Original source · versioned page text
Appendix B- SWMP
23098 - SBSMP/2
Page 16
Table 6-6 – MUSIC Parameters
Parameter Data Used
Rainfall Data 40609 ELANORA 1989 to 1998
Modelling Timestep 6 minutes
Routing No routing drain links were adopted
Table 6-7 – Catchment Runoff Generation Parameters
Parameter Residential Catchment
Rainfall Threshold 1
Soil Storage Capacity (mm) 18
Initial Storage Capacity (% capacity) 10
Field Capacity (mm) 80
Infiltration Capacity Coefficient a 243
Infiltration Capacity Coefficient b 0.6
Initial Depth (mm) 50
Daily Recharge Rate (%) 0
Daily Baseflow Rate (%) 31
Daily Deep Seepage Rate (%) 0
6.3.5 MUSIC Modelling Results
Refer to Figure 6.1 for a print screen schematic of the MUSIC model for the proposed development
and Figure 6.2 for the annual pollutant loads that will be discharged from the site for the proposed
development.
Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.