Attachment 3 - 360 Civil Consulting Response to IR
Attached to the e-mail Complete - Response to Info Request MCU17 0563.msg.
"the survey was abandoned - camera travelled downstream about 7m, before
reaching, root mass which camera could not pass. Attempted reverse survey from
other end but unable to access pit."
The report and photos from DrainsKleen of the root mass is attached for council's
information. Further clarification from DrainsKleen regarding the reverse survey was
sought and the DrainsKleen operator who was on site has advised that: -
"I was unable to locate the downstream pit (unsure if downstream pit exists or is just
cut into another pipe). I am also unable to go from one of the neighbour pits on
Thomas Street as I can't go around corners with robot camera due to risk of
damaging equipment."
Since this survey, Council have advised that, in due course, they will unblock the
stormwater pipe and that no further work by this development is required in order
to address this information request item.
Reviewing the photographs provided in the DrainsKleen report the pipe that is visible
appears to be in a reasonable condition.
b) Please refer to the amended 360 Civil Consulting Drawing No. 03 (Rev 3) which
details the 4m wide drainage easement over the existing council stormwater
infrastructure.
Issue
Engineering plan/s is/are required for the details of the driveway grades and levels and
including a 2.0m wide pathway to confirm compliance with the relevant standard drawings
and for operational works construction.
Information Required Item 9
Provide an engineering plan and longitudinal cross section for the access driveway/s and
crossovers that include 2.0m wide pathway and demonstrates compliance with IPWEA
Standard Drawings RS-049 and RS-050 and have grades ensure a standard vehicle (B99),
entering or leaving the site will not scrape or bottom down.
Response to Item 9
Please refer to the amended 360 Civil Consulting Drawing No. 11 and 12 which detail a
driveway long section and relevant cross section drawings incorporating the 2m wide
footpath and compliance with IPWEA Drawings RS-049 and RS-050.
End of Responses to Information Request Items 7, 8 and 9.