       "the survey was abandoned - camera travelled downstream about 7m, before
       reaching, root mass which camera could not pass. Attempted reverse survey from
       other end but unable to access pit."

       The report and photos from DrainsKleen of the root mass is attached for council's
       information. Further clarification from DrainsKleen regarding the reverse survey was
       sought and the DrainsKleen operator who was on site has advised that: -

       "I was unable to locate the downstream pit (unsure if downstream pit exists or is just
       cut into another pipe). I am also unable to go from one of the neighbour pits on
       Thomas Street as I can't go around corners with robot camera due to risk of
       damaging equipment."

       Since this survey, Council have advised that, in due course, they will unblock the
       stormwater pipe and that no further work by this development is required in order
       to address this information request item.

       Reviewing the photographs provided in the DrainsKleen report the pipe that is visible
       appears to be in a reasonable condition.

   b) Please refer to the amended 360 Civil Consulting Drawing No. 03 (Rev 3) which
      details the 4m wide drainage easement over the existing council stormwater
      infrastructure.


Issue
Engineering plan/s is/are required for the details of the driveway grades and levels and
including a 2.0m wide pathway to confirm compliance with the relevant standard drawings
and for operational works construction.

Information Required Item 9
Provide an engineering plan and longitudinal cross section for the access driveway/s and
crossovers that include 2.0m wide pathway and demonstrates compliance with IPWEA
Standard Drawings RS-049 and RS-050 and have grades ensure a standard vehicle (B99),
entering or leaving the site will not scrape or bottom down.

Response to Item 9
Please refer to the amended 360 Civil Consulting Drawing No. 11 and 12 which detail a
driveway long section and relevant cross section drawings incorporating the 2m wide
footpath and compliance with IPWEA Drawings RS-049 and RS-050.

End of Responses to Information Request Items 7, 8 and 9.
Log in to download the original file

Attachment 3 - 360 Civil Consulting Response to IR.PDF · 523 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.