Original source · versioned page text
Appendix B- SWMP
Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
PO16 AO16
On-site effluent treatment and disposal An onsite effluent system and disposal area is:
systems are designed, constructed and (a) not located on a slope greater than 1 in
managed to not compromise the (10%);
environmental values of waters and water (b) not located at or below the 1% annual
quality objectives. exceedance probability (AEP flood event);
(c) not located within a riparian buffer area
mapped on a Biodiversity, Waterways and
Wetlands Overlay Map; and
(d) setback 400 metres minimum from the full
supply level of Lake Macdonald.
Editor’s Note—The Plumbing and Drainage
Act 2003 sets out requirements for on-site N/A
effluent treatment and disposal. The
Queensland Plumbing and Wastewater Code
and associated
guidelines are used to confirm the suitability of
each site to accommodate an on-site
sewerage facility; or where a centrally located
group collection treatment system is proposed,
confirmation as to the suitability of the
designated site to accommodate the onsite
sewerage facility. Additionally, where the
combined total peak design capacity of effluent
treatment is less than 21 equivalent persons,
the design of the system achieves a low to
medium risk classification in accordance with
Seqwater’s Land Use Risk Tool for onsite
sewerage facilities
1
Solution: Acceptable Solution Page 10 of 10
A/S Alternative Solution D:\JOBS\23-Jobs\23098 - 5 Pearl Street, Cooroy\Civil\Reports\SBSMP\Working\Appendices\NSC Water Quality and Drainage Code 2020.docx
N/A Not applicable to this proposal Job: 23098
Rev: 0
Site Address: 5 Pearl Street, Cooroy 22/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.