.0518 0.0540 0.0623 0.0694 0.0734 0.0818 0.0692 0.0735 0.0682 0.0117 0.0693

ECN_20pet_3hr 0.0490 0.0560 0.0681 0.0439 0.0365 0.0318 0.0366 0.0290 0.0362 0.0424 0.0429 0.0113 0.0395
ECN_20pet_45min 0.0617 0.0615 0.0515 0.0663 0.0654 0.0529 0.0485 0.0528 0.0728 0.0705 0.0604 0.0081 0.0616

CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min.

The median pattern for this ensemble is storm 6 (storm name : ECN_20pct_30min_6).

The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).

REP: 5% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_5pet_10min 0.0954 0.0967 0.0916 0.0866 0.0944 0.0890 0.1010 0.0932 0.0970 0.0988 0.0944 0.0042 0.0949
ECN_5pet_15min 0.0820 0.0867 0.0910 0.1018 0.1000 0.0913 0.0862 0.0962 0.1197 0.1168 0.0972 0.0121 0.0938
ECN_5pet_1_5hr 0.0929 0.0623 0.0863 0.0867 0.0716 0.0751 0.0631 0.0678 0.0544 0.0738 0.0734 0.0116 0.0727

ECN_5pcet_lhr 0.0995 0.0765 0.0733 0.0669 0.0805 0.0801 0.0808 0.0799 0.0697 0.1081 0.0815 0.0122 0.0800
ECN_5pet_20min 0.0859 0.0824 0.0923 0.1040 0.1053 0.0939 0.0868 0.1220 0.1240 0.0786 0.0975 0.0151 0.0931
ECN_5pet_25min 0.0827 0.1212 0.0721 0.0740 0.0803 0.1207 0.0852 0.0873 0.0932 0.1097 0.0926 0.0173 0.0863

ECN_5pcet_2hr 0.0783 0.0519 0.0683 0.0987 0.0695 0.0715 0.0729 0.0540 0.0744 0.0728 0.0712 0.0123 0.0722
ECN_5pet_30min 0.0679 0.1016 0.1107 0.0795 0.0725 0.0935 0.1108 0.0938 0.0970 0.1002 0.0927 0.0142 0.0954

ECN_5pcet_3hr 0.0850 0.0546 0.0590 0.0728 0.0634 0.0408 0.0596 0.0458 0.0537 0.0534 0.0588 0.0121 0.0568
ECN_5pet_45min 0.0888 0.0906 0.1010 0.0764 0.0792 0.0853 0.0761 0.0620 0.1081 0.0999 0.0867 0.0132 0.0871

CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_Spct_30min.

The median pattern for this ensemble is storm 9 (storm name : ECN_Spct_30min_9).

The pattern with the greatest <Max Flow> for this ensemble is storm 7 (storm name : ECN_Spct_30min_7).

AEP: 50% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_50pet_10min 0.0298 0.0333 0.0333 0.0368 0.0335 0.0352 0.0336 0.0328 0.0309 0.0304 0.0329 0.0020 0.0333
ECN_50pet_15min 0.0387 0.0380 0.0415 0.0400 0.0393 0.0430 0.0446 0.0444 0.0458 0.0497 0.0425 0.0035 0.0422
ECN_50pet_1_Shr 0.0347 0.0483 0.0449 0.0288 0.0490 0.0249 0.0315 0.0396 0.0498 0.0410 0.0393 0.0085 0.0403

ECN_50pet_1hr 0.0533 0.0338 0.0392 0.0399 0.0483 0.0467 0.0316 0.0326 0.0498 0.0411 0.0416 0.0072 0.0405
ECN_50pet_20min 0.0412 0.0417 0.0379 0.0460 0.0408 0.0434 0.0433 0.0422 0.0520 0.0584 0.0447 0.0058 0.0427
ECN_50pet_25min 0.0407 0.0422 0.0364 0.0375 0.0448 0.0419 0.0475 0.0478 0.0617 0.0563 0.0457 0.0076 0.0435

ECN_50pet_2hr 0.0348 0.0336 0.0321 0.0323 0.0411 0.0292 0.0530 0.0452 0.0288 0.0324 0.0363 0.0074 0.0330
ECN_50pet_30min 0.0641 0.0347 0.0337 0.0389 0.0452 0.0400 0.0520 0.0530 0.0490 0.0508 0.0461 0.0090 0.0471

ECN_50pet_3hr 0.0346 0.0394 0.0482 0.0268 0.0256 0.0221 0.0254 0.0202 0.0254 0.0300 0.0298 0.0082 0.0262
ECN_50pet_45min 0.0373 0.0365 0.0336 0.0456 0.0455 0.0363 0.0342 0.0383 0.0525 0.0505 0.0410 0.0065 0.0378

CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_30min.

The median pattern for this ensemble is storm 9 (storm name : ECN_SOpct_30min_9).

The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_50pct_30min_1).

REP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0258 0.0240 0.0240 0.0318 0.0249 0.0261 0.0243 0.0284 0.0218 0.0262 0.0257 0.0026 0.0253
ECN_63pcet_15min 0.0300 0.0330 0.0321 0.0317 0.0339 0.0331 0.0347 0.0350 0.0395 0.0398 0.0343 0.0030 0.0335
ECN_63pet_1_Shr 0.0281 0.0419 0.0379 0.0251 0.0426 0.0216 0.0273 0.0340 0.0437 0.0360 0.0338 0.0075 0.0350

ECN_63pet_lhr 0.0436 0.0281 0.0322 0.0313 0.0415 0.0403 0.0276 0.0280 0.0433 0.0358 0.0352 0.0062 0.0340
ECN_63pet_20min 0.0350 0.0323 0.0322 0.0399 0.0356 0.0370 0.0343 0.0368 0.0449 0.0487 0.0377 0.0051 0.0362
ECN_63pcet_25min 0.0356 0.0369 0.0319 0.0315 0.0393 0.0365 0.0410 0.0415 0.0525 0.0472 0.0394 0.0062 0.0381

ECN_63pet_2hr 0.0288 0.0284 0.0257 0.0281 0.0360 0.0252 0.0448 0.0328 0.0250 0.0283 0.0303 0.0058 0.0284
ECN_63pcet_30min 0.0554 0.0305 0.0295 0.0338 0.0393 0.0321 0.0443 0.0413 0.0419 0.0418 0.0390 0.0074 0.0403

ECN_63pet_3hr 0.0300 0.0340 0.0420 0.0203 0.0223 0.0191 0.0219 0.0175 0.0220 0.0261 0.0255 0.0073 0.0221
ECN_63pcet_45min 0.0299 0.0297 0.0268 0.0383 0.0387 0.0304 0.0299 0.0337 0.0460 0.0442 0.0347 0.0063 0.0320

 

CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_30min.
The median pattern for this ensemble is storm 8 (storm name : ECN_63pct_30min_8).
The pattern with the greatest <Max Flow> for this ensemble is storm 1 (Storm name : ECN_63pct_30min_1).

 

 

Page 47

                                                           23098 - SBSMP/2
                                                                 Page 28




                                             Appendix I


                       XPSTORM POST DEVELOPMENT RESULTS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 48

 

Summary information:

 

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

6 Total No. of Ensembles: 70

7 No. of Storms per ensemble: 10
No. of AEP Bands: 7

Object Name:
Result type:

 

 

13 Results:

POST DEV GROUND
Max Flow

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AEP: 1% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.0561 0.0636 0.0565 0.0677 0.0659 0.0670 0.0646 0.0599 0.0747 0.0589 0.0635 0.0055 0.0641
ECN_lpet_15min 0.0713 0.0660 0.0542 0.0544 0.0697 0.0670 0.0580 0.0845 0.0705 0.0567 0.0652 0.0091 0.0665
ECN_lpet_1_Shr 0.0427 0.0491 0.0504 0.0428 0.0513 0.0494 0.0473 0.0567 0.0456 0.0496 0.0485 0.0040 0.0493

ECN_lp¢et_lhr 0.0743 0.0616 0.0480 0.0534 0.0381 0.0590 0.0420 0.0482 0.0508 0.0496 0.0525 0.0099 0.0502

ECN_lpet_20min 0.0631 0.0826 0.0554 0.0500 0.0572 0.0616 0.0546 0.0578 0.0571 0.0667 0.0606 0.0086 0.0575

ECN_lpet_25min 0.0587 0.0825 0.0592 0.0619 0.0654 0.0563 0.0549 0.0656 0.0557 0.0703 0.0630 0.0080 0.0605
ECN_lpcet_2hr 0.0515 0.0435 0.0420 0.0479 0.0474 0.0452 0.0343 0.0359 0.0408 0.0537 0.0442 0.0059 0.0444
ECN_lpet_30min 0.0609 0.0634 0.0788 0.0514 0.0557 0.0744 0.0567 0.0597 0.0644 0.0576 0.0623 0.0081 0.0603
ECN_lpcet_3hr 0.0421 0.0411 0.0484 0.0356 0.0274 0.0406 0.0275 0.0495 0.0246 0.0534 0.0390 0.0095 0.0409
ECN_lpet_45min 0.0794 0.0738 0.0515 0.0630 0.0563 0.0480 0.0518 0.0668 0.0405 0.0587 0.0590 0.0114 0.0575
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_15min.
The median pattern for this ensemble is storm 6 (storm name : ECN_Ipct_15min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_lpct_15min_8).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_10pet_10min 0.0375 0.0384 0.0354 0.0384 0.0430 0.0399 0.0445 0.0423 0.0386 0.0462 0.0404 0.0033 0.0393
ECN_10pet_15min 0.0376 0.0368 0.0423 0.0411 0.0421 0.0401 0.0384 0.0391 0.0520 0.0501 0.0420 0.0049 0.0406
ECN_10pet_1_Shr 0.0412 0.0262 0.0387 0.0347 0.0294 0.0330 0.0275 0.0265 0.0251 0.0345 0.0317 0.0053 0.0312

ECN_10pet_1hr 0.0470 0.0352 0.0312 0.0382 0.0347 0.0344 0.0354 0.0359 0.0300 0.0515 0.0373 0.0064 0.0353
ECN_10pet_20min 0.0368 0.0347 0.0392 0.0461 0.0437 0.0412 0.0399 0.0528 0.0545 0.0373 0.0426 0.0064 0.0406
ECN_10pet_25min 0.0380 0.0549 0.0339 0.0333 0.0343 0.0524 0.0378 0.0375 0.0415 0.0477 0.0411 0.0074 0.0379

ECN_10pet_2hr 0.0350 0.0238 0.0306 0.0451 0.0329 0.0325 0.0372 0.0246 0.0327 0.0340 0.0328 0.0057 0.0328
ECN_10pet_30min 0.0288 0.0421 0.0574 0.0352 0.0325 0.0417 0.0493 0.0414 0.0419 0.0453 0.0416 0.0078 0.0418

ECN_10pet_3hr 0.0372 0.0240 0.0232 0.0323 0.0281 0.0182 0.0262 0.0203 0.0238 0.0237 0.0257 0.0053 0.0239
ECN_10pet_45min 0.0424 0.0373 0.0415 0.0350 0.0361 0.0351 0.0354 0.0272 0.0483 0.0473 0.0386 0.0061 0.0367

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_30min.

The median pattern for this ensemble is storm 9 (storm name : ECN_10pct_30min_9).

The pattern with the greatest <Max Flow> for this ensemble is storm 3 (Storm name : ECN_10pct_30min_3).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

ECN_2pet_10min 0.0504 0.0571 0.0507 0.0608 0.0592 0.0602 0.0580 0.0537 0.0672 0.0499 0.0567 0.0053 0.0575

ECN_2pet_15min 0.0642 0.0570 0.0493 0.0494 0.0630 0.0592 0.0526 0.0745 0.0638 0.0514 0.0584 0.0077 0.0581

ECN_2pet_1_Shr 0.0377 0.0435 0.0445 0.0359 0.0455 0.0438 0.0418 0.0497 0.0405 0.0440 0.0427 0.0037 0.0437

ECN_2pcet_lhr 0.0665 0.0552 0.0421 0.0477 0.0342 0.0528 0.0377 0.0424 0.0455 0.0442 0.0468 0.0089 0.0449
ECN_2pet_20min 0.0571 0.0748 0.0498 0.0451 0.0518 0.0544 0.0493 0.0521 0.0516 0.0605 0.0547 0.0078 0.0520
ECN_2pet_25min 0.0529 0.0737 0.0532 0.0560 0.0587 0.0511 0.0498 0.0591 0.0501 0.0636 0.0568 0.0071 0.0546

ECN_2pcet_2hr 0.0454 0.0383 0.0373 0.0424 0.0420 0.0401 0.0304 0.0318 0.0361 0.0475 0.0391 0.0052 0.0392
ECN_2pet_30min 0.0549 0.0551 0.0712 0.0465 0.0501 0.0667 0.0514 0.0541 0.0583 0.0518 0.0560 0.0072 0.0545

ECN_2pet_3hr 0.0372 0.0363 0.0428 0.0309 0.0242 0.0359 0.0240 0.0437 0.0217 0.0472 0.0344 0.0085 0.0361
ECN_2pet_45min 0.0712 0.0656 0.0463 0.0565 0.0506 0.0422 0.0464 0.0595 0.0365 0.0520 0.0527 0.0102 0.0513

CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_15min.
The median pattern for this ensemble is storm 6 (storm name : ECN_2pct_15min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).
AEP: 20% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

Page 49

 

 

 

 

 

 

 

 

 

 

 

 

 

ECN_20pet_10min 0.0310 0.0302 0.0302 0.0380 0.0317 0.0331 0.0300 0.0358 0.0322 0.0314 0.0323 0.0025 0.0315
ECN_20pet_15min 0.0300 0.0341 0.0312 0.0326 0.0309 0.0323 0.0340 0.0363 0.0405 0.0437 0.0346 0.0042 0.0333
ECN_20pet_1_Shr 0.0271 0.0363 0.0337 0.0216 0.0350 0.0188 0.0227 0.0295 0.0373 0.0297 0.0292 0.0062 0.0296

ECN_20pet_lhr 0.0419 0.0252 0.0291 0.0334 0.0371 0.0353 0.0259 0.0247 0.0356 0.0300 0.0318 0.0055 0.0317
ECN_20pet_20min 0.0302 0.0312 0.0266 0.0335 0.0312 0.0311 0.0384 0.0303 0.0369 0.0465 0.0336 0.0054 0.0312
ECN_20pet_25min 0.0311 0.0303 0.0293 0.0283 0.0371 0.0328 0.0371 0.0347 0.0454 0.0391 0.0345 0.0050 0.0337

ECN_20pet_2hr 0.0255 0.0279 0.0241 0.0239 0.0300 0.0220 0.0399 0.0426 0.0220 0.0237 0.0282 0.0070 0.0248
ECN_20pcet_30min 0.0466 0.0267 0.0264 0.0315 0.0318 0.0358 0.0410 0.0400 0.0359 0.0386 0.0354 0.0061 0.0359

ECN_20pet_3hr 0.0255 0.0292 0.0354 0.0220 0.0191 0.0165 0.0188 0.0151 0.0188 0.0222 0.0223 0.0059 0.0205
ECN_20pet_45min 0.0318 0.0314 0.0262 0.0336 0.0345 0.0277 0.0247 0.0284 0.0366 0.0370 0.0312 0.0041 0.0316

CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min.

The median pattern for this ensemble is storm 9 (storm name : ECN_20pct_30min_9).

The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).

REP: 5% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_5pet_10min 0.0469 0.0478 0.0443 0.0438 0.0497 0.0462 0.0540 0.0489 0.0480 0.0555 0.0485 0.0036 0.0479
ECN_5pet_15min 0.0426 0.0418 0.0483 0.0490 0.0503 0.0460 0.0442 0.0465 0.0618 0.0595 0.0490 0.0064 0.0474
ECN_5pet_1_5hr 0.0481 0.0307 0.0452 0.0410 0.0344 0.0384 0.0322 0.0332 0.0291 0.0402 0.0373 0.0060 0.0364

ECN_5pcet_lhr 0.0543 0.0419 0.0363 0.0440 0.0409 0.0401 0.0413 0.0416 0.0351 0.0595 0.0435 0.0073 0.0415
ECN_5pet_20min 0.0453 0.0400 0.0454 0.0534 0.0523 0.0477 0.0457 0.0617 0.0638 0.0426 0.0498 0.0075 0.0467
ECN_5pet_25min 0.0435 0.0633 0.0387 0.0385 0.0391 0.0612 0.0434 0.0431 0.0479 0.0549 0.0474 0.0088 0.0434

ECN_5pcet_2hr 0.0411 0.0278 0.0359 0.0526 0.0384 0.0397 0.0435 0.0287 0.0382 0.0401 0.0386 0.0067 0.0391
ECN_5pet_30min 0.0356 0.0489 0.0659 0.0402 0.0372 0.0481 0.0570 0.0479 0.0485 0.0519 0.0481 0.0087 0.0483

ECN_5pcet_3hr 0.0437 0.0283 0.0293 0.0379 0.0330 0.0214 0.0309 0.0239 0.0280 0.0278 0.0304 0.0062 0.0288
ECN_5pet_45min 0.0492 0.0436 0.0492 0.0403 0.0416 0.0423 0.0408 0.0313 0.0558 0.0545 0.0449 0.0070 0.0430

CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_Spct_30min.

The median pattern for this ensemble is storm 9 (storm name : ECN_Spct_30min_9).

The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_Spct_30min_3).

AEP: 50% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_50pet_10min 0.0211 0.0222 0.0222 0.0258 0.0215 0.0225 0.0220 0.0230 0.0237 0.0208 0.0225 0.0014 0.0222
ECN_50pet_15min 0.0221 0.0251 0.0223 0.0205 0.0193 0.0215 0.0228 0.0235 0.0264 0.0292 0.0233 0.0028 0.0225
ECN_50pet_1_Shr 0.0180 0.0257 0.0225 0.0154 0.0248 0.0132 0.0159 0.0207 0.0264 0.0213 0.0204 0.0044 0.0210

ECN_50pet_1hr 0.0280 0.0167 0.0194 0.0214 0.0263 0.0252 0.0182 0.0173 0.0255 0.0215 0.0219 0.0039 0.0214
ECN_50pet_20min 0.0219 0.0215 0.0192 0.0223 0.0195 0.0217 0.0250 0.0204 0.0248 0.0316 0.0228 0.0035 0.0218
ECN_50pet_25min 0.0194 0.0204 0.0200 0.0193 0.0268 0.0203 0.0240 0.0248 0.0312 0.0271 0.0233 0.0039 0.0222

ECN_50pet_2hr 0.0172 0.0192 0.0155 0.0169 0.0215 0.0155 0.0274 0.0296 0.0157 0.0169 0.0196 0.0048 0.0171
ECN_50pet_30min 0.0327 0.0181 0.0175 0.0227 0.0226 0.0230 0.0289 0.0267 0.0249 0.0264 0.0244 0.0044 0.0240

ECN_50pet_3hr 0.0180 0.0202 0.0251 0.0135 0.0134 0.0115 0.0131 0.0106 0.0132 0.0158 0.0154 0.0042 0.0134
ECN_50pet_45min 0.0217 0.0199 0.0170 0.0218 0.0240 0.0185 0.0177 0.0207 0.0264 0.0266 0.0214 0.0032 0.0212

CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_30min.

The median pattern for this ensemble is storm 9 (storm name : ECN_SOpct_30min_9).

The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_50pct_30min_1).

REP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0185 0.0195 0.0195 0.0226 0.0177 0.0186 0.0194 0.0202 0.0208 0.0183 0.0195 0.0014 0.0195
ECN_63pcet_15min 0.0195 0.0222 0.0197 0.0181 0.0168 0.0175 0.0188 0.0195 0.0231 0.0247 0.0200 0.0024 0.0195
ECN_63pet_1_Shr 0.0148 0.0222 0.0188 0.0134 0.0216 0.0113 0.0139 0.0176 0.0230 0.0187 0.0175 0.0039 0.0181

ECN_63pet_lhr 0.0235 0.0139 0.0160 0.0178 0.0225 0.0215 0.0156 0.0152 0.0223 0.0186 0.0187 0.0033 0.0182
ECN_63pet_20min 0.0193 0.0190 0.0169 0.0194 0.0169 0.0184 0.0208 0.0178 0.0215 0.0270 0.0197 0.0028 0.0191
ECN_63pcet_25min 0.0169 0.0178 0.0166 0.0161 0.0236 0.0177 0.0209 0.0214 0.0267 0.0226 0.0200 0.0034 0.0193

ECN_63pet_2hr 0.0141 0.0162 0.0135 0.0147 0.0188 0.0135 0.0230 0.0242 0.0137 0.0148 0.0167 0.0038 0.0148
ECN_63pcet_30min 0.0282 0.0159 0.0154 0.0197 0.0194 0.0192 0.0246 0.0219 0.0213 0.0220 0.0208 0.0036 0.0205

ECN_63pet_3hr 0.0157 0.0172 0.0219 0.0105 0.0117 0.0099 0.0113 0.0092 0.0115 0.0137 0.0133 0.0037 0.0116
ECN_63pcet_45min 0.0184 0.0165 0.0139 0.0182 0.0204 0.0155 0.0153 0.0182 0.0231 0.0233 0.0183 0.0030 0.0182

 

CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_30min.
The median pattern for this ensemble is storm 9 (storm name : ECN_63pct_30min_9).
The pattern with the greatest <Max Flow> for this ensemble is storm 1 (Storm name : ECN_63pct_30min_1).

 

 

Page 50

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

 

Summary information:

 

6 Total No. of Ensembles: 70

 

7 No. of Storms per ensemble: 10
8 No. of AEP Bands: 7

9 Object Name: ROOF 1

0 Result type: Max Flow
2

13. Results:

 

AEP: 1% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.0404 0.0351 0.0401 0.0332 0.0334 0.0329 0.0343 0.0377 0.0401 0.0418 0.0369 0.0033 0.0364
ECN_lpet_15min 0.0385 0.0363 0.0413 0.0389 0.0284 0.0290 0.0352 0.0401 0.0317 0.0359 0.0355 0.0043 0.0361
ECN_lpet_1_Shr 0.0200 0.0231 0.0196 0.0200 0.0230 0.0190 0.0186 0.0265 0.0185 0.0197 0.0208 0.0025 0.0198

ECN_lp¢et_lhr 0.0338 0.0265 0.0211 0.0244 0.0182 0.0230 0.0228 0.0235 0.0201 0.0229 0.0236 0.0040 0.0230

ECN_lpet_20min 0.0367 0.0380 0.0364 0.0350 0.0318 0.0297 0.0279 0.0270 0.0298 0.0272 0.0319 0.0040 0.0308

ECN_lpet_25min 0.0344 0.0378 0.0342 0.0250 0.0336 0.0249 0.0284 0.0261 0.0251 0.0281 0.0298 0.0045 0.0282

ECN_lpcet_2hr 0.0226 0.0183 0.0190 0.0211 0.0189 0.0191 0.0140 0.0146 0.0176 0.0275 0.0193 0.0037 0.0189
ECN_lpet_30min 0.0359 0.0327 0.0336 0.0234 0.0256 0.0399 0.0220 0.0242 0.0276 0.0239 0.0289 0.0059 0.0266
ECN_lpcet_3hr 0.0172 0.0171 0.0202 0.0154 0.0106 0.0168 0.0115 0.0205 0.0133 0.0218 0.0164 0.0036 0.0170
ECN_lpet_45min 0.0359 0.0342 0.0238 0.0297 0.0263 0.0211 0.0237 0.0305 0.0193 0.0232 0.0268 0.0053 0.0251
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_10min.
The median pattern for this ensemble is storm 8 (storm name : ECN_1pct_10min_8).
The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_lpct_10min_10).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev Median
ECN_10pet_10min 0.0258 0.0251 0.0274 0.0297 0.0233 0.0241 0.0258 0.0231 0.0250 0.0285 0.0258 0.0021 0.0255
ECN_10pet_15min 0.0291 0.0285 0.0287 0.0230 0.0212 0.0246 0.0231 0.0216 0.0271 0.0250 0.0252 0.0028 0.0248
ECN_10pet_1_Shr 0.0183 0.0134 0.0169 0.0212 0.0156 0.0146 0.0136 0.0183 0.0109 0.0165 0.0159 0.0028 0.0161

ECN_10pet_1hr 0.0223 0.0187 0.0203 0.0295 0.0145 0.0181 0.0147 0.0144 0.0142 0.0247 0.0191 0.0049 0.0184
ECN_10pet_20min 0.0215 0.0239 0.0177 0.0190 0.0201 0.0202 0.0185 0.0229 0.0250 0.0234 0.0212 0.0024 0.0209
ECN_10pet_25min 0.0176 0.0242 0.0263 0.0224 0.0266 0.0231 0.0224 0.0185 0.0238 0.0241 0.0229 0.0028 0.0235

ECN_10pet_2hr 0.0154 0.0104 0.0135 0.0197 0.0164 0.0199 0.0210 0.0120 0.0138 0.0189 0.0161 0.0035 0.0159
ECN_10pet_30min 0.0209 0.0225 0.0343 0.0184 0.0170 0.0177 0.0211 0.0187 0.0204 0.0181 0.0209 0.0048 0.0195

ECN_10pet_3hr 0.0156 0.0096 0.0138 0.0128 0.0111 0.0071 0.0108 0.0080 0.0094 0.0094 0.0108 0.0025 0.0102
ECN_10pet_45min 0.0268 0.0223 0.0218 0.0141 0.0153 0.0170 0.0161 0.0141 0.0196 0.0224 0.0189 0.0041 0.0183

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_10min.

The median pattern for this ensemble is storm 1 (storm name : ECN_10pct_10min_1).

The pattern with the greatest <Max Flow> for this ensemble is storm 4 (Storm name : ECN_10pct_10min_4).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

ECN_2pet_10min 0.0368 0.0320 0.0366 0.0302 0.0305 0.0299 0.0313 0.0344 0.0366 0.0381 0.0336 0.0030 0.0332

ECN_2pet_15min 0.0352 0.0331 0.0377 0.0355 0.0259 0.0265 0.0322 0.0366 0.0290 0.0328 0.0324 0.0039 0.0330

ECN_2pet_1_Shr 0.0178 0.0206 0.0175 0.0178 0.0205 0.0169 0.0166 0.0237 0.0164 0.0175 0.0185 0.0022 0.0177

ECN_2pcet_lhr 0.0304 0.0238 0.0190 0.0220 0.0164 0.0207 0.0205 0.0211 0.0181 0.0207 0.0213 0.0036 0.0207
ECN_2pet_20min 0.0336 0.0346 0.0332 0.0319 0.0291 0.0272 0.0255 0.0246 0.0271 0.0248 0.0292 0.0037 0.0281
ECN_2pet_25min 0.0313 0.0344 0.0311 0.0228 0.0306 0.0227 0.0258 0.0238 0.0228 0.0256 0.0271 0.0041 0.0257

ECN_2pcet_2hr 0.0202 0.0163 0.0170 0.0189 0.0168 0.0171 0.0125 0.0130 0.0157 0.0245 0.0172 0.0033 0.0169
ECN_2pet_30min 0.0326 0.0297 0.0305 0.0213 0.0232 0.0363 0.0199 0.0220 0.0251 0.0217 0.0262 0.0054 0.0241

ECN_2pet_3hr 0.0153 0.0152 0.0180 0.0137 0.0094 0.0150 0.0102 0.0183 0.0118 0.0194 0.0146 0.0032 0.0151
ECN_2pet_45min 0.0325 0.0309 0.0215 0.0268 0.0238 0.0190 0.0214 0.0276 0.0175 0.0210 0.0242 0.0048 0.0226

CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_10min.
The median pattern for this ensemble is storm 8 (storm name : ECN_2pct_10min_8).
The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_2pct_10min_10).
AEP: 20% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

Page 51

 

 

 

 

 

 

 

 

 

 

 

 

 

ECN_20pet_10min 0.0225 0.0236 0.0236 0.0237 0.0205 0.0196 0.0234 0.0209 0.0251 0.0222 0.0225 0.0016 0.0230
ECN_20pet_15min 0.0235 0.0265 0.0237 0.0219 0.0183 0.0173 0.0164 0.0177 0.0209 0.0239 0.0210 0.0033 0.0214
ECN_20pet_1_Shr 0.0120 0.0163 0.0163 0.0092 0.0167 0.0135 0.0103 0.0124 0.0170 0.0128 0.0137 0.0027 0.0132

ECN_20pet_lhr 0.0199 0.0114 0.0149 0.0158 0.0178 0.0158 0.0136 0.0119 0.0160 0.0127 0.0150 0.0025 0.0153
ECN_20pet_20min 0.0233 0.0230 0.0207 0.0167 0.0166 0.0210 0.0198 0.0168 0.0209 0.0237 0.0202 0.0026 0.0208
ECN_20pet_25min 0.0166 0.0168 0.0184 0.0177 0.0204 0.0187 0.0157 0.0145 0.0198 0.0202 0.0179 0.0019 0.0180

ECN_20pet_2hr 0.0107 0.0145 0.0122 0.0096 0.0151 0.0129 0.0172 0.0287 0.0113 0.0100 0.0142 0.0053 0.0125
ECN_20pcet_30min 0.0199 0.0161 0.0190 0.0190 0.0140 0.0182 0.0207 0.0201 0.0151 0.0176 0.0180 0.0021 0.0186

ECN_20pet_3hr 0.0101 0.0114 0.0140 0.0097 0.0075 0.0069 0.0082 0.0061 0.0077 0.0093 0.0091 0.0022 0.0087
ECN_20pet_45min 0.0221 0.0156 0.0143 0.0170 0.0212 0.0116 0.0128 0.0121 0.0175 0.0162 0.0160 0.0034 0.0159

CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_10min.

The median pattern for this ensemble is storm 7 (storm name : ECN_20pct_10min_7).

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_20pct_10min_9).

REP: 5% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_5pet_10min 0.0292 0.0285 0.0311 0.0336 0.0266 0.0273 0.0293 0.0262 0.0283 0.0323 0.0292 0.0023 0.0288
ECN_5pet_15min 0.0328 0.0322 0.0323 0.0260 0.0239 0.0278 0.0261 0.0245 0.0306 0.0283 0.0284 0.0032 0.0280
ECN_5pet_1_5hr 0.0211 0.0155 0.0195 0.0244 0.0180 0.0169 0.0157 0.0211 0.0126 0.0191 0.0184 0.0032 0.0185

ECN_5pcet_lhr 0.0256 0.0215 0.0233 0.0338 0.0167 0.0207 0.0169 0.0166 0.0163 0.0284 0.0220 0.0056 0.0211
ECN_5pet_20min 0.0245 0.0270 0.0201 0.0216 0.0228 0.0230 0.0209 0.0261 0.0284 0.0265 0.0241 0.0027 0.0238
ECN_5pet_25min 0.0200 0.0275 0.0299 0.0255 0.0302 0.0263 0.0254 0.0211 0.0270 0.0274 0.0260 0.0031 0.0266

ECN_5pcet_2hr 0.0179 0.0121 0.0157 0.0228 0.0190 0.0230 0.0243 0.0139 0.0160 0.0219 0.0186 0.0040 0.0184
ECN_5pet_30min 0.0238 0.0255 0.0390 0.0210 0.0194 0.0202 0.0240 0.0213 0.0232 0.0206 0.0238 0.0054 0.0222

ECN_5pcet_3hr 0.0182 0.0112 0.0160 0.0149 0.0130 0.0082 0.0126 0.0094 0.0110 0.0110 0.0126 0.0029 0.0119
ECN_5pet_45min 0.0306 0.0254 0.0249 0.0162 0.0175 0.0195 0.0185 0.0161 0.0225 0.0257 0.0217 0.0046 0.0210

CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_S5pct_l0min.

The median pattern for this ensemble is storm 1 (storm name : ECN_Spct_10min_1).

The pattern with the greatest <Max Flow> for this ensemble is storm 4 (storm name : ECN_Spct_10min_4).

AEP: 50% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_50pet_10min 0.0168 0.0177 0.0177 0.0178 0.0154 0.0147 0.0176 0.0156 0.0188 0.0166 0.0169 0.0012 0.0172
ECN_50pet_15min 0.0176 0.0198 0.0177 0.0164 0.0137 0.0128 0.0123 0.0132 0.0155 0.0178 0.0157 0.0024 0.0160
ECN_50pet_1_Shr 0.0088 0.0119 0.0119 0.0067 0.0122 0.0099 0.0075 0.0091 0.0125 0.0094 0.0100 0.0020 0.0096

ECN_50pet_1hr 0.0147 0.0084 0.0109 0.0117 0.0131 0.0116 0.0100 0.0088 0.0118 0.0094 0.0110 0.0019 0.0113
ECN_50pet_20min 0.0174 0.0172 0.0155 0.0125 0.0124 0.0157 0.0147 0.0126 0.0156 0.0177 0.0151 0.0019 0.0155
ECN_50pet_25min 0.0124 0.0126 0.0137 0.0132 0.0152 0.0140 0.0117 0.0108 0.0147 0.0150 0.0133 0.0014 0.0135

ECN_50pet_2hr 0.0077 0.0105 0.0088 0.0069 0.0110 0.0094 0.0124 0.0209 0.0082 0.0072 0.0103 0.0039 0.0091
ECN_50pet_30min 0.0148 0.0120 0.0142 0.0142 0.0103 0.0135 0.0154 0.0149 0.0112 0.0131 0.0134 0.0016 0.0138

ECN_50pet_3hr 0.0073 0.0082 0.0100 0.0069 0.0054 0.0049 0.0059 0.0044 0.0055 0.0067 0.0065 0.0016 0.0063
ECN_50pet_45min 0.0164 0.0115 0.0106 0.0126 0.0157 0.0086 0.0095 0.0089 0.0130 0.0120 0.0119 0.0025 0.0117

CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_10min.

The median pattern for this ensemble is storm 7 (storm name : ECN_5Qpct_10min_7).

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).

REP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0149 0.0157 0.0157 0.0158 0.0136 0.0130 0.0156 0.0139 0.0167 0.0148 0.0150 0.0011 0.0153
ECN_63pcet_15min 0.0156 0.0177 0.0158 0.0146 0.0122 0.0114 0.0109 0.0118 0.0138 0.0158 0.0140 0.0022 0.0142
ECN_63pet_1_Shr 0.0077 0.0105 0.0106 0.0059 0.0108 0.0088 0.0066 0.0080 0.0110 0.0083 0.0088 0.0017 0.0085

ECN_63pet_lhr 0.0130 0.0075 0.0097 0.0103 0.0116 0.0103 0.0089 0.0078 0.0105 0.0083 0.0098 0.0016 0.0100
ECN_63pet_20min 0.0155 0.0153 0.0137 0.0111 0.0110 0.0139 0.0130 0.0111 0.0138 0.0157 0.0134 0.0017 0.0138
ECN_63pcet_25min 0.0110 0.0112 0.0122 0.0117 0.0135 0.0124 0.0104 0.0096 0.0131 0.0134 0.0118 0.0012 0.0120

ECN_63pet_2hr 0.0068 0.0093 0.0078 0.0061 0.0097 0.0083 0.0109 0.0185 0.0073 0.0064 0.0091 0.0034 0.0080
ECN_63pcet_30min 0.0131 0.0106 0.0126 0.0126 0.0092 0.0120 0.0136 0.0132 0.0099 0.0116 0.0119 0.0014 0.0123

ECN_63pet_3hr 0.0064 0.0071 0.0088 0.0061 0.0047 0.0043 0.0052 0.0038 0.0048 0.0058 0.0057 0.0014 0.0055
ECN_63pcet_45min 0.0146 0.0102 0.0094 0.0111 0.0140 0.0076 0.0084 0.0079 0.0115 0.0107 0.0105 0.0023 0.0104

 

CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.
The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7).
The pattern with the greatest <Max Flow> for this ensemble is storm 9 (Storm name : ECN_63pct_10min_9).

 

 

Page 52

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

 

Summary information:

 

6 Total No. of Ensembles: 70

 

7 No. of Storms per ensemble: 10
8 No. of AEP Bands: 7

9 Object Name: ROOF 2

0 Result type: Max Flow
2

13. Results:

 

AEP: 1% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.0255 0.0221 0.0253 0.0212 0.0211 0.0210 0.0217 0.0238 0.0254 0.0263 0.0233 0.0020 0.0230
ECN_lpet_15min 0.0244 0.0229 0.0260 0.0245 0.0181 0.0183 0.0222 0.0255 0.0200 0.0227 0.0225 0.0027 0.0228
ECN_lpet_1_Shr 0.0127 0.0146 0.0125 0.0127 0.0145 0.0121 0.0118 0.0168 0.0117 0.0125 0.0132 0.0015 0.0126

ECN_lp¢et_lhr 0.0214 0.0168 0.0134 0.0156 0.0116 0.0146 0.0144 0.0149 0.0128 0.0145 0.0150 0.0025 0.0146

ECN_lpet_20min 0.0232 0.0241 0.0229 0.0221 0.0201 0.0188 0.0176 0.0170 0.0191 0.0173 0.0202 0.0025 0.0196

ECN_lpet_25min 0.0217 0.0240 0.0216 0.0159 0.0214 0.0157 0.0179 0.0166 0.0159 0.0178 0.0188 0.0029 0.0179

ECN_lpcet_2hr 0.0144 0.0116 0.0121 0.0134 0.0120 0.0121 0.0089 0.0093 0.0111 0.0174 0.0122 0.0023 0.0120
ECN_lpet_30min 0.0226 0.0208 0.0213 0.0148 0.0164 0.0253 0.0140 0.0154 0.0176 0.0152 0.0183 0.0037 0.0170
ECN_lpcet_3hr 0.0109 0.0108 0.0128 0.0098 0.0067 0.0107 0.0073 0.0130 0.0084 0.0138 0.0104 0.0023 0.0107
ECN_lpet_45min 0.0228 0.0217 0.0151 0.0188 0.0167 0.0134 0.0152 0.0193 0.0122 0.0148 0.0170 0.0033 0.0159
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_10min.
The median pattern for this ensemble is storm 8 (storm name : ECN_1pct_10min_8).
The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_lpct_10min_10).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev Median
ECN_10pet_10min 0.0163 0.0159 0.0173 0.0187 0.0149 0.0152 0.0163 0.0148 0.0158 0.0180 0.0163 0.0013 0.0161
ECN_10pet_15min 0.0183 0.0180 0.0181 0.0145 0.0134 0.0155 0.0146 0.0137 0.0172 0.0159 0.0159 0.0018 0.0157
ECN_10pet_1_Shr 0.0116 0.0085 0.0107 0.0134 0.0099 0.0093 0.0086 0.0116 0.0069 0.0105 0.0101 0.0018 0.0102

ECN_10pet_1hr 0.0141 0.0119 0.0128 0.0186 0.0092 0.0114 0.0094 0.0092 0.0090 0.0157 0.0121 0.0031 0.0117
ECN_10pet_20min 0.0138 0.0151 0.0113 0.0121 0.0128 0.0129 0.0117 0.0146 0.0158 0.0147 0.0135 0.0015 0.0133
ECN_10pet_25min 0.0111 0.0153 0.0166 0.0142 0.0168 0.0147 0.0142 0.0118 0.0150 0.0153 0.0145 0.0017 0.0148

ECN_10pet_2hr 0.0098 0.0066 0.0086 0.0125 0.0104 0.0126 0.0133 0.0076 0.0087 0.0119 0.0102 0.0022 0.0101
ECN_10pet_30min 0.0132 0.0142 0.0216 0.0117 0.0109 0.0113 0.0134 0.0119 0.0129 0.0115 0.0133 0.0030 0.0124

ECN_10pet_3hr 0.0099 0.0061 0.0087 0.0081 0.0070 0.0045 0.0069 0.0051 0.0060 0.0060 0.0068 0.0016 0.0065
ECN_10pet_45min 0.0169 0.0141 0.0138 0.0090 0.0097 0.0109 0.0102 0.0089 0.0125 0.0142 0.0120 0.0026 0.0117

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_10min.

The median pattern for this ensemble is storm 1 (storm name : ECN_10pct_10min_1).

The pattern with the greatest <Max Flow> for this ensemble is storm 4 (Storm name : ECN_10pct_10min_4).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

ECN_2pet_10min 0.0232 0.0202 0.0231 0.0193 0.0192 0.0191 0.0198 0.0217 0.0231 0.0240 0.0213 0.0019 0.0209

ECN_2pet_15min 0.0222 0.0209 0.0238 0.0224 0.0165 0.0167 0.0203 0.0232 0.0183 0.0207 0.0205 0.0025 0.0208

ECN_2pet_1_Shr 0.0113 0.0130 0.0111 0.0113 0.0130 0.0108 0.0105 0.0150 0.0105 0.0111 0.0118 0.0014 0.0112

ECN_2pcet_lhr 0.0193 0.0151 0.0121 0.0140 0.0104 0.0132 0.0130 0.0134 0.0115 0.0131 0.0135 0.0023 0.0131
ECN_2pet_20min 0.0212 0.0220 0.0209 0.0201 0.0183 0.0171 0.0161 0.0155 0.0174 0.0158 0.0184 0.0023 0.0178
ECN_2pet_25min 0.0198 0.0218 0.0197 0.0145 0.0194 0.0143 0.0163 0.0151 0.0144 0.0162 0.0172 0.0026 0.0163

ECN_2pcet_2hr 0.0128 0.0104 0.0108 0.0120 0.0107 0.0108 0.0079 0.0083 0.0099 0.0155 0.0109 0.0021 0.0107
ECN_2pet_30min 0.0206 0.0189 0.0194 0.0135 0.0148 0.0230 0.0127 0.0140 0.0160 0.0138 0.0167 0.0034 0.0154

ECN_2pet_3hr 0.0097 0.0096 0.0114 0.0087 0.0059 0.0095 0.0065 0.0116 0.0075 0.0123 0.0093 0.0020 0.0095
ECN_2pet_45min 0.0206 0.0196 0.0136 0.0170 0.0151 0.0121 0.0137 0.0175 0.0111 0.0133 0.0153 0.0030 0.0144

CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_10min.
The median pattern for this ensemble is storm 8 (storm name : ECN_2pct_10min_8).
The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_2pct_10min_10).
AEP: 20% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

Page 53

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ECN_20pet_10min 0.0142 0.0149 0.0149 0.0150 0.0129 0.0125 0.0148 0.0133 0.0158 0.0140 0.0142 0.0010 0.0145
ECN_20pet_15min 0.0148 0.0167 0.0149 0.0138 0.0116 0.0111 0.0105 0.0112 0.0133 0.0152 0.0133 0.0020 0.0135
ECN_20pet_1_Shr 0.0076 0.0104 0.0103 0.0058 0.0106 0.0085 0.0065 0.0079 0.0108 0.0081 0.0087 0.0017 0.0083

ECN_20pet_lhr 0.0126 0.0073 0.0095 0.0100 0.0113 0.0100 0.0086 0.0075 0.0101 0.0081 0.0095 0.0016 0.0098
ECN_20pet_20min 0.0147 0.0145 0.0130 0.0106 0.0105 0.0132 0.0126 0.0106 0.0133 0.0150 0.0128 0.0016 0.0131
ECN_20pet_25min 0.0105 0.0107 0.0116 0.0113 0.0129 0.0118 0.0100 0.0092 0.0125 0.0128 0.0113 0.0012 0.0115

ECN_20pet_2hr 0.0068 0.0092 0.0078 0.0061 0.0095 0.0082 0.0109 0.0181 0.0072 0.0063 0.0090 0.0034 0.0080
ECN_20pcet_30min 0.0126 0.0103 0.0120 0.0120 0.0089 0.0116 0.0131 0.0127 0.0096 0.0112 0.0114 0.0013 0.0118

ECN_20pet_3hr 0.0064 0.0073 0.0089 0.0061 0.0048 0.0044 0.0052 0.0039 0.0049 0.0059 0.0058 0.0014 0.0055
ECN_20pet_45min 0.0140 0.0099 0.0090 0.0108 0.0133 0.0074 0.0082 0.0077 0.0111 0.0103 0.0102 0.0021 0.0101

CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_10min.
The median pattern for this ensemble is storm 7 (storm name : ECN_20pct_10min_7).
The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_20pct_10min_9).
REP: 5% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
*
| ECN_5pet_10min 0.0184 0.0180 0.0196 0.0212 0.0170 0.0172 0.0185 0.0168 0.0179 0.0204 0.0185 0.0014 0.0182
| ECN_5pet_15min 0.0207 0.0203 0.0204 0.0164 0.0151 0.0175 0.0165 0.0156 0.0195 0.0180 0.0180 0.0020 0.0177
| ECN_5pet_1_5hr 0.0133 0.0098 0.0124 0.0154 0.0114 0.0107 0.0100 0.0133 0.0080 0.0121 0.0117 0.0020 0.0118
| ECN_5pcet_lhr 0.0162 0.0136 0.0147 0.0213 0.0106 0.0131 0.0108 0.0105 0.0104 0.0180 0.0139 0.0035 0.0134
| ECN_5pet_20min 0.0157 0.0171 0.0128 0.0137 0.0145 0.0146 0.0132 0.0165 0.0180 0.0167 0.0153 0.0017 0.0152
| ECN_5pet_25min 0.0126 0.0174 0.0188 0.0161 0.0191 0.0167 0.0161 0.0134 0.0170 0.0173 0.0164 0.0020 0.0168
| ECN_5pcet_2hr 0.0114 0.0077 0.0100 0.0145 0.0120 0.0146 0.0153 0.0088 0.0101 0.0138 0.0118 0.0025 0.0117
| ECN_5pet_30min 0.0150 0.0162 0.0246 0.0134 0.0124 0.0129 0.0152 0.0135 0.0147 0.0131 0.0151 0.0034 0.0141
| ECN_5pcet_3hr 0.0116 0.0071 0.0101 0.0095 0.0082 0.0052 0.0080 0.0060 0.0070 0.0070 0.0080 0.0018 0.0076
| ECN_5pet_45min 0.0193 0.0161 0.0158 0.0103 0.0111 0.0125 0.0117 0.0102 0.0143 0.0163 0.0137 0.0029 0.0134
*
| CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_Spct_1l0min.
| The median pattern for this ensemble is storm 1 (storm name : ECN_5pct_10min_1).
| The pattern with the greatest <Max Flow> for this ensemble is storm 4 (storm name : ECN_5pct_l0min_4).
lig *
119
120
121 AEP: 50% - Max Flow (m*3/s)
122 *
123 | Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
*
| ECN_50pet_10min 0.0106 0.0112 0.0111 0.0112 0.0097 0.0093 0.0111 0.0099 0.0118 0.0105 0.0106 0.0008 0.0109
| ECN_50pet_15min 0.0111 0.0125 0.0112 0.0103 0.0086 0.0082 0.0078 0.0084 0.0099 0.0113 0.0099 0.0015 0.0101
| ECN_50pet_1_Shr 0.0056 0.0076 0.0075 0.0043 0.0078 0.0063 0.0048 0.0058 0.0079 0.0059 0.0063 0.0012 0.0061
| ECN_50pet_1hr 0.0093 0.0054 0.0070 0.0074 0.0083 0.0074 0.0063 0.0056 0.0075 0.0059 0.0070 0.0012 0.0072
| ECN_50pet_20min 0.0110 0.0108 0.0098 0.0079 0.0079 0.0099 0.0094 0.0079 0.0099 0.0112 0.0096 0.0012 0.0098
| ECN_50pet_25min 0.0078 0.0079 0.0087 0.0083 0.0096 0.0088 0.0074 0.0069 0.0093 0.0095 0.0084 0.0009 0.0085
| ECN_50pet_2hr 0.0049 0.0067 0.0056 0.0044 0.0069 0.0059 0.0079 0.0132 0.0052 0.0046 0.0065 0.0025 0.0058
| ECN_50pet_30min 0.0094 0.0076 0.0089 0.0090 0.0066 0.0086 0.0097 0.0095 0.0071 0.0083 0.0085 0.0010 0.0088
| ECN_50pet_3hr 0.0046 0.0052 0.0064 0.0044 0.0034 0.0031 0.0037 0.0028 0.0035 0.0042 0.0041 0.0010 0.0040
| ECN_50pet_45min 0.0104 0.0073 0.0067 0.0080 0.0099 0.0054 0.0060 0.0057 0.0082 0.0076 0.0075 0.0016 0.0075
*
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_l0min.
| The median pattern for this ensemble is storm 7 (storm name : ECN_SOpct_10min_7).
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).
*
REP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev Median
ECN_63pct_10min 0.0094 0.0099 0.0099 0.0100 0.0086 0.0082 0.0098 0.0088 0.0105 0.0093 0.0094 0.0007 0.0096
ECN_63pcet_15min 0.0099 0.0111 0.0100 0.0092 0.0077 0.0073 0.0069 0.0074 0.0088 0.0100 0.0088 0.0014 0.0090
ECN_63pet_1_Shr 0.0049 0.0067 0.0067 0.0038 0.0069 0.0055 0.0042 0.0051 0.0070 0.0052 0.0056 0.0011 0.0054

ECN_63pet_lhr 0.0082 0.0047 0.0061 0.0065 0.0074 0.0065 0.0056 0.0049 0.0066 0.0053 0.0062 0.0010 0.0063
ECN_63pet_20min 0.0098 0.0096 0.0087 0.0070 0.0070 0.0088 0.0083 0.0070 0.0088 0.0100 0.0085 0.0011 0.0087
ECN_63pcet_25min 0.0070 0.0071 0.0077 0.0074 0.0086 0.0078 0.0066 0.0061 0.0083 0.0085 0.0075 0.0008 0.0076

ECN_63pet_2hr 0.0043 0.0059 0.0049 0.0039 0.0061 0.0052 0.0070 0.0116 0.0046 0.0040 0.0058 0.0022 0.0051
ECN_63pcet_30min 0.0083 0.0067 0.0080 0.0080 0.0058 0.0076 0.0086 0.0084 0.0063 0.0074 0.0075 0.0009 0.0078

ECN_63pet_3hr 0.0040 0.0045 0.0056 0.0039 0.0030 0.0028 0.0033 0.0024 0.0031 0.0037 0.0036 0.0009 0.0035
ECN_63pcet_45min 0.0092 0.0065 0.0060 0.0071 0.0088 0.0048 0.0054 0.0050 0.0073 0.0068 0.0067 0.0014 0.0066

CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.
The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7).
The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_63pct_10min_9).

 

 

Page 54

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

 

Summary information:

 

6 Total No. of Ensembles: 70

 

7 No. of Storms per ensemble: 10
8 No. of AEP Bands: 7

9 Object Name: ROOF 3

0 Result type: Max Flow
2

13. Results:

 

AEP: 1% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.0348 0.0302 0.0346 0.0287 0.0288 0.0284 0.0296 0.0325 0.0346 0.0360 0.0318 0.0028 0.0313
ECN_lpet_15min 0.0332 0.0312 0.0355 0.0335 0.0245 0.0249 0.0303 0.0346 0.0273 0.0309 0.0306 0.0037 0.0311
ECN_lpet_1_Shr 0.0172 0.0199 0.0169 0.0172 0.0198 0.0164 0.0160 0.0229 0.0159 0.0170 0.0179 0.0021 0.0171

ECN_lp¢et_lhr 0.0291 0.0228 0.0182 0.0211 0.0157 0.0198 0.0196 0.0203 0.0174 0.0198 0.0204 0.0035 0.0198

ECN_lpet_20min 0.0316 0.0328 0.0313 0.0301 0.0274 0.0256 0.0240 0.0232 0.0258 0.0235 0.0275 0.0034 0.0266

ECN_lpet_25min 0.0296 0.0326 0.0295 0.0216 0.0290 0.0215 0.0244 0.0226 0.0216 0.0242 0.0257 0.0039 0.0243

ECN_lpcet_2hr 0.0195 0.0158 0.0164 0.0182 0.0163 0.0165 0.0121 0.0126 0.0152 0.0237 0.0166 0.0032 0.0163
ECN_lpet_30min 0.0309 0.0283 0.0290 0.0202 0.0221 0.0344 0.0190 0.0209 0.0239 0.0206 0.0249 0.0050 0.0230
ECN_lpcet_3hr 0.0148 0.0147 0.0174 0.0133 0.0091 0.0145 0.0099 0.0177 0.0115 0.0188 0.0142 0.0031 0.0146
ECN_lpet_45min 0.0310 0.0295 0.0205 0.0256 0.0227 0.0182 0.0205 0.0263 0.0167 0.0200 0.0231 0.0046 0.0216
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_10min.
The median pattern for this ensemble is storm 8 (storm name : ECN_1pct_10min_8).
The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_lpct_10min_10).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev Median
ECN_10pet_10min 0.0222 0.0217 0.0236 0.0256 0.0202 0.0208 0.0223 0.0200 0.0215 0.0245 0.0222 0.0018 0.0219
ECN_10pet_15min 0.0250 0.0246 0.0247 0.0198 0.0182 0.0212 0.0199 0.0187 0.0234 0.0216 0.0217 0.0024 0.0214
ECN_10pet_1_Shr 0.0157 0.0116 0.0146 0.0182 0.0135 0.0126 0.0118 0.0158 0.0094 0.0143 0.0138 0.0024 0.0139

ECN_10pet_1hr 0.0192 0.0162 0.0175 0.0254 0.0125 0.0156 0.0127 0.0124 0.0123 0.0213 0.0165 0.0042 0.0159
ECN_10pet_20min 0.0186 0.0205 0.0152 0.0164 0.0173 0.0175 0.0159 0.0198 0.0215 0.0201 0.0183 0.0020 0.0180
ECN_10pet_25min 0.0152 0.0208 0.0227 0.0193 0.0229 0.0200 0.0193 0.0160 0.0205 0.0208 0.0197 0.0024 0.0202

ECN_10pet_2hr 0.0133 0.0090 0.0117 0.0170 0.0141 0.0171 0.0181 0.0103 0.0119 0.0163 0.0139 0.0030 0.0137
ECN_10pet_30min 0.0180 0.0194 0.0295 0.0159 0.0147 0.0153 0.0182 0.0161 0.0176 0.0156 0.0180 0.0041 0.0169

ECN_10pet_3hr 0.0135 0.0083 0.0119 0.0110 0.0096 0.0061 0.0093 0.0069 0.0081 0.0081 0.0093 0.0022 0.0088
ECN_10pet_45min 0.0231 0.0192 0.0188 0.0122 0.0132 0.0147 0.0139 0.0122 0.0169 0.0193 0.0163 0.0035 0.0158

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_10min.

The median pattern for this ensemble is storm 1 (storm name : ECN_10pct_10min_1).

The pattern with the greatest <Max Flow> for this ensemble is storm 4 (Storm name : ECN_10pct_10min_4).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

ECN_2pet_10min 0.0317 0.0276 0.0315 0.0261 0.0262 0.0259 0.0270 0.0296 0.0315 0.0328 0.0290 0.0026 0.0286

ECN_2pet_15min 0.0303 0.0285 0.0325 0.0306 0.0224 0.0228 0.0277 0.0316 0.0250 0.0282 0.0280 0.0034 0.0284

ECN_2pet_1_Shr 0.0154 0.0177 0.0151 0.0154 0.0177 0.0146 0.0143 0.0204 0.0142 0.0151 0.0160 0.0019 0.0152

ECN_2pcet_lhr 0.0263 0.0206 0.0164 0.0190 0.0142 0.0179 0.0177 0.0182 0.0157 0.0178 0.0184 0.0031 0.0178
ECN_2pet_20min 0.0289 0.0299 0.0286 0.0275 0.0250 0.0234 0.0219 0.0212 0.0235 0.0214 0.0251 0.0032 0.0242
ECN_2pet_25min 0.0270 0.0297 0.0268 0.0197 0.0264 0.0196 0.0223 0.0205 0.0197 0.0221 0.0234 0.0036 0.0222

ECN_2pcet_2hr 0.0174 0.0141 0.0146 0.0163 0.0145 0.0147 0.0108 0.0112 0.0136 0.0212 0.0148 0.0028 0.0146
ECN_2pet_30min 0.0281 0.0257 0.0263 0.0184 0.0201 0.0313 0.0172 0.0190 0.0217 0.0187 0.0226 0.0046 0.0209

ECN_2pet_3hr 0.0132 0.0131 0.0155 0.0118 0.0081 0.0129 0.0088 0.0157 0.0102 0.0167 0.0126 0.0028 0.0130
ECN_2pet_45min 0.0280 0.0267 0.0186 0.0231 0.0205 0.0164 0.0185 0.0238 0.0150 0.0181 0.0209 0.0041 0.0195

CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_10min.
The median pattern for this ensemble is storm 8 (storm name : ECN_2pct_10min_8).
The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_2pct_10min_10).
AEP: 20% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

Page 55

 

 

 

 

 

 

 

 

 

 

 

 

 

ECN_20pet_10min 0.0194 0.0203 0.0203 0.0205 0.0177 0.0169 0.0202 0.0180 0.0216 0.0191 0.0194 0.0014 0.0198
ECN_20pet_15min 0.0202 0.0228 0.0204 0.0188 0.0158 0.0150 0.0141 0.0152 0.0180 0.0206 0.0181 0.0028 0.0184
ECN_20pet_1_Shr 0.0103 0.0141 0.0140 0.0079 0.0144 0.0116 0.0089 0.0107 0.0147 0.0111 0.0118 0.0023 0.0113

ECN_20pet_lhr 0.0172 0.0099 0.0129 0.0136 0.0154 0.0136 0.0117 0.0103 0.0138 0.0110 0.0129 0.0022 0.0132
ECN_20pet_20min 0.0201 0.0198 0.0178 0.0144 0.0143 0.0181 0.0171 0.0145 0.0180 0.0205 0.0175 0.0022 0.0179
ECN_20pet_25min 0.0143 0.0145 0.0158 0.0152 0.0176 0.0161 0.0136 0.0125 0.0170 0.0174 0.0154 0.0016 0.0155

ECN_20pet_2hr 0.0092 0.0125 0.0105 0.0083 0.0130 0.0111 0.0148 0.0247 0.0098 0.0086 0.0123 0.0046 0.0108
ECN_20pcet_30min 0.0171 0.0139 0.0164 0.0164 0.0121 0.0157 0.0178 0.0173 0.0130 0.0152 0.0155 0.0018 0.0160

ECN_20pet_3hr 0.0088 0.0099 0.0121 0.0083 0.0065 0.0060 0.0071 0.0053 0.0066 0.0080 0.0078 0.0019 0.0075
ECN_20pet_45min 0.0191 0.0135 0.0123 0.0147 0.0182 0.0100 0.0111 0.0104 0.0151 0.0140 0.0138 0.0029 0.0137

CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_10min.

The median pattern for this ensemble is storm 7 (storm name : ECN_20pct_10min_7).

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_20pct_10min_9).

REP: 5% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_5pet_10min 0.0251 0.0245 0.0268 0.0290 0.0230 0.0235 0.0252 0.0227 0.0244 0.0278 0.0252 0.0020 0.0248
ECN_5pet_15min 0.0282 0.0277 0.0279 0.0224 0.0206 0.0239 0.0225 0.0211 0.0264 0.0244 0.0245 0.0027 0.0242
ECN_5pet_1_5hr 0.0181 0.0134 0.0169 0.0210 0.0155 0.0146 0.0136 0.0182 0.0109 0.0164 0.0159 0.0028 0.0160

ECN_5pcet_lhr 0.0220 0.0186 0.0201 0.0291 0.0144 0.0179 0.0146 0.0143 0.0141 0.0245 0.0190 0.0048 0.0182
ECN_5pet_20min 0.0212 0.0233 0.0174 0.0186 0.0197 0.0198 0.0180 0.0225 0.0245 0.0228 0.0208 0.0023 0.0205
ECN_5pet_25min 0.0172 0.0237 0.0257 0.0219 0.0260 0.0227 0.0219 0.0182 0.0232 0.0236 0.0224 0.0027 0.0230

ECN_5pcet_2hr 0.0154 0.0104 0.0135 0.0197 0.0164 0.0198 0.0209 0.0119 0.0138 0.0188 0.0161 0.0035 0.0159
ECN_5pet_30min 0.0205 0.0220 0.0336 0.0181 0.0168 0.0175 0.0207 0.0184 0.0200 0.0178 0.0205 0.0046 0.0192

ECN_5pcet_3hr 0.0157 0.0097 0.0138 0.0129 0.0112 0.0071 0.0109 0.0081 0.0095 0.0095 0.0108 0.0025 0.0103
ECN_5pet_45min 0.0263 0.0219 0.0215 0.0139 0.0151 0.0169 0.0159 0.0139 0.0194 0.0221 0.0187 0.0040 0.0181

CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_S5pct_l0min.

The median pattern for this ensemble is storm 1 (storm name : ECN_Spct_10min_1).

The pattern with the greatest <Max Flow> for this ensemble is storm 4 (storm name : ECN_Spct_10min_4).

AEP: 50% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_50pet_10min 0.0145 0.0152 0.0152 0.0153 0.0132 0.0126 0.0151 0.0135 0.0162 0.0143 0.0145 0.0010 0.0148
ECN_50pet_15min 0.0151 0.0171 0.0153 0.0141 0.0118 0.0111 0.0106 0.0114 0.0134 0.0154 0.0135 0.0021 0.0138
ECN_50pet_1_Shr 0.0076 0.0103 0.0103 0.0058 0.0106 0.0085 0.0065 0.0078 0.0107 0.0081 0.0086 0.0017 0.0083

ECN_50pet_1hr 0.0127 0.0073 0.0094 0.0101 0.0113 0.0100 0.0086 0.0076 0.0102 0.0081 0.0095 0.0016 0.0097
ECN_50pet_20min 0.0150 0.0148 0.0133 0.0108 0.0107 0.0135 0.0127 0.0108 0.0134 0.0153 0.0130 0.0017 0.0134
ECN_50pet_25min 0.0107 0.0108 0.0118 0.0114 0.0131 0.0120 0.0101 0.0093 0.0127 0.0130 0.0115 0.0012 0.0116

ECN_50pet_2hr 0.0067 0.0091 0.0076 0.0060 0.0095 0.0081 0.0107 0.0180 0.0071 0.0062 0.0089 0.0034 0.0079
ECN_50pet_30min 0.0127 0.0103 0.0122 0.0122 0.0089 0.0117 0.0132 0.0129 0.0097 0.0113 0.0115 0.0014 0.0119

ECN_50pet_3hr 0.0063 0.0070 0.0087 0.0060 0.0047 0.0043 0.0051 0.0038 0.0047 0.0057 0.0056 0.0014 0.0054
ECN_50pet_45min 0.0142 0.0099 0.0091 0.0108 0.0135 0.0074 0.0082 0.0077 0.0112 0.0104 0.0102 0.0022 0.0101

CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_10min.

The median pattern for this ensemble is storm 7 (storm name : ECN_5Qpct_10min_7).

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).

REP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0129 0.0135 0.0135 0.0136 0.0117 0.0112 0.0134 0.0120 0.0143 0.0127 0.0129 0.0009 0.0131
ECN_63pcet_15min 0.0135 0.0152 0.0136 0.0126 0.0105 0.0098 0.0094 0.0102 0.0119 0.0136 0.0120 0.0019 0.0122
ECN_63pet_1_Shr 0.0067 0.0091 0.0091 0.0051 0.0093 0.0076 0.0057 0.0069 0.0095 0.0071 0.0076 0.0015 0.0073

ECN_63pet_lhr 0.0112 0.0064 0.0083 0.0089 0.0100 0.0089 0.0076 0.0067 0.0090 0.0071 0.0084 0.0014 0.0086
ECN_63pet_20min 0.0133 0.0131 0.0118 0.0095 0.0095 0.0120 0.0113 0.0096 0.0119 0.0135 0.0116 0.0015 0.0119
ECN_63pcet_25min 0.0095 0.0096 0.0105 0.0101 0.0117 0.0107 0.0090 0.0083 0.0113 0.0115 0.0102 0.0011 0.0103

ECN_63pet_2hr 0.0059 0.0080 0.0067 0.0053 0.0083 0.0071 0.0094 0.0159 0.0063 0.0055 0.0078 0.0030 0.0069
ECN_63pcet_30min 0.0113 0.0092 0.0109 0.0109 0.0079 0.0103 0.0118 0.0114 0.0086 0.0100 0.0102 0.0012 0.0106

ECN_63pet_3hr 0.0055 0.0062 0.0076 0.0052 0.0041 0.0037 0.0044 0.0033 0.0042 0.0050 0.0049 0.0012 0.0047
ECN_63pcet_45min 0.0126 0.0088 0.0081 0.0096 0.0120 0.0066 0.0073 0.0068 0.0099 0.0092 0.0091 0.0019 0.0090

 

CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.
The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7).
The pattern with the greatest <Max Flow> for this ensemble is storm 9 (Storm name : ECN_63pct_10min_9).

 

 

Page 56

                                                           23098 - SBSMP/2
                                                                 Page 29




                                             Appendix J


              XPSTORM POST DEVELOPMENT MITIGATED RESULTS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 57

 

Summary information:

 

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

6 Total No. of Ensembles: 70

7 No. of Storms per ensemble: 10
No. of AEP Bands: 7

Object Name:
Result type:

 

 

13 Results:

Linkl_High Flow 1
Max Flow

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AEP: 1% - Max Flow (m*3/s)
Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.0163 0.0179 0.0144 0.0194 0.0192 0.0192 0.0182 0.0161 0.0215 0.0147 0.0177 0.0022 0.0181
ECN_lpet_15min 0.0202 0.0176 0.0121 0.0107 0.0179 0.0162 0.0155 0.0240 0.0191 0.0119 0.0165 0.0039 0.0169
ECN_lpet_1_Shr 0.0013 0.0114 0.0091 0.0025 0.0104 0.0086 0.0075 0.0127 0.0077 0.0092 0.0080 0.0034 0.0088
ECN_lp¢et_lhr 0.0204 0.0151 0.0078 0.0102 0.0042 0.0125 0.0060 0.0075 0.0097 0.0093 0.0103 0.0045 0.0095
ECN_lpet_20min 0.0167 0.0232 0.0135 0.0124 0.0122 0.0135 0.0105 0.0135 0.0143 0.0155 0.0145 0.0033 0.0135
ECN_lpet_25min 0.0155 0.0229 0.0144 0.0142 0.0166 0.0122 0.0117 0.0153 0.0129 0.0174 0.0153 0.0031 0.0148
ECN_lpcet_2hr 0.0056 0.0005 0.0045 0.0090 0.0079 0.0040 0.0050 0.0095 0.0058 0.0028 0.0053
ECN_lpet_30min 0.0167 0.0150 0.0217 0.0103 0.0113 0.0214 0.0115 0.0132 0.0161 0.0127 0.0150 0.0038 0.0141
ECN_lpcet_3hr 0.0054 0.0014 0.0070 0.0006 0.0081 0.0099 0.0054 0.0034 0.0062
ECN_lpet_45min 0.0225 0.0202 0.0091 0.0141 0.0125 0.0078 0.0096 0.0174 0.0051 0.0127 0.0131 0.0053 0.0126
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_10min.
The median pattern for this ensemble is storm 7 (storm name : ECN_1pct_10min_7).
The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_1pct_10min_9).
AEP: 10% - Max Flow (m*3/s)
Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_10pet_10min 0.0000 0.0000 0.0000
ECN_10pet_15min 0.0002 0.0001 0.0002 0.0000 0.0002
ECN_10pet_1_Shr 0.0000 0.0000 0.0000
ECN_10pet_1hr 0.0003 0.0037 0.0020 0.0017 0.0020
ECN_10pet_20min 0.0006 0.0001 0.0074 0.0084 0.0041 0.0038 0.0040
ECN_10pet_25min 0.0081 0.0071 0.0057 0.0070 0.0010 0.0064
ECN_10pet_2hr 0.0025 0.0025 0.0000 0.0025
ECN_10pet_30min 0.0002 0.0008 0.0037 0.0016 0.0015 0.0005
ECN_10pet_3hr 0.0036 0.0036 0.0000 0.0036
ECN_10pet_45min 0.0028 0.0028 0.0000 0.0028
CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_25min.
The median pattern for this ensemble is storm 2 (storm name : ECN_10pct_25min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 1 (Storm name : ECN_10pct_25min_2).
AEP: 2% - Max Flow (m*3/s)
Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_2pet_10min 0.0119 0.0126 0.0099 0.0137 0.0132 0.0136 0.0129 0.0126 0.0163 0.0090 0.0126 0.0019 0.0128
ECN_2pet_15min 0.0144 0.0111 0.0078 0.0082 0.0153 0.0145 0.0096 0.0211 0.0163 0.0089 0.0127 0.0041 0.0128
ECN_2pet_1_Shr 0.0059 0.0052 0.0051 0.0047 0.0062 0.0057 0.0088 0.0060 0.0013 0.0054
ECN_2pcet_lhr 0.0178 0.0124 0.0060 0.0081 0.0023 0.0101 0.0019 0.0075 0.0018 0.0075 0.0051 0.0067
ECN_2pet_20min 0.0156 0.0203 0.0088 0.0058 0.0099 0.0107 0.0085 0.0104 0.0088 0.0128 0.0112 0.0039 0.0101
ECN_2pet_25min 0.0069 0.0202 0.0091 0.0119 0.0114 0.0092 0.0097 0.0129 0.0093 0.0149 0.0116 0.0036 0.0106
ECN_2pcet_2hr 0.0068 0.0025 0.0047 0.0021 0.0047
ECN_2pet_30min 0.0141 0.0115 0.0192 0.0084 0.0091 0.0164 0.0095 0.0110 0.0137 0.0105 0.0123 0.0033 0.0113
ECN_2pet_3hr 0.0076 0.0076 0.0000 0.0076
ECN_2pet_45min 0.0199 0.0177 0.0047 0.0111 0.0085 0.0060 0.0077 0.0143 0.0036 0.0101 0.0103 0.0052 0.0093
CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_10min.
The median pattern for this ensemble is storm 7 (storm name : ECN_2pct_10min_7).
The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_2pct_10min_9).
AEP: 20% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

Page 58

 

ECN_20pet_10min 0.0000 0.0000 0.0000
ECN_20pet_15min 0.0000 0.0000 0.0000
ECN_20pet_1_5Shr 0.0000 0.0000 0.0000

ECN_20pct_lhr 0.0000 0.0000 0.0000
ECN_20pet_20min 0.0000 0.0000 0.0000
ECN_20pet_25min 0.0000 0.0000 0.0000

ECN_20pct_2hr 0.0000 0.0000 0.0000
ECN_20pet_30min 0.0000 0.0000 0.0000

ECN_20pet_3hr 0.0000 0.0000 0.0000
ECN_20pet_45min 0.0000 0.0000 0.0000

 

CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble
The median pattern for this ensemble is storm 0 (storm name : ).
The pattern with the greatest <Max Flow> for this ensemble is storm 0 (storm name : ).

 

AEP: 5% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble
The median pattern for this ensemble is storm 0 (storm name : ).
The pattern with the greatest <Max Flow> for this ensemble is storm 0 (storm name : ).

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_5pet_10min 0.0008 0.0000 0.0004 0.0001 0.0038 0.0011 0.0014 0.0003
ECN_5pet_15min 0.0023 0.0018 0.0036 0.0086 0.0087 0.0070 0.0039 0.0068 0.0123 0.0129 0.0068 0.0037 0.0069
ECN_5pet_1_5hr 0.0019 0.0005 0.0001 0.0011 0.0008 0.0009 0.0006 0.0006
ECN_5pcet_lhr 0.0130 0.0013 0.0026 0.0143 0.0078 0.0059 0.0078
ECN_5pet_20min 0.0039 0.0047 0.0069 0.0108 0.0090 0.0064 0.0075 0.0150 0.0164 0.0059 0.0086 0.0040 0.0072
ECN_5pet_25min 0.0056 0.0159 0.0010 0.0027 0.0005 0.0149 0.0059 0.0050 0.0049 0.0101 0.0067 0.0051 0.0053
ECN_5pcet_2hr 0.0115 0.0115 0.0000 0.0115
ECN_5pet_30min 0.0010 0.0111 0.0147 0.0066 0.0034 0.0067 0.0122 0.0035 0.0070 0.0101 0.0076 0.0041 0.0069
ECN_5pcet_3hr 0.0059 0.0059 0.0000 0.0059
ECN_5pet_45min 0.0046 0.0042 0.0080 0.0055 0.0016 0.0054 0.0118 0.0129 0.0067 0.0036 0.0055
CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_2hr.
The median pattern for this ensemble is storm 1 (storm name : ECN_Spct_2hr_4).
The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_Spct_2hr 4).
AEP: 50% - Max Flow (m*3/s)
Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_50pet_10min 0.0000 0.0000 0.0000
ECN_50pet_15min 0.0000 0.0000 0.0000
ECN_50pet_1_Shr 0.0000 0.0000 0.0000
ECN_5O0pet_lhr 0.0000 0.0000 0.0000
ECN_50pet_20min 0.0000 0.0000 0.0000
ECN_50pet_25min 0.0000 0.0000 0.0000
1 ECN_50pet_2hr 0.0000 0.0000 0.0000
1 ECN_S5Opet_30min 0.0000 0.0000 0.0000
13 ECN_50pet_3hr 0.0000 0.0000 0.0000
1 ECN_50pet_45min 0.0000 0.0000 0.0000
1
1 CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble
1 The median pattern for this ensemble is storm 0 (storm name : ).
1 The pattern with the greatest <Max Flow> for this ensemble is storm 0 (storm name : ).
1
1
1
1 AEP: 63.2% - Max Flow (m*3/s)
1
1 Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
1
1 ECN_63pct_10min 0.0000 0.0000 0.0000
1 ECN_63pcet_15min 0.0000 0.0000 0.0000
1 ECN_63pet_1_Shr 0.0000 0.0000 0.0000
1 ECN_63pet_lhr 0.0000 0.0000 0.0000
1 ECN_63pet_20min 0.0000 0.0000 0.0000
1 ECN_63pcet_25min 0.0000 0.0000 0.0000
1 ECN_63pet_2hr 0.0000 0.0000 0.0000
1 ECN_63pet_30min 0.0000 0.0000 0.0000
1 ECN_63pet_3hr 0.0000 0.0000 0.0000
1 ECN_63pcet_45min 0.0000 0.0000 0.0000
1
1
1
1
1
1

Page 59

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

 

Summary information:

 

6 Total No. of Ensembles: 70

 

7 No. of Storms per ensemble: 10

8 No. of AEP Bands: 7

9 Object Name: Linkl_Low Flow 1
0 Result type: Max Flow

2

13. Results:

 

AEP: 1% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.0107 0.0105 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0105 0.0108 0.0105 0.0001 0.0104
ECN_lpet_15min 0.0105 0.0104 0.0104 0.0104 0.0104 0.0105 0.0105 0.0107 0.0105 0.0104 0.0105 0.0001 0.0105
ECN_lpet_1_Shr 0.0104 0.0104 0.0104 0.0104 0.0105 0.0105 0.0104 0.0104 0.0104 0.0104 0.0104 0.0000 0.0104

ECN_lp¢et_lhr 0.0105 0.0104 0.0104 0.0104 0.0104 0.0104 0.0105 0.0105 0.0104 0.0105 0.0104 0.0000 0.0104

ECN_lpet_20min 0.0105 0.0107 0.0104 0.0104 0.0104 0.0105 0.0104 0.0104 0.0105 0.0104 0.0105 0.0001 0.0104

ECN_lpet_25min 0.0104 0.0106 0.0104 0.0104 0.0104 0.0104 0.0106 0.0104 0.0104 0.0104 0.0105 0.0001 0.0104

ECN_lpcet_2hr 0.0104 0.0104 0.0104 0.0104 0.0104 0.0105 0.0099 0.0099 0.0104 0.0106 0.0103 0.0002 0.0104
ECN_lpet_30min 0.0105 0.0104 0.0105 0.0104 0.0104 0.0105 0.0104 0.0104 0.0110 0.0104 0.0105 0.0002 0.0104
ECN_lpcet_3hr 0.0104 0.0104 0.0104 0.0104 0.0095 0.0104 0.0087 0.0104 0.0085 0.0104 0.0099 0.0007 0.0104
ECN_lpet_45min 0.0106 0.0107 0.0104 0.0104 0.0105 0.0104 0.0104 0.0104 0.0104 0.0104 0.0105 0.0001 0.0104
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_15min.
The median pattern for this ensemble is storm 7 (storm name : ECN_1pct_15min_7).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_lpct_15min_8).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_10pet_10min 0.0097 0.0097 0.0095 0.0095 0.0098 0.0097 0.0099 0.0097 0.0097 0.0098 0.0097 0.0001 0.0097
ECN_10pet_15min 0.0098 0.0098 0.0099 0.0103 0.0102 0.0101 0.0101 0.0102 0.0104 0.0105 0.0101 0.0002 0.0101
ECN_10pet_1_Shr 0.0096 0.0087 0.0095 0.0095 0.0095 0.0093 0.0080 0.0085 0.0082 0.0094 0.0090 0.0006 0.0093

ECN_10pet_1hr 0.0104 0.0091 0.0095 0.0092 0.0094 0.0090 0.0097 0.0095 0.0090 0.0104 0.0095 0.0005 0.0094
ECN_10pet_20min 0.0099 0.0100 0.0102 0.0104 0.0103 0.0104 0.0103 0.0104 0.0104 0.0100 0.0102 0.0002 0.0103
ECN_10pet_25min 0.0101 0.0104 0.0097 0.0098 0.0096 0.0106 0.0102 0.0103 0.0100 0.0104 0.0101 0.0003 0.0102

ECN_10pet_2hr 0.0088 0.0079 0.0082 0.0104 0.0090 0.0082 0.0086 0.0077 0.0087 0.0080 0.0086 0.0007 0.0084
ECN_10pet_30min 0.0096 0.0103 0.0104 0.0100 0.0099 0.0101 0.0104 0.0103 0.0105 0.0104 0.0102 0.0003 0.0103

ECN_10pet_3hr 0.0104 0.0078 0.0081 0.0094 0.0085 0.0066 0.0079 0.0071 0.0079 0.0082 0.0082 0.0010 0.0080
ECN_10pet_45min 0.0103 0.0101 0.0101 0.0101 0.0098 0.0103 0.0094 0.0089 0.0104 0.0103 0.0100 0.0005 0.0101

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_30min.

The median pattern for this ensemble is storm 8 (storm name : ECN_10pct_30min_8).

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (Storm name : ECN_10pct_30min_9).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_2pet_10min 0.0106 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0106 0.0104 0.0104 0.0105 0.0001 0.0104
ECN_2pet_15min 0.0104 0.0104 0.0104 0.0104 0.0104 0.0106 0.0104 0.0105 0.0104 0.0104 0.0104 0.0001 0.0104
ECN_2pet_1_Shr 0.0099 0.0104 0.0104 0.0101 0.0104 0.0104 0.0102 0.0104 0.0104 0.0107 0.0103 0.0002 0.0104

ECN_2pcet_lhr 0.0105 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0000 0.0104

ECN_2pet_20min 0.0108 0.0105 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0105 0.0001 0.0104

ECN_2pet_25min 0.0104 0.0105 0.0104 0.0105 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0000 0.0104
ECN_2pcet_2hr 0.0103 0.0097 0.0103 0.0102 0.0107 0.0100 0.0091 0.0091 0.0104 0.0104 0.0100 0.0005 0.0102
ECN_2pet_30min 0.0104 0.0107 0.0104 0.0104 0.0105 0.0106 0.0104 0.0104 0.0104 0.0104 0.0105 0.0001 0.0104
ECN_2pet_3hr 0.0101 0.0098 0.0102 0.0095 0.0086 0.0096 0.0079 0.0103 0.0078 0.0104 0.0094 0.0009 0.0097
ECN_2pet_45min 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0105 0.0104 0.0104 0.0104 0.0104 0.0000 0.0104
CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_45min.
The median pattern for this ensemble is storm 3 (storm name : ECN_2pct_45min_3).
The pattern with the greatest <Max Flow> for this ensemble is storm 7 (storm name : ECN_2pct_45min_7).
AEP: 20% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

Page 60

 

 

 

 

 

 

 

 

 

 

 

 

 

ECN_20pet_10min 0.0088 0.0088 0.0088 0.0091 0.0089 0.0090 0.0088 0.0091 0.0087 0.0088 0.0089 0.0001 0.0088
ECN_20pet_15min 0.0090 0.0089 0.0090 0.0091 0.0093 0.0093 0.0094 0.0094 0.0096 0.0097 0.0093 0.0002 0.0093
ECN_20pet_1_Shr 0.0080 0.0089 0.0093 0.0066 0.0086 0.0062 0.0069 0.0083 0.0092 0.0087 0.0081 0.0011 0.0085

ECN_20pet_lhr 0.0097 0.0082 0.0089 0.0086 0.0086 0.0090 0.0079 0.0081 0.0088 0.0089 0.0087 0.0005 0.0087
ECN_20pet_20min 0.0088 0.0090 0.0090 0.0093 0.0093 0.0092 0.0096 0.0093 0.0097 0.0097 0.0093 0.0003 0.0093
ECN_20pet_25min 0.0092 0.0093 0.0088 0.0089 0.0090 0.0094 0.0096 0.0094 0.0100 0.0098 0.0093 0.0004 0.0093

ECN_20pet_2hr 0.0083 0.0076 0.0081 0.0075 0.0089 0.0062 0.0093 0.0085 0.0066 0.0075 0.0079 0.0009 0.0078
ECN_20pcet_30min 0.0101 0.0087 0.0086 0.0086 0.0093 0.0092 0.0094 0.0096 0.0093 0.0096 0.0092 0.0005 0.0093

ECN_20pet_3hr 0.0084 0.0089 0.0100 0.0070 0.0066 0.0057 0.0058 0.0053 0.0061 0.0081 0.0072 0.0015 0.0068
ECN_20pet_45min 0.0091 0.0089 0.0083 0.0093 0.0086 0.0084 0.0084 0.0086 0.0094 0.0091 0.0088 0.0004 0.0087

CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min.

The median pattern for this ensemble is storm 9 (storm name : ECN_20pct_30min_9).

The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).

REP: 5% - Max Flow (m*3/s)
Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_5pet_10min 0.0104 0.0103 0.0102 0.0102 0.0104 0.0104 0.0105 0.0104 0.0103 0.0104 0.0104 0.0001 0.0104
ECN_5pet_15min 0.0104 0.0104 0.0106 0.0104 0.0106 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0001 0.0104
ECN_5pet_1_5hr 0.0104 0.0098 0.0104 0.0104 0.0104 0.0103 0.0088 0.0094 0.0090 0.0104 0.0099 0.0006 0.0103
ECN_5pcet_lhr 0.0104 0.0101 0.0104 0.0101 0.0103 0.0101 0.0104 0.0104 0.0100 0.0105 0.0103 0.0002 0.0103
ECN_5pet_20min 0.0104 0.0106 0.0107 0.0104 0.0104 0.0105 0.0104 0.0105 0.0105 0.0104 0.0105 0.0001 0.0104
ECN_5pet_25min 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0105 0.0104 0.0000 0.0104
ECN_5pcet_2hr 0.0099 0.0087 0.0090 0.0104 0.0101 0.0090 0.0095 0.0086 0.0098 0.0088 0.0094 0.0006 0.0093
ECN_5pet_30min 0.0104 0.0106 0.0104 0.0105 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0104 0.0001 0.0104
ECN_5pcet_3hr 0.0104 0.0087 0.0088 0.0104 0.0096 0.0077 0.0089 0.0082 0.0090 0.0091 0.0091 0.0008 0.0089

ECN_5pet_45min 0.0104 0.0106 0.0104 0.0104 0.0104 0.0104 0.0103 0.0100 0.0105 0.0104 0.0104 0.0001 0.0104

CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_Spct_20min.

The median pattern for this ensemble is storm 8 (storm name : ECN_Spct_20min_8).

The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_Spct_20min_3).

AEP: 50% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_50pet_10min 0.0074 0.0073 0.0073 0.0075 0.0075 0.0075 0.0073 0.0076 0.0073 0.0074 0.0074 0.0001 0.0074
ECN_50pet_15min 0.0074 0.0072 0.0076 0.0075 0.0076 0.0079 0.0080 0.0079 0.0082 0.0082 0.0077 0.0003 0.0078
ECN_50pet_1_Shr 0.0058 0.0068 0.0075 0.0052 0.0068 0.0050 0.0054 0.0061 0.0074 0.0066 0.0063 0.0008 0.0063

ECN_50pet_1hr 0.0080 0.0060 0.0072 0.0068 0.0067 0.0072 0.0057 0.0060 0.0069 0.0068 0.0067 0.0006 0.0068
ECN_50pet_20min 0.0072 0.0075 0.0072 0.0079 0.0076 0.0074 0.0081 0.0077 0.0082 0.0081 0.0077 0.0003 0.0076
ECN_50pet_25min 0.0076 0.0077 0.0070 0.0071 0.0073 0.0078 0.0080 0.0076 0.0083 0.0082 0.0076 0.0004 0.0076

ECN_50pet_2hr 0.0061 0.0055 0.0060 0.0055 0.0069 0.0052 0.0074 0.0064 0.0052 0.0055 0.0060 0.0007 0.0058
ECN_50pet_30min 0.0084 0.0069 0.0068 0.0067 0.0075 0.0077 0.0078 0.0081 0.0076 0.0078 0.0075 0.0005 0.0077

ECN_50pet_3hr 0.0060 0.0068 0.0080 0.0054 0.0050 0.0044 0.0049 0.0041 0.0050 0.0057 0.0055 0.0011 0.0052
ECN_50pet_45min 0.0076 0.0073 0.0064 0.0077 0.0066 0.0064 0.0064 0.0064 0.0075 0.0071 0.0069 0.0005 0.0069

CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_15min.

The median pattern for this ensemble is storm 6 (storm name : ECN_SOpct_15min_6).

The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_S50pct_15min_10).

REP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0066 0.0063 0.0063 0.0071 0.0067 0.0068 0.0063 0.0068 0.0066 0.0066 0.0066 0.0002 0.0066
ECN_63pcet_15min 0.0066 0.0065 0.0068 0.0067 0.0068 0.0071 0.0069 0.0068 0.0074 0.0074 0.0069 0.0003 0.0068
ECN_63pet_1_Shr 0.0054 0.0059 0.0066 0.0049 0.0059 0.0044 0.0052 0.0056 0.0066 0.0058 0.0056 0.0007 0.0057

ECN_63pet_lhr 0.0071 0.0056 0.0063 0.0061 0.0060 0.0063 0.0052 0.0055 0.0061 0.0059 0.0060 0.0005 0.0060
ECN_63pet_20min 0.0065 0.0066 0.0064 0.0071 0.0068 0.0066 0.0073 0.0068 0.0072 0.0072 0.0069 0.0003 0.0068
ECN_63pcet_25min 0.0068 0.0068 0.0063 0.0064 0.0064 0.0069 0.0071 0.0068 0.0077 0.0074 0.0069 0.0004 0.0068

ECN_63pet_2hr 0.0056 0.0052 0.0056 0.0052 0.0060 0.0049 0.0065 0.0059 0.0049 0.0052 0.0055 0.0005 0.0054
ECN_63pcet_30min 0.0078 0.0063 0.0061 0.0059 0.0066 0.0069 0.0069 0.0074 0.0067 0.0068 0.0067 0.0005 0.0068

ECN_63pet_3hr 0.0054 0.0059 0.0069 0.0051 0.0045 0.0038 0.0043 0.0035 0.0043 0.0052 0.0049 0.0010 0.0048
ECN_63pcet_45min 0.0066 0.0064 0.0058 0.0068 0.0059 0.0058 0.0057 0.0057 0.0066 0.0063 0.0062 0.0004 0.0061

 

CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_25min.
The median pattern for this ensemble is storm 8 (storm name : ECN_63pct_25min_8).
The pattern with the greatest <Max Flow> for this ensemble is storm 9 (Storm name : ECN_63pct_25min_9).

 

 

Page 61

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

 

Summary information:

 

6 Total No. of Ensembles: 70

 

7 No. of Storms per ensemble: 10

8 No. of AEP Bands: 7

9 Object Name: Link2_Low Flow 2
0 Result type: Max Flow

2

13. Results:

 

AEP: 1% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.0111 0.0115 0.0111 0.0117 0.0116 0.0116 0.0115 0.0112 0.0122 0.0110 0.0115 0.0003 0.0115
ECN_lpet_15min 0.0123 0.0125 0.0110 0.0112 0.0126 0.0121 0.0115 0.0130 0.0120 0.0114 0.0120 0.0006 0.0121
ECN_lpet_1_Shr 0.0087 0.0095 0.0103 0.0092 0.0096 0.0098 0.0093 0.0105 0.0096 0.0100 0.0096 0.0005 0.0096

ECN_lp¢et_lhr 0.0116 0.0111 0.0098 0.0106 0.0087 0.0108 0.0093 0.0099 0.0101 0.0093 0.0101 0.0009 0.0100

ECN_lpet_20min 0.0113 0.0128 0.0112 0.0108 0.0111 0.0120 0.0113 0.0117 0.0117 0.0126 0.0117 0.0006 0.0115

ECN_lpet_25min 0.0108 0.0131 0.0118 0.0116 0.0120 0.0114 0.0108 0.0124 0.0113 0.0130 0.0118 0.0008 0.0117

ECN_lpcet_2hr 0.0095 0.0088 0.0084 0.0087 0.0099 0.0089 0.0079 0.0080 0.0087 0.0090 0.0088 0.0006 0.0088
ECN_lpet_30min 0.0104 0.0116 0.0132 0.0105 0.0108 0.0122 0.0110 0.0118 0.0117 0.0107 0.0114 0.0008 0.0113
ECN_lpcet_3hr 0.0087 0.0086 0.0094 0.0081 0.0066 0.0086 0.0063 0.0095 0.0063 0.0103 0.0082 0.0013 0.0086
ECN_lpet_45min 0.0127 0.0116 0.0098 0.0118 0.0107 0.0098 0.0104 0.0124 0.0092 0.0107 0.0109 0.0011 0.0107
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_15min.
The median pattern for this ensemble is storm 6 (storm name : ECN_Ipct_15min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_lpct_15min_8).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_10pet_10min 0.0092 0.0092 0.0090 0.0090 0.0094 0.0093 0.0095 0.0094 0.0092 0.0095 0.0093 0.0002 0.0093
ECN_10pet_15min 0.0088 0.0090 0.0089 0.0095 0.0093 0.0090 0.0092 0.0092 0.0099 0.0098 0.0092 0.0004 0.0092
ECN_10pet_1_Shr 0.0082 0.0066 0.0079 0.0086 0.0073 0.0072 0.0062 0.0073 0.0055 0.0073 0.0072 0.0009 0.0073

ECN_10pet_1hr 0.0087 0.0073 0.0079 0.0084 0.0081 0.0074 0.0077 0.0080 0.0072 0.0092 0.0080 0.0006 0.0080
ECN_10pet_20min 0.0091 0.0087 0.0089 0.0093 0.0095 0.0091 0.0087 0.0097 0.0098 0.0086 0.0091 0.0004 0.0091
ECN_10pet_25min 0.0084 0.0096 0.0082 0.0086 0.0086 0.0098 0.0087 0.0087 0.0090 0.0093 0.0089 0.0005 0.0087

ECN_10pet_2hr 0.0072 0.0054 0.0069 0.0088 0.0065 0.0075 0.0069 0.0056 0.0072 0.0068 0.0069 0.0009 0.0069
ECN_10pet_30min 0.0082 0.0095 0.0094 0.0080 0.0079 0.0089 0.0092 0.0088 0.0088 0.0090 0.0088 0.0005 0.0088

ECN_10pet_3hr 0.0085 0.0056 0.0067 0.0075 0.0064 0.0044 0.0058 0.0050 0.0055 0.0055 0.0061 0.0012 0.0057
ECN_10pet_45min 0.0091 0.0088 0.0090 0.0080 0.0078 0.0082 0.0074 0.0065 0.0091 0.0087 0.0083 0.0008 0.0084

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_10min.

The median pattern for this ensemble is storm 6 (storm name : ECN_10pct_10min_6).

The pattern with the greatest <Max Flow> for this ensemble is storm 7 (Storm name : ECN_10pct_10min_7).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

ECN_2pet_10min 0.0104 0.0106 0.0104 0.0107 0.0107 0.0107 0.0106 0.0105 0.0110 0.0103 0.0106 0.0002 0.0106

ECN_2pet_15min 0.0111 0.0111 0.0103 0.0104 0.0112 0.0109 0.0105 0.0117 0.0109 0.0105 0.0108 0.0004 0.0109

ECN_2pet_1_Shr 0.0080 0.0086 0.0093 0.0086 0.0087 0.0089 0.0087 0.0098 0.0086 0.0090 0.0088 0.0005 0.0087

ECN_2pcet_lhr 0.0106 0.0102 0.0089 0.0098 0.0081 0.0100 0.0087 0.0092 0.0093 0.0088 0.0094 0.0007 0.0092
ECN_2pet_20min 0.0105 0.0116 0.0104 0.0100 0.0103 0.0108 0.0104 0.0106 0.0107 0.0112 0.0107 0.0004 0.0105
ECN_2pet_25min 0.0100 0.0119 0.0107 0.0105 0.0107 0.0104 0.0100 0.0109 0.0105 0.0114 0.0107 0.0006 0.0106

ECN_2pcet_2hr 0.0088 0.0082 0.0080 0.0083 0.0089 0.0084 0.0069 0.0069 0.0080 0.0083 0.0081 0.0007 0.0082
ECN_2pet_30min 0.0100 0.0105 0.0119 0.0097 0.0101 0.0111 0.0102 0.0106 0.0106 0.0100 0.0105 0.0006 0.0104

ECN_2pet_3hr 0.0081 0.0081 0.0088 0.0072 0.0057 0.0080 0.0057 0.0090 0.0057 0.0094 0.0076 0.0014 0.0080
ECN_2pet_45min 0.0112 0.0107 0.0090 0.0104 0.0099 0.0089 0.0096 0.0109 0.0085 0.0100 0.0099 0.0009 0.0100

CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_15min.
The median pattern for this ensemble is storm 6 (storm name : ECN_2pct_15min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).
AEP: 20% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

Page 62

 

 

 

 

 

 

 

 

 

 

 

 

 

ECN_20pet_10min 0.0083 0.0082 0.0082 0.0088 0.0085 0.0085 0.0083 0.0086 0.0082 0.0084 0.0084 0.0002 0.0083
ECN_20pet_15min 0.0082 0.0079 0.0079 0.0081 0.0082 0.0083 0.0084 0.0084 0.0088 0.0089 0.0083 0.0003 0.0083
ECN_20pet_1_Shr 0.0058 0.0073 0.0079 0.0051 0.0075 0.0052 0.0055 0.0064 0.0079 0.0066 0.0065 0.0011 0.0065

ECN_20pet_lhr 0.0086 0.0060 0.0071 0.0077 0.0071 0.0076 0.0055 0.0059 0.0075 0.0066 0.0070 0.0009 0.0071
ECN_20pet_20min 0.0072 0.0079 0.0079 0.0081 0.0081 0.0076 0.0088 0.0080 0.0085 0.0087 0.0081 0.0005 0.0081
ECN_20pet_25min 0.0081 0.0080 0.0081 0.0080 0.0082 0.0084 0.0084 0.0078 0.0088 0.0085 0.0082 0.0003 0.0082

ECN_20pet_2hr 0.0061 0.0057 0.0064 0.0054 0.0070 0.0054 0.0082 0.0082 0.0052 0.0054 0.0063 0.0011 0.0059
ECN_20pcet_30min 0.0088 0.0075 0.0078 0.0072 0.0076 0.0085 0.0082 0.0087 0.0080 0.0081 0.0080 0.0005 0.0080

ECN_20pet_3hr 0.0058 0.0068 0.0081 0.0054 0.0047 0.0041 0.0048 0.0038 0.0047 0.0053 0.0053 0.0012 0.0050
ECN_20pet_45min 0.0083 0.0081 0.0065 0.0081 0.0070 0.0064 0.0063 0.0060 0.0080 0.0077 0.0072 0.0008 0.0074

CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_10min.

The median pattern for this ensemble is storm 10 (storm name : ECN_20pct_10min_10).

The pattern with the greatest <Max Flow> for this ensemble is storm 4 (storm name : ECN_20pct_10min_4).

REP: 5% - Max Flow (m*3/s)
Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_5pet_10min 0.0100 0.0100 0.0098 0.0098 0.0101 0.0100 0.0103 0.0102 0.0100 0.0103 0.0101 0.0002 0.0100
ECN_5pet_15min 0.0095 0.0098 0.0096 0.0101 0.0099 0.0096 0.0100 0.0099 0.0104 0.0103 0.0099 0.0003 0.0099
ECN_5pet_1_5hr 0.0089 0.0077 0.0088 0.0095 0.0082 0.0084 0.0071 0.0083 0.0063 0.0082 0.0081 0.0009 0.0083
ECN_5pcet_lhr 0.0094 0.0084 0.0088 0.0090 0.0088 0.0083 0.0085 0.0088 0.0081 0.0101 0.0088 0.0006 0.0088
ECN_5pet_20min 0.0099 0.0095 0.0098 0.0100 0.0101 0.0098 0.0094 0.0106 0.0106 0.0093 0.0099 0.0004 0.0098
ECN_5pet_25min 0.0091 0.0105 0.0088 0.0093 0.0093 0.0105 0.0095 0.0094 0.0095 0.0103 0.0096 0.0006 0.0094
ECN_5pcet_2hr 0.0083 0.0059 0.0080 0.0097 0.0076 0.0083 0.0082 0.0061 0.0083 0.0081 0.0079 0.0011 0.0081
ECN_5pet_30min 0.0089 0.0101 0.0100 0.0087 0.0087 0.0095 0.0100 0.0094 0.0096 0.0098 0.0095 0.0005 0.0095
ECN_5pcet_3hr 0.0098 0.0065 0.0078 0.0085 0.0077 0.0051 0.0069 0.0055 0.0065 0.0064 0.0071 0.0013 0.0067

ECN_5pet_45min 0.0099 0.0098 0.0098 0.0086 0.0086 0.0089 0.0084 0.0075 0.0100 0.0093 0.0091 0.0008 0.0091

CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_S5pct_l0min.

The median pattern for this ensemble is storm 9 (storm name : ECN_Spct_1l0min_9).

The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN Spct_10min_10).

AEP: 50% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_50pet_10min 0.0064 0.0063 0.0064 0.0068 0.0067 0.0068 0.0064 0.0069 0.0064 0.0065 0.0066 0.0002 0.0065
ECN_50pet_15min 0.0063 0.0061 0.0059 0.0060 0.0062 0.0064 0.0065 0.0064 0.0071 0.0071 0.0064 0.0004 0.0063
ECN_50pet_1_Shr 0.0050 0.0056 0.0057 0.0038 0.0057 0.0040 0.0044 0.0051 0.0058 0.0052 0.0050 0.0007 0.0051

ECN_50pet_1hr 0.0064 0.0050 0.0055 0.0057 0.0056 0.0055 0.0049 0.0050 0.0056 0.0052 0.0054 0.0004 0.0055
ECN_50pet_20min 0.0057 0.0059 0.0059 0.0060 0.0061 0.0056 0.0069 0.0060 0.0067 0.0068 0.0061 0.0004 0.0060
ECN_50pet_25min 0.0061 0.0060 0.0060 0.0060 0.0062 0.0063 0.0063 0.0055 0.0071 0.0066 0.0062 0.0004 0.0062

ECN_50pet_2hr 0.0048 0.0049 0.0051 0.0043 0.0051 0.0045 0.0059 0.0063 0.0040 0.0043 0.0049 0.0007 0.0049
ECN_50pet_30min 0.0070 0.0057 0.0059 0.0055 0.0055 0.0064 0.0060 0.0069 0.0057 0.0059 0.0061 0.0005 0.0059

ECN_50pet_3hr 0.0044 0.0050 0.0057 0.0041 0.0033 0.0030 0.0034 0.0027 0.0033 0.0039 0.0039 0.0009 0.0036
ECN_50pet_45min 0.0061 0.0059 0.0053 0.0059 0.0056 0.0050 0.0051 0.0050 0.0059 0.0057 0.0056 0.0004 0.0057

CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_10min.

The median pattern for this ensemble is storm 10 (storm name : ECN_5Opct_10min_10).

The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_50pct_10min_8).

REP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0058 0.0058 0.0058 0.0065 0.0059 0.0059 0.0058 0.0061 0.0058 0.0059 0.0059 0.0002 0.0058
ECN_63pcet_15min 0.0057 0.0057 0.0055 0.0055 0.0057 0.0058 0.0057 0.0057 0.0062 0.0064 0.0058 0.0003 0.0057
ECN_63pet_1_Shr 0.0044 0.0053 0.0052 0.0031 0.0052 0.0037 0.0039 0.0047 0.0054 0.0048 0.0046 0.0007 0.0047

ECN_63pet_lhr 0.0058 0.0044 0.0052 0.0053 0.0053 0.0052 0.0042 0.0045 0.0053 0.0048 0.0050 0.0005 0.0052
ECN_63pet_20min 0.0055 0.0054 0.0055 0.0055 0.0056 0.0052 0.0060 0.0055 0.0059 0.0061 0.0056 0.0003 0.0055
ECN_63pcet_25min 0.0056 0.0055 0.0057 0.0056 0.0057 0.0057 0.0056 0.0052 0.0062 0.0059 0.0057 0.0002 0.0056

ECN_63pet_2hr 0.0043 0.0041 0.0048 0.0037 0.0048 0.0039 0.0054 0.0058 0.0035 0.0037 0.0044 0.0007 0.0042
ECN_63pcet_30min 0.0061 0.0054 0.0055 0.0053 0.0051 0.0058 0.0056 0.0060 0.0053 0.0055 0.0056 0.0003 0.0055

ECN_63pet_3hr 0.0039 0.0044 0.0052 0.0036 0.0029 0.0026 0.0030 0.0024 0.0029 0.0034 0.0034 0.0008 0.0032
ECN_63pcet_45min 0.0057 0.0054 0.0050 0.0055 0.0053 0.0045 0.0047 0.0046 0.0054 0.0054 0.0052 0.0004 0.0053

 

CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.
The median pattern for this ensemble is storm 10 (storm name : ECN_63pct_10min_10).
The pattern with the greatest <Max Flow> for this ensemble is storm 4 (storm name : ECN_63pct_10min_4).

 

 

Page 63

 

Summary information:

 

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

6 Total No. of Ensembles: 70

7 No. of Storms per ensemble: 10
No. of AEP Bands: 7

Object Name:
Result type:

 

 

13 Results:

Link3_Low Flow 3
Max Flow

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AEP: 1% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.0105 0.0107 0.0106 0.0107 0.0107 0.0107 0.0106 0.0106 0.0109 0.0105 0.0106 0.0001 0.0106
ECN_lpet_15min 0.0118 0.0120 0.0111 0.0112 0.0119 0.0117 0.0114 0.0121 0.0116 0.0113 0.0116 0.0003 0.0117
ECN_lpet_1_Shr 0.0096 0.0109 0.0118 0.0098 0.0105 0.0111 0.0099 0.0107 0.0110 0.0114 0.0107 0.0007 0.0108

ECN_lp¢et_lhr 0.0126 0.0127 0.0115 0.0110 0.0104 0.0115 0.0100 0.0102 0.0113 0.0102 0.0111 0.0009 0.0111

ECN_lpet_20min 0.0119 0.0126 0.0115 0.0116 0.0118 0.0119 0.0120 0.0122 0.0119 0.0128 0.0120 0.0004 0.0119

ECN_lpet_25min 0.0118 0.0132 0.0118 0.0125 0.0129 0.0121 0.0120 0.0126 0.0124 0.0132 0.0125 0.0005 0.0125
ECN_lpcet_2hr 0.0100 0.0094 0.0100 0.0098 0.0114 0.0097 0.0089 0.0089 0.0101 0.0103 0.0099 0.0007 0.0099
ECN_lpet_30min 0.0113 0.0126 0.0133 0.0121 0.0114 0.0111 0.0125 0.0127 0.0129 0.0118 0.0122 0.0007 0.0123
ECN_lpcet_3hr 0.0098 0.0095 0.0099 0.0093 0.0084 0.0094 0.0077 0.0100 0.0076 0.0113 0.0093 0.0011 0.0094
ECN_lpet_45min 0.0132 0.0121 0.0109 0.0131 0.0122 0.0115 0.0108 0.0125 0.0109 0.0112 0.0118 0.0009 0.0118
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_25min.
The median pattern for this ensemble is storm 4 (storm name : ECN_Ipct_25min_4).
The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_lpct_25min_10).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_10pet_10min 0.0089 0.0089 0.0088 0.0088 0.0090 0.0090 0.0091 0.0090 0.0089 0.0091 0.0090 0.0001 0.0090
ECN_10pet_15min 0.0089 0.0090 0.0091 0.0095 0.0094 0.0092 0.0092 0.0094 0.0096 0.0097 0.0093 0.0002 0.0093
ECN_10pet_1_Shr 0.0087 0.0079 0.0085 0.0088 0.0085 0.0084 0.0068 0.0077 0.0071 0.0085 0.0081 0.0006 0.0084

ECN_10pet_1hr 0.0094 0.0082 0.0086 0.0083 0.0085 0.0082 0.0087 0.0086 0.0082 0.0099 0.0087 0.0005 0.0086
ECN_10pet_20min 0.0090 0.0090 0.0093 0.0095 0.0095 0.0095 0.0094 0.0098 0.0099 0.0091 0.0094 0.0003 0.0094
ECN_10pet_25min 0.0091 0.0099 0.0087 0.0088 0.0086 0.0098 0.0093 0.0093 0.0092 0.0097 0.0092 0.0004 0.0092

ECN_10pet_2hr 0.0079 0.0068 0.0073 0.0095 0.0082 0.0074 0.0077 0.0063 0.0080 0.0068 0.0076 0.0009 0.0076
ECN_10pet_30min 0.0086 0.0095 0.0095 0.0090 0.0089 0.0092 0.0095 0.0093 0.0096 0.0097 0.0093 0.0003 0.0094

ECN_10pet_3hr 0.0099 0.0067 0.0072 0.0085 0.0077 0.0056 0.0069 0.0058 0.0068 0.0071 0.0072 0.0012 0.0070
ECN_10pet_45min 0.0094 0.0091 0.0092 0.0091 0.0088 0.0093 0.0085 0.0080 0.0095 0.0094 0.0090 0.0004 0.0092

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_30min.

The median pattern for this ensemble is storm 2 (storm name : ECN_10pct_30min_2).

The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_10pct_30min_10).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

ECN_2pet_10min 0.0100 0.0101 0.0101 0.0102 0.0102 0.0102 0.0102 0.0101 0.0104 0.0100 0.0101 0.0001 0.0101

ECN_2pet_15min 0.0108 0.0109 0.0104 0.0105 0.0109 0.0108 0.0106 0.0110 0.0107 0.0106 0.0107 0.0002 0.0107

ECN_2pet_1_Shr 0.0089 0.0100 0.0105 0.0091 0.0097 0.0101 0.0093 0.0100 0.0101 0.0103 0.0098 0.0005 0.0100

ECN_2pcet_lhr 0.0112 0.0112 0.0104 0.0103 0.0096 0.0105 0.0094 0.0096 0.0104 0.0094 0.0102 0.0006 0.0103
ECN_2pet_20min 0.0108 0.0115 0.0106 0.0106 0.0108 0.0108 0.0108 0.0109 0.0108 0.0115 0.0109 0.0003 0.0108
ECN_2pet_25min 0.0107 0.0121 0.0108 0.0112 0.0115 0.0109 0.0108 0.0113 0.0112 0.0120 0.0112 0.0005 0.0112

ECN_2pcet_2hr 0.0093 0.0088 0.0091 0.0092 0.0104 0.0091 0.0082 0.0082 0.0093 0.0094 0.0091 0.0006 0.0092
ECN_2pet_30min 0.0104 0.0112 0.0123 0.0108 0.0105 0.0104 0.0111 0.0113 0.0115 0.0107 0.0110 0.0006 0.0109

ECN_2pet_3hr 0.0091 0.0088 0.0093 0.0085 0.0077 0.0086 0.0069 0.0094 0.0066 0.0103 0.0085 0.0011 0.0087
ECN_2pet_45min 0.0119 0.0109 0.0101 0.0114 0.0108 0.0105 0.0101 0.0110 0.0101 0.0104 0.0107 0.0006 0.0106

CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_25min.
The median pattern for this ensemble is storm 4 (storm name : ECN_2pct_25min_4).
The pattern with the greatest <Max Flow> for this ensemble is storm 2 (storm name : ECN_2pct_25min_2).
AEP: 20% - Max Flow (m*3/s)
*
| Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

Page 64

 

 

 

 

 

 

 

 

 

 

 

 

 

ECN_20pet_10min 0.0082 0.0082 0.0082 0.0085 0.0083 0.0083 0.0082 0.0084 0.0081 0.0082 0.0083 0.0001 0.0082
ECN_20pet_15min 0.0083 0.0082 0.0084 0.0084 0.0085 0.0086 0.0086 0.0086 0.0088 0.0089 0.0085 0.0002 0.0085
ECN_20pet_1_Shr 0.0069 0.0081 0.0085 0.0057 0.0080 0.0055 0.0059 0.0074 0.0084 0.0078 0.0072 0.0011 0.0076

ECN_20pet_lhr 0.0088 0.0073 0.0082 0.0080 0.0079 0.0083 0.0068 0.0071 0.0081 0.0081 0.0078 0.0006 0.0080
ECN_20pet_20min 0.0082 0.0083 0.0082 0.0086 0.0085 0.0084 0.0088 0.0085 0.0089 0.0089 0.0085 0.0003 0.0085
ECN_20pet_25min 0.0084 0.0085 0.0080 0.0081 0.0082 0.0086 0.0087 0.0085 0.0091 0.0089 0.0085 0.0003 0.0085

ECN_20pet_2hr 0.0074 0.0063 0.0072 0.0063 0.0081 0.0056 0.0085 0.0080 0.0057 0.0064 0.0069 0.0010 0.0068
ECN_20pcet_30min 0.0092 0.0080 0.0079 0.0079 0.0085 0.0085 0.0086 0.0088 0.0085 0.0087 0.0085 0.0004 0.0085

ECN_20pet_3hr 0.0074 0.0081 0.0090 0.0060 0.0056 0.0052 0.0053 0.0050 0.0055 0.0070 0.0064 0.0013 0.0058
ECN_20pet_45min 0.0084 0.0082 0.0075 0.0085 0.0078 0.0075 0.0075 0.0078 0.0085 0.0082 0.0080 0.0004 0.0080

CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_15min.

The median pattern for this ensemble is storm 6 (storm name : ECN_20pct_15min_6).

The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_20pct_15min_10).

REP: 5% - Max Flow (m*3/s)
Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_5pet_10min 0.0096 0.0095 0.0094 0.0094 0.0096 0.0096 0.0097 0.0096 0.0095 0.0096 0.0096 0.0001 0.0096
ECN_5pet_15min 0.0096 0.0096 0.0097 0.0101 0.0099 0.0098 0.0098 0.0100 0.0101 0.0102 0.0099 0.0002 0.0099
ECN_5pet_1_5hr 0.0095 0.0087 0.0094 0.0096 0.0094 0.0093 0.0080 0.0086 0.0082 0.0093 0.0090 0.0006 0.0093
ECN_5pcet_lhr 0.0102 0.0091 0.0095 0.0091 0.0094 0.0090 0.0095 0.0094 0.0090 0.0108 0.0095 0.0006 0.0094
ECN_5pet_20min 0.0098 0.0097 0.0100 0.0103 0.0101 0.0102 0.0100 0.0105 0.0106 0.0098 0.0101 0.0003 0.0101
ECN_5pet_25min 0.0099 0.0106 0.0094 0.0096 0.0094 0.0106 0.0102 0.0101 0.0098 0.0105 0.0100 0.0004 0.0100
ECN_5pcet_2hr 0.0089 0.0079 0.0082 0.0105 0.0090 0.0083 0.0087 0.0077 0.0088 0.0080 0.0086 0.0008 0.0085
ECN_5pet_30min 0.0094 0.0100 0.0102 0.0098 0.0097 0.0099 0.0103 0.0101 0.0104 0.0104 0.0100 0.0003 0.0101
ECN_5pcet_3hr 0.0111 0.0079 0.0082 0.0094 0.0087 0.0066 0.0080 0.0072 0.0080 0.0082 0.0083 0.0012 0.0081

ECN_5pet_45min 0.0102 0.0101 0.0099 0.0099 0.0096 0.0101 0.0093 0.0088 0.0104 0.0101 0.0098 0.0004 0.0100

CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_Spct_20min.

The median pattern for this ensemble is storm 5 (storm name : ECN_Spct_20min_5).

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_Spct_20min_9).

AEP: 50% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_50pet_10min 0.0065 0.0065 0.0065 0.0067 0.0066 0.0066 0.0065 0.0067 0.0064 0.0065 0.0065 0.0001 0.0065
ECN_50pet_15min 0.0065 0.0063 0.0066 0.0065 0.0067 0.0069 0.0070 0.0069 0.0073 0.0073 0.0068 0.0003 0.0068
ECN_50pet_1_Shr 0.0054 0.0059 0.0064 0.0048 0.0059 0.0044 0.0051 0.0055 0.0064 0.0058 0.0056 0.0006 0.0056

ECN_50pet_1hr 0.0070 0.0055 0.0062 0.0060 0.0059 0.0061 0.0051 0.0054 0.0060 0.0059 0.0059 0.0005 0.0059
ECN_50pet_20min 0.0062 0.0065 0.0063 0.0068 0.0066 0.0064 0.0071 0.0067 0.0073 0.0071 0.0067 0.0004 0.0067
ECN_50pet_25min 0.0066 0.0067 0.0060 0.0062 0.0063 0.0067 0.0069 0.0065 0.0075 0.0073 0.0067 0.0004 0.0066

ECN_50pet_2hr 0.0055 0.0052 0.0055 0.0051 0.0059 0.0049 0.0065 0.0059 0.0048 0.0051 0.0054 0.0005 0.0054
ECN_50pet_30min 0.0076 0.0061 0.0060 0.0058 0.0064 0.0067 0.0067 0.0072 0.0065 0.0067 0.0066 0.0005 0.0066

ECN_50pet_3hr 0.0054 0.0058 0.0068 0.0051 0.0044 0.0038 0.0042 0.0034 0.0043 0.0051 0.0048 0.0010 0.0047
ECN_50pet_45min 0.0065 0.0063 0.0057 0.0067 0.0059 0.0057 0.0056 0.0056 0.0066 0.0062 0.0061 0.0004 0.0060

CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_15min.

The median pattern for this ensemble is storm 8 (storm name : ECN_SOpct_15min_8).

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_15min_9).

REP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0059 0.0058 0.0058 0.0062 0.0060 0.0060 0.0058 0.0060 0.0059 0.0059 0.0059 0.0001 0.0059
ECN_63pcet_15min 0.0059 0.0058 0.0059 0.0059 0.0060 0.0062 0.0060 0.0060 0.0065 0.0065 0.0061 0.0002 0.0060
ECN_63pet_1_Shr 0.0051 0.0055 0.0058 0.0043 0.0055 0.0038 0.0047 0.0052 0.0058 0.0054 0.0051 0.0006 0.0053

ECN_63pet_lhr 0.0062 0.0052 0.0057 0.0056 0.0056 0.0056 0.0047 0.0051 0.0056 0.0054 0.0055 0.0004 0.0056
ECN_63pet_20min 0.0057 0.0059 0.0058 0.0061 0.0059 0.0058 0.0064 0.0059 0.0064 0.0063 0.0060 0.0002 0.0059
ECN_63pcet_25min 0.0059 0.0059 0.0057 0.0057 0.0058 0.0060 0.0061 0.0059 0.0067 0.0065 0.0060 0.0003 0.0059

ECN_63pet_2hr 0.0052 0.0049 0.0052 0.0048 0.0055 0.0042 0.0058 0.0057 0.0042 0.0048 0.0050 0.0005 0.0051
ECN_63pcet_30min 0.0067 0.0057 0.0056 0.0054 0.0058 0.0060 0.0059 0.0065 0.0058 0.0059 0.0059 0.0004 0.0059

ECN_63pet_3hr 0.0050 0.0054 0.0059 0.0046 0.0038 0.0033 0.0037 0.0030 0.0037 0.0046 0.0043 0.0009 0.0042
ECN_63pcet_45min 0.0059 0.0058 0.0053 0.0059 0.0055 0.0053 0.0052 0.0052 0.0059 0.0057 0.0056 0.0003 0.0056

 

CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_15min.
The median pattern for this ensemble is storm 5 (storm name : ECN_63pct_15min_5).
The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_63pct_15min_10).

 

 

Page 65

                                                           23098 - SBSMP/2
                                                                 Page 30




                                             Appendix K


  STORMWATER QUALITY OPERATION AND MAINTENANCE GUIDELINES




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 66

                                                          BIO-RETENTION
                                            OPERATIONAL MANAGEMENT AND
                                                  MAINTENANCE GUIDELINE




                                                  PROPOSED TOWNHOUSE DEVELOPMENT

                                                                            5 PEARL STREET, COOROY

                                                                                                              COOROY

                                                                                                            23098 - O&MG




D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\MCE Bio Retention Operational
Management & Maintenance Guideline - 21209 - Rev 0.doc

Page 67

                                                                                                         Page 2




                                          Table of Contents
1   INTRODUCTION .......................................................................................... 3
2   GENERAL .................................................................................................. 3
3   RESPONSIBILITY FOR INSPECTION ..................................................................... 3
4   DATA COLLECTION / STORAGE REQUIREMENTS ..................................................... 3
5   MAINTENANCE PROCEDURE............................................................................. 3
  5.1   General .............................................................................................. 3
  5.2   Inspections .......................................................................................... 4
  5.3   Watering ............................................................................................ 5
  5.4   Vegetation Management and Weed Control .................................................... 6
  5.5   Validation Water Quality Testing ................................................................ 6
  5.6   Equipment Needs .................................................................................. 6
  5.7   Occupational Health and Safety ................................................................. 6
  5.8   Public Safety ........................................................................................ 7
  5.9   Disposal Requirements ............................................................................ 7
  5.10 Access Issues ........................................................................................ 7
  5.11 Bio-Retention Basin Resetting .................................................................... 7
Appendix A     BIO-RETENTION BASIN MAINTENANCE CHECKLIST ..................................... 8




Bio-Retention Basin Operational Management and Maintenance Guideline

Page 68

                                                                                           Page 3




1 INTRODUCTION
The water quality treatment for the proposed development includes a proposed bio-retention
basin. This document provides an overview of the maintenance requirements for the bio-
retention water quality device(s) on site to ensure that they are properly maintained.


2 GENERAL
Bio-retention basins are vegetated areas where runoff is filtered through a filter media layer
(e.g. sandy loam) as it percolates downwards. It is then collected via perforated underground
drains and flows to downstream waterways or to storages for reuse. Bio-retention basins
operate by filtering stormwater runoff through densely planted surface vegetation and then
percolating runoff through a prescribed filter media. During percolation, pollutants are
retained through fine filtration, adsorption and some biological uptake. The vegetation in a bio-
retention system is a vital functional element of the system providing a substrate for biofilm
growth within the upper layer of the filter media. The proposed bio-retention basin within the
site will do much of the same. It has been designed to reduce the impact of the development
on the downstream waterway environment.


3 RESPONSIBILITY FOR INSPECTION
The principal involved consultancy will be required to appoint an appropriately qualified
consultant maintenance contractor to carry out the inspections of the bio-retention basin
during the construction and on-maintenance period. At the completion of the maintenance
period the responsibility to undertake the inspections and generally maintain the basin will be
shifted to Body Corporate.


4 DATA COLLECTION / STORAGE REQUIREMENTS
Inspection records will be required for comparison of the performance of the system. In order
to assist this process it is proposed that the Bio-retention Basin Maintenance Checklist prepared
by Healthy Waterways (2006) be adopted for the site. Refer Appendix A for a copy of the
checklist.

Copies of the completed checklist are to be forwarded to the Morgan Consulting Engineers (or
other consultant nominated by the Principal) and to be provided to Council at the expiry of the
maintenance period and on request thereafter.


5 MAINTENANCE PROCEDURE
5.1     General
Vegetation plays a key role in maintaining the porosity of the filter media of a bio-retention
basin and a strong healthy growth of vegetation is critical to its performance. Therefore the
most intensive period of maintenance is during the plant establishment period (i.e. first two
years) when weed removal and replanting may be required.



Bio-Retention Basin Operational Management and Maintenance Guideline

Page 69

                                                                                            Page 4




It is also the time when high sediment loads may impact on plant growth and infiltration rates.
For this reason, the bio-retention systems are to be initially turfed. Vegetation can be
introduced when construction has been completed on an appropriate percentage of the lots
draining to each bio-retention system.

Inflow systems and overflow systems require careful monitoring, as these can be prone to scour
and litter build up. Debris can block inlets or outlets and can be unsightly, particularly in high
visibility areas. Inspection and removal of debris should be done regularly, and debris should be
removed whenever it is observed on a site.


5.2     Inspections
5.2.1 General
The bio-retention basins treat stormwater runoff through the principles of sedimentation,
filtration and percolation. These devices do not incorporate the use of screens and require
minimal maintenance during their operation. However, the systems are subject to deposition of
sediment that is filtered through the media.

Routine inspections shall be undertaken on the bio-retention basins after every significant
rainfall event (30mm of rainfall in a 24 hour period) or on a three (3) monthly basis within the
first twelve (12) months and on a six (6) monthly basis thereafter. The requirements of the
inspection for the bio-retention basin shall include the following:

    1. Check for build up of sediment at pipe inlet structures;

    2. Check for sediment within sub-soil drainage lines;

    3. Check all concrete structures for damage and deterioration;

    4. Check for the build up of vegetation matter on the bed surface and removal of
       vegetation matter to ensure minimal blockage to media;

    5. Check achieved flow rate through the media is maintained in accordance with the design
       requirements and anticipated compaction;

    6. Check inflow systems, outlets and the under drainage pipe elements to identify and
       remove any blockages such as litter build up.

5.2.2 Filter Media
The filter media will be inspected for sediment deposition of the bed of the bio-retention
basins and removed as required.




Bio-Retention Basin Operational Management and Maintenance Guideline

Page 70

                                                                                           Page 5




Inspect for the accumulation of an impermeable layer (such as oily or clayey sediment) that
may have formed on the surface of the filter media. A symptom may be that water remains
ponded in the bio-retention basin for more than a few hours after a rain event. Repair minor
accumulations by raking away any mulch on the surface and scarifying the surface of the filter
media between plants. Any leaf litter should be removed to help maintain the surface porosity
of the filter media.

Ensure the perforated pipes are not blocked to prevent filter media and plants from becoming
waterlogged. A small steady clear flow of water may be observed discharging from the
perforated pipe at its connection into the downstream pit some hours after rainfall.

Note that smaller rainfall events after dry weather may be completely absorbed by the filter
media and not result in flow. Sub-soil drainage lines are to be flushed with clean water as
required to remove and blockage.

Sediment should be removed where it has smothered vegetation or caused blockages to the
inlets our outlet systems.

Any holes and or scouring apparent on the filter media will be repaired. Ensure no damage has
occurred to the inlet and outlet systems, if this has occurred repair as required.

5.2.3 Repair of Damage
Any accumulation of an impermeable layer, (such as oily or clayey sediment) that may have
formed on the surface of the filter media will be repaired. A symptom may be that water
remains ponded in the bio-retention basin for more than a few hours after a rain event. Repair
these minor accumulations by raking away any mulch on the surface and scarifying the surface
of the filter media between plants. Any leaf litter should be removed to help maintain the
surface porosity of the filter media.


5.3     Watering
Regular watering of the bio-retention basin vegetation is essential for successful establishment
and healthy growth. The frequency of watering to achieve successful establishment will depend
upon rainfall, maturity of planting stock and the water holding capacity of the soil.

The following watering program should be adequate following the installation of vegetation:

    1. Week 1-2, 3 visits/week

    2. Week 3-6, 2 visits/week

    3. Week 7-12, 1 visit/week

After the first three month period, watering may still be required, particularly during the first
winter (dry period). Irrigation shall be undertaken in consultation with the Landscape Architect.



Bio-Retention Basin Operational Management and Maintenance Guideline

Page 71

                                                                                          Page 6




5.4     Vegetation Management and Weed Control
Conventional surface mulching of the bio-retention basins with organic material like tanbark,
should not be undertaken. Most organic mulch floats and runoff typically causes this material to
be washed away with a risk of blocking drains.

If weeds are observed within the bio-retention basin they shall be removed. Weeding will
generally involve manual removal of the species.

Vegetation planting densities are to be in accordance with the Landscape Architect’s design.
Where necessary a biodegradable erosion mat can be applied the basin batters to help combat
weed invasion and reduce the labour intensive maintenance requirements for weed removal.

Herbicides are not recommended as a means of weed control. If required, however, their
application is to be managed to avoid unintentional destruction of other vegetation or the
introduction of chemicals that may contaminate the stormwater runoff.

Where necessary, in areas that have been extensively weeded, the bio-retention basin shall be
replanted with similar planting densities using suitable native species in accordance with the
Landscape Architects design.

Inspection of the existing vegetation is to take place and any dead or diseased vegetation shall
be removed and replaced with suitable native species in accordance with the Landscape
Architects design.

The removal of plants, dead or diseased vegetation or weeds shall be disposed offsite at an
appropriate waste management facility.

All litter and debris present on the surface or batters of the bio-retention basins shall be
removed and disposed offsite at an appropriate waste management facility.


5.5     Validation Water Quality Testing
Validation water quality testing is not proposed for the site.


5.6     Equipment Needs
The equipment required to undertake regular maintenance to the bio-retention basins will be
standard hand held landscaping tools. No specific mechanical equipment is expected to be
required for the maintenance of the basins unless resetting is required (refer Section 5.11).


5.7     Occupational Health and Safety
The maintenance activities are to be undertaken in accordance with all current occupational
and workplace health and safety legislation, regulations, codes of practice or manufacturers
guidelines.




Bio-Retention Basin Operational Management and Maintenance Guideline

Page 72

                                                                                           Page 7




For maintenance access the shallow nature of the bio-retention systems enables pedestrian
ingress. As noted above no mechanical equipment is required unless resetting is required. The
batter grades are considered to be acceptable and do not pose an occupational health and
safety issue given proper training to maintenance personnel.

The application of pesticides or herbicides in response to any weed outbreak, which cannot be
controlled via manual removal, is to be undertaken by maintenance personnel in accordance
with manufacturer’s guidelines in consultation with the Landscape Architect. Protective
measures are to be implemented so as to minimise exposure to personnel, with personal
protective measures to be the final hierarchical option.


5.8     Public Safety
While maintenance is being undertaken consideration of pedestrians and cyclists is to be made
due to the close proximity of the footpaths. To avoid any safety concerns it is recommended
that temporary warning signs be placed at a sufficient distance to allow pedestrians and cyclists
to become aware of possible maintenance vehicles/personnel when maintenance is being
undertaken.


5.9     Disposal Requirements
The removal of litter and debris, plants, dead or diseased vegetation or weeds are to be
disposed offsite at an appropriate waste management facility.


5.10 Access Issues
Suitable access to the bio-retention basins can be achieved directly from the internal road
network within the site.


5.11 Bio-Retention Basin Resetting
Resetting (i.e. complete reconstruction) of the bio-retention basins will be required if the
system fails to drain adequately after tilling of the surface. Replacement of the filter media is
required when it becomes 50% blocked, which is estimated to occur approximately every 8 to
10 years.

This can be assessed via a review of sediment build up and the time necessary for the system to
drain or by in-situ falling head permeability tests of the filter media.




Bio-Retention Basin Operational Management and Maintenance Guideline

Page 73

                                                                       Page 8




                                              Appendix A


               BIO-RETENTION BASIN MAINTENANCE CHECKLIST




Bio-Retention Basin Operational Management and Maintenance Guideline

Page 74

                                                           23098 - SBSMP/2
                                                                 Page 31




                                             APPENDIX L


                            NSC FLOOD HAZARD OVERLAY MAP




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy

Page 75

Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying   20/09/2023
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
                                                                                                                        1:1129

Page 76

a
Ci

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

rgstrategic.com.au

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.