Appendix B- SWMP
Rational Method Peak Flow Calculations Job No: 23098 MORGAN CONSULTING Job Type: Proposed Townhouse Development ENGINEERS PTY LTD Address: 5 Pearl Street, Cooroy 1 GREAT GEORGE STREET Council: NSC PADDINGTON QLD 4064 IFD Data: 26.4125 (S),152.9125 (E) Minor Storm: Q10 Designed: RC 1 I10 70mm/hr Major Storm: Q100 Checked: HM Pre Development Post Development Time of Concentration Standard Inlet Time Standard Inlet Time Standard Inlet Time mins Standard Inlet Time 5 mins Sheet Flow (Friends Equation) Sheet flow length (L) 64 m Pipe Flow roughness (n) 0.03 short grass Flow distance 68.26 m Pipe Fall of NSL 2.21 m Fall of channel m Slope of Surface (S) 3.5 % Flow Velocity 2.5 m/s total 10.0 mins total 0.5 mins Concentrated Overland Flow Concentrated Overland Flow Flow distance 0 m Flow distance m velocity 0.7 m/s velocity 0.7 m/s mins 0.0 mins mins 0.0 mins Surface type multiplier 3.0 Surface type multiplier 4.0 total 0.0 mins total 0.0 mins Total tc 10.0 mins Total tc 5.5 mins Runoff Volume Calculations Name Area (ha) tc fi C10 Name Area (ha) tc fi C10 0.227 0.24 0.75 0.227 0.74 0.85 Total 0.227 10.0 0.75 Total 0.227 5.5 0.85 Frequency Frequency ARI Cy Iy Qy ARI Cy Iy Qy Factor A (Ha) Factor A (Ha) (years) (Fy*C10) (mm/h) (m3/s) (years) (Fy*C10) (mm/h) (m3/s) (Fy) (Fy) 3 mth 0.018 3 mth 0.025 1 0.800 0.599 97 0.227 0.037 1 0.800 0.679 118 0.227 0.051 2 0.850 0.636 110 0.227 0.044 2 0.850 0.721 133 0.227 0.060 37% 5 0.950 0.711 148 0.227 0.066 5 0.950 0.806 180 0.227 0.092 38% 10 1.000 0.749 172 0.227 0.081 10 1.000 0.848 211 0.227 0.113 39% 20 1.050 0.786 196 0.227 0.097 20 1.050 0.891 241 0.227 0.135 39% 50 1.150 0.861 225 0.227 0.122 50 1.150 0.975 280 0.227 0.172 41% 100 1.200 0.898 247 0.227 0.140 100 1.200 1.000 309 0.227 0.195 39% Page 1 of 1 20/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.