Appendix B- SWMP
Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
requirement for specialised equipment,
material or maintenance
techniques.
AO8.3
Vegetated stormwater management systems
to be dedicated as public assets are
established and maintained during the
maintenance period to ensure optimal N/A
vegetated growth and that the functional
elements of the system achieve the design
function at the end of the maintenance period.
PO9 AO9.1 RO9.1
Treatment systems are designed to Free draining inlets and outlets are provided to The proposal complies. The proposal
eliminate or minimise health, safety and ensure that waters do not pond for more than stormwater treatment system will be
aesthetic hazards, including risks associated 24 hours. designed to be free draining.
with insect breeding, odour and public AO9.2 RO9.2
safety. Developments are designed to eliminate The proposal complies. Retaining
retaining walls in excess of 0.8m for any water walls do not exceed 0.8m.
quality treatment device.
Hydraulic and Waterway Stability
PO10 AO10 RO10
Development prevents increased bed and The development is designed to: The proposal complies. Refer to the
bank erosion and (a) limit the peak 1 year ARI event discharge SBSMP prepared by MCE.
sedimentation in receiving waterways by within the receiving waterway to the pre-
avoiding changes in low development peak 1 year discharge;
rate, peak flow run-off and flow duration. (b) maximise pervious areas by using
pervious alternatives for otherwise
impervious areas wherever possible;
(c) provide for capture and reuse of
stormwater for non-potable purposes for
gardening, toilet flushing, laundry and hot
water supply uses;
(d) incorporate appropriate detention features;
and
(e) incorporate natural channel design
1
Solution: Acceptable Solution Page 5 of 10
A/S Alternative Solution D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
N/A Not applicable to this proposal Job: 23098
Rev: 0
Site Address: 5 Pearl Street, Cooroy 22/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.