Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix B- SWMP

of 76

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                               Acceptable Outcomes                                 Solution1                      Comments                                      Council Use

                                                   balances beyond the property boundaries

                                                   Editor's Note— PSP6 Engineering Design
                                                   Standards - Roads, drainage and earthworks
                                                   provides guidance on prepare a groundwater
                                                   recharge and discharge plan.
Construction and establishment of stormwater management systems
PO14                                               AO14.1                                                             RO14.1
Construction methods provide for                   An erosion and sediment control plan prepared                      An Erosion and Sedimentation Control
appropriate controls to avoid entry and            in accordance with the International Erosion                       Plan shall be prepared (prior to
transport of litter, sediment, and associated      Control Association Best Practice Books                            commencement of construction) and
prescribed water contaminants into receiving       demonstrates that the capture and release of                       maintained for the management of the
waters.                                            stormwater achieves the design objectives                          sediment laden stormwater during the
                                                   listed in Table A: Construction phase –                            construction phase in accordance with
Editor's note— Water contaminants are              stormwater management design objectives                            IECAs Best Practice guidelines.
prescribed in the                                  of the State Planning Policy (Appendix 2).               
Environmental Protection Act 1994
                                                   Editor’s note— PSP6 Engineering Design
                                                   Standards - Roads, drainage and earthworks
                                                   provides guidance on requirements for
                                                   preparing an Erosion Management Plan.
                                                   AO14.2                                                             RO14.2
                                                   Construction works are designed and                                Unnecessary disturbance to soil shall
                                                   managed to restrict the extent of clearing and                     be avoided and soil surfaces shall
                                                   soil exposure to the minimum necessary for
                                                   access, and safe construction at any one time
                                                                                                                     remain stabilized.


                                                   AO14.3                                                             RO14.3
                                                   For buildings:                                                     The proposal complies. Refer to
                                                  (a) upstream runoff is diverted around the                          RO14.1.
                                                       construction site;
                                                  (b) sediment barriers are provided downslope
                                                       of disturbed areas to prevent sediment
                                                       washing into gutters, drains and
                                                       waterways , wetlands or drainage lines
                                                       either on or off the site; and

1
    Solution:         Acceptable Solution                                                                                                                                                      Page 8 of 10
                A/S    Alternative Solution                                   D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                 Job: 23098
                                                                                                                                                                                                      Rev:      0
Site Address: 5 Pearl Street, Cooroy                                                                                                                                                                22/09/2023
Log in to download the original file

Appendix B- SWMP.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.