Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix B- SWMP

of 76

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                              23098 - SBSMP/2
                                                                                     Page 19




8 CONCLUSION
The proposed Proposed Townhouse Development at 5 Pearl Street, Cooroy has been assessed for
its impact on the quantity and quality of stormwater drainage.

The lawful point of discharge is the existing Environmental Management and Conservation Area,
northeast of the site.

On-site detention (OSD) is warranted for the proposed development.

Sediment generated during the construction phase shall be dealt with in accordance with an
Erosion and Sediment Control Plan to be kept on site during the construction phase.

The proposed development requires tertiary stormwater quality treatment in accordance with the
requirements of Noosa Shire Council. Rainwater reuse and bioretention end-of-line treatment will
be incorporated into the proposed development to meet the prescribed water quality objectives.

The subject site is unaffected by flooding.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 5 Pearl Street, Cooroy
Log in to download the original file

Appendix B- SWMP.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.