Original source · versioned page text
2015-10-13 Planning & Organisation Agenda Attachment 1 to Item 6 Draft Flying Fox Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn draft
• Disturbance activities must be limited to a maximum of 2.5 hours in any 12 hour
period, preferably at or before sunrise or at sunset.
• Trees are not felled, lopped or have large branches removed when flying-foxes are in
or near to a tree and likely to be harmed.
• The action must be supervised by a person with knowledge and experience relevant
to the management of flying-foxes and their habitat, who can identify dependent
young and is aware of climatic extremes and food stress events. This person must
make an assessment of the relevant conditions and advise the proponent whether
the activity can go ahead consistent with these standards.
• The action must not involve the clearing of all vegetation supporting a nationally-
important flying-fox camp. Sufficient vegetation must be retained to support the
maximum number of flying-foxes ever recorded in the camp of interest.
Flying-fox roost management options ecosure.com.au | 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.