Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                              Acceptable Outcomes                                 Solution1                      Comments                                      Council Use

Stormwater Drainage Design
PO1                                               AO1                                                                RO1
The development and its stormwater                A stormwater management plan is prepared                           The proposal complies. Refer to the
management system is planned and                  consistent with PSP6 Engineering Design                            Site Based Stormwater Management
designed having regard to:                        Standards - Roads, drainage and earthworks.                        Plan (SBSMP) report prepared by
 (a) the natural features of the site;                                                                               MCE.
 (b) the need to avoid impacts and potential
     risks to ecologically important areas;
 (c) the likely effectiveness of erosion and
     sediment control and stormwater                                                                       
     drainage measures during rainfall
     events during and post construction;
     and
 (d) the need to protect environmental
     values and water quality of receiving
     waters both during and post
     construction
PO2                                               AO2.1                                                              RO2.1
Stormwater drainage infrastructure is             Stormwater drainage planning, design and                           The proposal complies. All stormwater
planned, designed and                             construction is in accordance with PSP6                            design will comply with the PSP6
                                                                                                                     Engineering Design Standards –
constructed to:
 (a) incorporate allowance for increased
                                                  Engineering Design Standards - Roads,
                                                  drainage and earthworks and the latest version
                                                                                                                    Roads, drainage and earthworks and
     flood risk and tidal inundation through      of the Queensland Urban Drainage Design                            the latest version of the Queensland
     pipework as a result of cilmate change       Manual.                                                            Urban Drainage Design Manual.
     and sea level rise;                          AO2.2                                                              RO2.2
 (b) ensure the development is adequately         The stormwater drainage system connects to a                       Refer to the SBSMP prepared by
     drained; and                                 lawful point of discharge in accordance with                      MCE for the lawful point of discharge.
 (c) ensure stormwater is managed and             PSP6 Engineering Design Standards - Roads,
     lawfully discharged without altering         drainage and earthworks
     stormwater drainage characteristics          AO2.3                                                              RO2.3
     external to the site.                        Stormwater flows discharging from the                              The proposal complies. Above ground
                                                  development are demonstrated to be                                detention tanks will be utilised to
                                                  consistent with pre-development                                    mitigate flows prior to discharge to the
                                                  characteristics.                                                   legal point of discharge. Refer to the
                                                                                                                     SBSMP prepared by MCE.


1
    Solution:        Acceptable Solution                                                                                                                                                      Page 1 of 10
                A/S   Alternative Solution                                   D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                 Job: 23098
                                                                                                                                                                                                     Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                               22/09/2023
Log in to download the original file

Appendix B- SWMP.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.