ADG1673.24 Dewatering Management Plan_Rev0_12.07.24

of 41

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                  ADG Consulting Pty Ltd          All Correspondence
                                                                  ACN: 630 555 225                PO Box 6405
                                                                  ABN: 98 630 555 225             Yatala DC QLD 4207


                                                                  P 07 3801 1564
                                                                  E [email protected]
                                                                  W adgconsulting.com.au




  Dewatering Management Plan
  Proposed Residential Development:
  Lot 12 on N10576, 25 Wyuna Drive, Noosaville, Queensland




  July 2024




  Prepared for:
  Sam Tatton
  c/‐ SCG Consulting Engineers



Acid Sulfate Soil Assessment      On‐site Wastewater Management      Contaminated Land Assessment & Remediation
Dewatering Management          Environmental Management Plans     Surface & Groundwater Investigation & Monitoring
Log in to download the original file

ADG1673.24 Dewatering Management Plan_Rev0_12.07.24.pdf · 8.4 MB (large file)

The download may take up to a minute.

Full text of the other 40 pages

Page 2

                                                                                                ADG Consulting Pty Ltd


                                                   Report details



     Project ref:                   ADG1673.24
     ADG Project Contact:           Michael Campbell
     Report title:                  Dewatering Management Plan
                                    Proposed Residential Development:
                                    Lot 12 on N10576, 25 Wyuna Drive, Noosaville, Queensland


     Version:                       Rev0
     Author(s):                     Lilli O’Sullivan & Michael Campbell
     Reviewer:                      Michael Campbell


     Client:                        Sam Tatton
                                    c/‐ SCG Consulting Engineers


     Client contact:                Tom Harrington – SCG Consulting Engineers


     Distribution date:             12 July 2024
     Distributed to:                SCG Consulting Engineers
     Copies:                        1 PDF



     ADG Consulting Pty Ltd




     Lilli O’Sullivan BEnvSc                               Michael Campbell BEnvSc, BSc[Hons],
     Environmental Scientist                               DipProjMgt, DipOHS, DipBusMgt, DipBus(Quality Auditing)
                                                           MEIANZ, MALGA, MASSI
                                                           Director & Principal Environmental Scientist

     Date: 12 July 2024


     This document and all its content is copyright. Apart from fair dealing for the purposes of study, research, criticism
     and/or review as permitted under the Copyright Act 1968, no part of the content may be reproduced, reused or
     redistributed without the prior written permission of ADG Consulting Pty Ltd.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                                  Page ii

Page 3

                                                                              ADG Consulting Pty Ltd


                                                       Table of Contents
1        INTRODUCTION                                                                            1
1.1      PROPOSED DEVELOPMENT                                                                    1
1.2      RELEVANT GUIDELINES                                                                     1
1.3      GENERAL ENVIRONMENTAL DUTY                                                              1
1.4      DMP OBJECTIVES                                                                          2
1.5      SCOPE OF WORK                                                                           2
2        SITE CHARACTERISTICS                                                                    3
2.1      PROPERTY DESCRIPTION                                                                    3
2.2      SURROUNDING ENVIRONMENT                                                                 3
2.3      TOPOGRAPHY                                                                              3
2.4      GEOLOGY & SOILS                                                                         3
2.5      HYDROGEOLOGY                                                                            3
3        PREVIOUS INVESTIGATIONS                                                                 4
3.1      PTG CONSULTING 2024                                                                     4
3.1.1    SOILS                                                                                   4
3.1.2    GROUNDWATER                                                                             4
3.2      GROUNDWATER QUALITY                                                                     4
4        WATER QUALITY OBJECTIVES                                                                6
4.1      RECEIVING ENVIRONMENT                                                                   6
4.2      DEVELOPMENT OF WATER QUALITY OBJECTIVES                                                 6
4.3      PROPOSED WATER QUALITY OBJECTIVES                                                       7
5        DEWATERING METHODOLOGY                                                                  10
5.1      BASEMENT EXCAVATION AND SHORING                                                         10
5.2      GROUNDWATER EXTRACTION                                                                  10
5.3      EXTRACTION/DISCHARGE RATES AND VOLUME                                                   10
5.3.1    DEWATERING EXTRACTION CALCULATION BASED ON SUBSURFACE SOIL PROFILE                      10
5.4      DEWATERING DURATION                                                                     11
5.5      GROUNDWATER DRAWDOWN                                                                    11
5.6      GROUNDWATER TREATMENT                                                                   12
5.7      NOMINATED HOLD POINTS                                                                   12
6        WATER QUALITY MANAGEMENT                                                                13
6.1      RESPONSIBILITY                                                                          13
6.2      OPERATIONAL POLICY                                                                      13
6.3      PERFORMANCE CRITERIA                                                                    13
6.4      IMPLEMENTATION STRATEGY                                                                 13
6.4.1    GROUNDWATER TREATMENT SYSTEMS                                                           13
6.4.2    DEWATERING STRATEGY                                                                     14
6.4.3    INITIAL PUMP‐OUT                                                                        14
6.5      MONITORING                                                                              14
6.5.1    VISUAL MONITORING                                                                       14
6.5.2    WATER QUALITY MONITORING                                                                14
6.5.3    MONITORING RESPONSIBILITIES                                                             15
6.6      MAINTENANCE                                                                             16
6.7      REPORTING                                                                               16
6.8      CONTINGENCIES                                                                           17
7        NOISE & ODOUR MANAGEMENT                                                                18
7.1      RESPONSIBILITY                                                                          18
7.2      OPERATIONAL POLICY                                                                      18
7.3      PERFORMANCE CRITERIA                                                                    18
7.4      IMPLEMENTATION STRATEGY                                                                 18
7.4.1    NOISE                                                                                   18
7.4.2    ODOUR                                                                                   18
7.5      MONITORING                                                                              18


    ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                       Page iii

Page 4

                                                          ADG Consulting Pty Ltd


7.6      REPORTING                                                           19
7.7      CONTINGENCIES                                                       19
8        LIMITATIONS                                                         20
9        REFERENCES                                                          21
APPENDIX A: FIGURES
APPENDIX B: DRDMW LICENCED BORE SEARCH
APPENDIX C: OPERATIONAL WORKS ‐ DRAWING 0282 ‐OW3.1
APPENDIX D: DEWATERING CALCULATION OUTPUT




    ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                   Page iv

Page 5

                                                                                          ADG Consulting Pty Ltd


1    Introduction
     ADG Consulting Pty Ltd (ADG) was engaged by Sam Tatton care of SCG Consulting Engineers (SCG) to
     prepare a Dewatering Management Plan (DMP) for the proposed residential development within
     property described as Lot 12 on N10576, situated at 25 Wyuna Drive, Noosaville, Queensland.
1.1 Proposed development
     The proposed development comprises the construction of a two‐storey residential dwelling over a single‐
     level in‐ground basement on the 641 m2 site. Supplied information indicates that excavations to facilitate
     the basement construction will extend to a maximum of approximately 3.0 m below ground level (bgl) to
     approximately ‐0.5 m Australian Height Datum (AHD; assuming local existing surface levels of around 2.5
     to 2.7 m AHD). Localised deeper excavations may be required for the construction of other structural
     elements (i.e. footings and pile caps), where required.

     Groundwater seepage was recorded at a depth of approximately 2.4 mbgl (equating to an approximate
     elevation of approximately 0.3 m AHD), during preliminary geotechnical investigations on the site by
     PTG Consulting in June 2024. Given the sites proximity to the Noosa Inlet/Noosa River and the presence
     of groundwater within the excavation extent, dewatering will be necessary to allow the basement to be
     constructed in dry conditions.
1.2 Relevant guidelines
     The DMP was prepared with reference to the following documents:


          Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2018. Australian and
           New Zealand Governments and Australian state and territory governments (ANZG), Canberra ACT,
           Australia.
          Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2000. Australian and
           New Zealand Environment and Conservation Council and Agriculture and Resource Management
           Council of Australia and New Zealand (ANZECC/ARMCANZ).
          Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Department of Environment
           and Science (DES), Queensland Government.
          Noosa River environmental values and water quality objectives. 2022. Department of Environment
           and Science (DES), Queensland Government.
          Guidelines for Managing Risks in Recreational Water. 2018. Australian Government, National Health
           and Medical Research Council (NHMRC).
          Monitoring and Sampling Manual 2018, Version 2 June 2018. 2018. Department of Environment and
           Science (DES).
          Queensland Water Quality Guidelines 2009, Version 3. 2013. The Department of Environment and
           Heritage Protection (DEHP).
1.3 General environmental duty
     The Environmental Protection Act 1994 describes that all persons in Queensland have a “General
     Environmental Duty” and that “a person must not carry out an activity that causes, or is likely to cause
     environmental harm unless the person takes all reasonable and practicable measures to prevent or
     minimise the harm”.

     The Act requires that appropriate action be taken to report that environmental harm is occurring or has
     the potential to occur, unless the harm is authorised under an environmental protection policy, an
     environmental management program, a development approval, or an environmental protection order.
     This is known as the “Duty to Notify”. Failure to fulfil this duty is an offence and may result in prosecution.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                           Page 1

Page 6

                                                                                    ADG Consulting Pty Ltd


1.4 DMP objectives
     The objectives of the DMP are to:
          Describe the dewatering methodology, groundwater treatment, monitoring and reporting
           procedures to be employed at the site during dewatering activities.
          Provide effective management procedures to prevent environmental harm resulting from the
           discharge of extracted groundwater from the site.
1.5 Scope of work
     To achieve the investigation objectives, the following scope of work was undertaken:


          A desktop study including:
           1. Review of the development proposal and proposed shoring/dewatering designs.
           2. Review of geology and soil maps for the area.
           3. Search of groundwater bores licensed by the Department of Regional Development,
              Manufacturing and Water (DRDMW) within a 200 m radius of the site.
           4. Review of relevant existing reports and groundwater data from the local area.
           5. Review of current aerial photographs of the site and surrounds.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                  Page 2

Page 7

                                                                                          ADG Consulting Pty Ltd


2    Site characteristics
2.1 Property description
     The site is described as Lot 12 on N10576, and is situated at 25 Wyuna Drive, Noosaville, Queensland.
     From recent available aerial mapping (Nearmap), the site contains a multi storey residential dwelling
     planned for demolition and is generally rectangular in shape. The site has a total area of 641 m2. The site
     locality is shown in Figure 1, Appendix A.
2.2 Surrounding environment
     The surrounding environment and land use is described briefly in Table 1.

     Table 1 Surrounding land use and environment

              Direction                                               Environment

                North             Noosa Inlet/Noosa River.

                 East             Residential lots, then Noosa Inlet/Noosa River.

                South             Wyuna Drive, then multiple residential lots.

                West              Residential lots, then Noosa Inlet/Noosa River.


2.3 Topography
     The site and surrounding land is considered to be generally level, with the site gently sloping towards the
     Noosa River to the north with surface elevations ranging between approximately 2.7 m to 2.1 m AHD
     from the southern boundary toward the north of the site.
2.4 Geology & soils
     The surface geology at the site is mapped as being Pleistocene aged sandy mud, muddy sand and minor
     gravel: estuarine channels and banks. The dominant rock type is identified as miscellaneous
     unconsolidated sediments as referenced through detailed surface geology (accessed via Queensland
     Globe online, 10 July 2024).

     The Acid Sulfate Soils (ASS) map 1:100,000 scale categorises the site as ‘SEA’ or ‘Disturbed Land with
     probability of ASS’, indicating that the site is likely to contain acid sulfate soils but the type and depth to
     ASS has not been defined (accessed via Queensland Globe online, 10 July 2024).
2.5 Hydrogeology
     A search of groundwater bores licensed by DRDMW was conducted by ADG on 10 July 2024. The search
     identified no licensed bores within a 200 m radius of the site. A map showing the bore search area is
     provided in Appendix B.

     Based on the local geology and topography, and the site’s proximity to the Noosa River, the inferred
     groundwater flow is to the north. Groundwater beneath the site is likely to be hydraulically connected to
     the river, therefore saline groundwater conditions are anticipated, and additional saltwater intrusion is
     likely to occur during dewatering.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                           Page 3

Page 8

                                                                                         ADG Consulting Pty Ltd


3    Previous investigations
     This DMP is based on site specific information sourced from the following, provided to ADG by
     SCG Consulting Engineers:
             (Preliminary) Geotechnical Investigation, Proposed Residential Development, 25 Wyuna Drive,
              Noosaville. June 2024. PTG Consulting. Ref: PTG/00259 – 0001 – Rev0.
             Operational Works for Residential Development: Earthworks Plan – 25 Wyuna Dr, Noosaville, QLD.
              Drawing set May 2024, SCG 0282‐CD Issue 1, (particularly Drawing 0282 ‐OW3.1). SCG Consulting
              Engineers Pty Ltd (Refer Appendix C).
     It is noted that dilapidation reports for surrounding structures and services are proposed to be
     undertaken prior to commencement of construction and dewatering, however are to be provided to
     Council separately from this DMP.

     A brief discussion of relevant soil and groundwater conditions is provided below.
3.1 PTG Consulting 2024
     A preliminary Geotechnical Investigation and concurrent Acid Sulfate Soils Investigation was undertaken
     at the site in May 2024 (reported June 2024) by PTG Consulting.
3.1.1 Soils
     A total of one (1) borehole (BH1) was drilled on the proposed development footprint to 6.0 mbgl.

     The subsurface profile encountered is generally described as silty sand fill material at the ground surface,
     extending to the depth of 2.6 m. Fill material is underlain by natural sand and silty sand which is initially
     loose, becoming denser with depth, extending to depths ranging between 2.6 m to the 6.0 m termination
     depth.

     Alongside the Geotechnical Investigation (2024), Acid Sulfate Soil (ASS) samples were collected at 0.5 m
     intervals in BH1 to 6.0 m depth. A total of twenty‐four (24) samples were collected for ASS screening and
     four (4) samples were selected for further analysis by the Chromium Reducible Sulfur suite (CRS).

     ADG notes that the testing was limited to one borehole with ASS testing to 6.0 m depth, and PTG reports
     that within part of this depth profile the natural sands are considered to contain potential ASS requiring
     liming at rates of up to 12 kg/tonne. Additionally, on‐site fill material is considered to contain potential
     ASS requiring limiting rates of to 3.6 kg/tonne. All excavated spoil from depths below RL 5 m AHD within
     the excavation footprint will be appropriately neutralised with lime and validated in accordance with
     recommendations by PG in the ASS Investigation Report (PTG, 2024).
3.1.2 Groundwater
     During drilling activities for the Preliminary Geotechnical Investigation, groundwater seepage/inflow was
     encountered at 2.4 m depth below the ground surface (PTG, 2024) (inferred approx. 0.3 m AHD from SCG
     OPW civil drawings).

     It should be noted however, that groundwater depths and ground moisture conditions are affected by
     weather and climatic conditions, tidal variations, surface and subsurface drainage/permeability
     conditions, and human influence and will therefore vary with time. Groundwater levels are expected to
     be similar to the water level in the river to the north, albeit somewhat a dampened response to tidal
     variations.
3.2 Groundwater quality
     No groundwater quality data was obtained by PTG as part of the preliminary geotechnical investigation.
     However, based on numerous groundwater investigations and dewatering monitoring projects that have
     been undertaken by ADG throughout the Noosa Coast Region in recent years, our understanding of the
     groundwater quality in the region is provided below:


ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                         Page 4

Page 9

                                                                                         ADG Consulting Pty Ltd


          Groundwater is generally mildly acidic to neutral, with pH levels ranging from approximately 5.5 to
           6.5 and electrical conductivity ranging from brackish to saline between 2,000 µS/cm to
           48,000 µS/cm. Groundwater pH has the potential to reduce (become more acidic) following
           oxidisation of PASS as dewatering progresses, particularly if re‐wetting of the soils occurs.
          Dissolved oxygen levels in static groundwater typically range from approximately 35 – 40 %
           saturation.
          The groundwater associated with indurated sand strata is moderately to highly turbid as a result of
           staining and organic content.
          Concentrations of dissolved metals are typically below the available marine water trigger values
           (MWTV’s) provided in ANZECC/ARMCANZ (2000) for the receiving waters, however elevated levels
           of aluminium and particularly iron are expected in the untreated groundwater and have the
           potential to increase following oxidisation of PASS as dewatering progresses or as a result of existing
           acidic groundwater conditions.
          Given the location and previous use of the site, groundwater impacts resulting from site
           contamination are not anticipated.
     A groundwater investigation will be undertaken at the commencement of dewatering as described in
     Section 6.5.2 of this report. This assessment will be representative of the groundwater being extracted
     and treated from the entire site, as opposed to localised monitoring well data which is often misleading.
     Based on previous experience with dewatering in the area, ADG expects the groundwater to require
     treatment to increase pH and dissolved oxygen levels, as well as reduce turbidity, suspended sediments
     and dissolved metal concentrations prior to being discharged to the Noosa River.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                         Page 5

Page 10

                                                                                       ADG Consulting Pty Ltd


4    Water quality objectives
4.1 Receiving environment
     It is proposed to discharge extracted groundwater directly over the revetment wall into the Noosa River
     adjacent to site. The exact location of the receiving waters/environment will be confirmed on
     commencement of dewatering.

     The receiving environment in this location identifies as a moderately disturbed, middle estuary
     environment. The following section establishes water quality objectives (WQOs) to ensure that the
     environmental values of the receiving waters are protected and maintained.
4.2 Development of water quality objectives
     WQOs have been developed to support and protect the designated environmental values (EVs) for the
     receiving environment. The WQOs are based on a moderately disturbed level of protection for enclosed
     coastal/lower estuaries. The WQOs have been developed with reference to the following guideline
     documents:
          Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018. (ANZG 2018) The
           selected trigger values apply to moderately disturbed systems to provide a 95% level of species
           protection for marine waters.
          Environmental Protection (Water & Wetland Biodiversity) Policy 2019. 2019. Queensland
           Government.
          Noosa River environmental values and water quality objectives. 2022. DES.
          Queensland Water Quality Guidelines, Version 3, September 2009. 2013. DEHP.


     The Australian and New Zealand Guidelines for Fresh and Marine Water Quality by the Australian and
     New Zealand Environment and Conservation Council and Agriculture and Resource Management Council
     of Australia and New Zealand (ANZECC/ARMCANZ, 2000), has undergone review, with the publication of
     the 2018 version. The revised Australian and New Zealand Guidelines for Fresh and Marine Water Quality
     2018 is a joint initiative between the Australian and New Zealand Governments and Australian state and
     territory governments (ANZG, 2018) and supersedes the ANZECC/ARMCANZ 2000 publication. Where
     ANZECC/ARMCANZ (2000) is referenced, the relevant sections are still relevant and consistent with the
     updated ANZG 2018 publication, as referenced in the ANZG 2018 publication.

     The Queensland Water Quality Guidelines 2009 (DEHP, 2013) was made pursuant to the provisions of the
     Environmental Protection (Water) Policy 1999, now the Environmental Protection (Water & Wetland
     Biodiversity) Policy 2019 (the EPP(Water)), which is a subordinate legislation under the Environmental
     Protection Act 1994 and was developed as the State response to the ANZECC/ARMCANZ (2000)
     Guidelines. The EPP(Water) provides a framework for:


          Identifying environmental values for Queensland waters, and deciding the water quality objectives
           to protect or enhance those environmental values.
          Including the identified environmental values and water quality objectives under Schedule 1 of the
           EPP (Water).
     WQOs are long term goals for surface water quality management. They are indicators established for
     receiving waters to support and protect the designated Environmental Values (EVs) for those waters. DES
     (2022) describes that for slightly to moderately disturbed waters, the guideline values should be
     compared with the median of values at a test site, whilst ANZG (2018) stresses that the aquatic ecosystem
     guideline values are triggers to further action, are inherently conservative, and that the response to non‐
     compliance should match the magnitude and impacts (if any) of the exceedance.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                       Page 6

Page 11

                                                                                                      ADG Consulting Pty Ltd


     Regardless of the WQOs adopted in this DMP, the General Environmental Duty set out in the EP Act is
     paramount, which requires that “a person must not carry out an activity that causes or is likely to cause
     environmental harm unless the person takes all reasonable and practicable measures to prevent or
     minimise the harm”.
4.3 Proposed water quality objectives
     The proposed water quality objectives that have been developed for the discharge of extracted
     groundwater from the site are provided in the Tables below. All water discharged from the site must
     comply with the discharge criteria provided in Table 2. In addition, the receiving water quality within a
     20 m radius of the discharge point entry to the receiving water shall comply with the receiving water
     criteria provided in Table 3. Receiving waters data will be assessed against background monitoring data
     if non‐compliant results are obtained at the receiving waters monitoring location.

     Table 2 Discharge criteria

                              Parameter                                                       Criteria

       Physico‐chemical
       pH (pH units)                                                                        6.5 – 8.51
       Dissolved oxygen (% saturation)                                                         ≥802
       Suspended solids (mg/L)                                                                 ≤501,2
       Turbidity (NTU)                                                                         ≤502
       Litter                                                                              None visible
       Totals metals (µg/L)
       Aluminium                                                                       No ANZG criteria / 2003

       Iron                                                                            No ANZG criteria / 3003

     Table notes:
     1. QWQG 2009 (2013) Refer to Table 8.2.1. Summary of design objectives for management of stormwater quality and flow –
        construction phase of development in Queensland.
     2. Typical discharge criteria recognised throughout Queensland & NSW.
     3. Criteria subject to anticipated Development Application (DA) notice and conditions by Noosa Shire Council.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                                       Page 7

Page 12

                                                                                                             ADG Consulting Pty Ltd


     Table 3 Receiving waters criteria

                               Parameter                                                           Criteria

       Physico‐chemical
       pH (pH units)                                                                              7.5 – 8.11
       Dissolved oxygen (% saturation)                                                            85 – 1051
       Suspended solids (mg/L)                                                                       ≤161
       Turbidity (NTU)                                                                               ≤131
       Dissolved metals (µg/L)
       Aluminium                                                                       No relevant ANZG criteria available

       Arsenic                                                                                       2.32*
       Cadmium                                                                                       5.52
       Chromium                                                                                      4.42
       Copper                                                                                        1.32
       Iron                                                                            No relevant ANZG criteria available

       Lead                                                                                          4.42
       Nickel                                                                                         702
       Zinc                                                                                            82
       Mercury                                                                                       0.42
       Totals metals (µg/L)
       Aluminium                                                                            No ANZG criteria / 2003

       Iron                                                                                 No ANZG criteria / 3003

     Table notes:
     1. DES (2022). Noosa River environmental values and water quality objectives (middle estuary waters) – Weyba Creek.
     2. ANZG (2018). Supersedes ANZECC/ARMCANZ (2000) ‐ Marine water trigger values for 95% species protection.
     3. Criteria subject to expected condition in Development Application (DA) notice by Noosa Shire Council.
     * = Insufficient data to derive a reliable trigger value. Low reliability value adopted (refer ANZECC/ARMCANZ (2000) Section
     8.3.7.

     Although ADG has not been provided a copy of the DA notice and conditions for the proposed
     development, based on previous dewatering projects in the Sunshine/Noosa Coast Region it is expected
     that total iron and aluminium concentrations as listed in Table 3 (above) are likely to be conditioned by
     Noosa Shire Council for compliance. It should be noted that these concentrations are considered to be
     onerous with respect to the risk‐based (worst‐case) bioavailable trigger value criteria contained in ANZG
     2018 & ANZECC/ARMCANZ (2000) for marine water (moderately disturbed) 95% species protection, and
     are likely to be difficult to achieve given the groundwater conditions encountered in the locality on
     previous dewatering projects on the Sunshine/Noosa Coast.

     Prior to discharge to the stormwater system or any waterway, discharges are to be tested to meet the
     requirements of the ANZG 2018 & ANZECC/ARMCANZ (2000) Guidelines for Fresh and Marine Water
     Quality. There is currently no chemical toxicant trigger value criteria available for total or dissolved (i.e.
     bioavailable) concentrations of aluminium or iron for marine or estuarine waters under the Australian
     and New Zealand Guidelines for Fresh and Marine Water Quality Guidelines (ANZG 2018 &
     ANZECC/ARMCANZ 2000 – i.e. ANZECC Guidelines) or the Guidelines for Managing Risks in Recreational
     Waters (NHMRC 2008), with regards to managing environmental impacts to the waterway.

     In addition, Section 5 (Guidelines for recreational water quality and aesthetics) of the ANZECC/ARMCANZ
     (2000) Guidelines (per section 5.2 thereof) was superseded by the Guidelines for Managing Risks in
     Recreational Water in 2008 (NHMRC, 2008). Therefore, a reference to the ANZECC/ARMCANZ (2000)
     Guidelines is by association and extension a reference to the current 2008 NHMRC Guidelines. The 2008
     NHMRC Guidelines contain no criteria for aluminium, and only includes an aesthetic criterion for iron –
     noting this is an aesthetic criterion derived from the Australian Drinking Water Guidelines on the basis of


ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                                                 Page 8

Page 13

                                                                                     ADG Consulting Pty Ltd


     ingesting 2L of the recreational water solution per day. ANZECC/ARMCANZ (2000) Section 5.2.3.3, notes
     that as a general guideline, under Toxic Chemicals, ‘Higher concentrations of toxicants may be tolerated
     occasionally if it assumed that no person will ingest more than a maximum of 100 mL water during a
     normal swimming session (NHMRC 1990) compared with 2L/d for potable water’, and Section 3.1.1.3,
     under Risk based approach of the guidelines, ‘The guideline trigger values are based on bioavailable
     concentrations, and hence are relatively conservative when compared with total concentrations in the
     field, so the use of the decision frameworks will increase guideline concentrations in most cases’.
     Therefore, any chemical toxicant trigger values would require reassessment and likely increase upwards
     of any ANZG 2018 &/or ANZECC/ARMCANZ (2000) Guideline trigger values due to the slightly to
     moderately disturbed nature (and thereby reduced sensitivity) of the receiving waters.

     In conditioning more onerous criteria, rather than the available marine chemical toxicant trigger value
     criteria contained within the ANZG/ANZECC Guidelines, an unachievable constraint may be placed on the
     development. This DMP has allowed for contingency measures to be incorporated into the treatment
     and discharge system if required, including silt curtains to be installed within the receiving waterway
     surrounding the discharge location, or further onsite treatment measures such as filtration, to prevent
     and/or minimise as far as reasonably practicable the potential for release of suspended solid loads into
     the broader receiving waterway.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                    Page 9

Page 14

                                                                                      ADG Consulting Pty Ltd


5    Dewatering methodology
5.1 Basement excavation and shoring
     It is understood that the excavation/basement perimeter will be stabilised along the perimeter of the
     basement excavations using a contiguous secant pile wall (refer to supplied indicative basement shoring
     design at Appendix C). Excavations to facilitate the construction of the basement will extend to
     approximately 3.0 m below ground level (bgl) to approximately ‐0.5 m Australian Height Datum (AHD;
     assuming local existing surface levels of around 2.5 to 2.7 m AHD). Localised deeper excavations may be
     required for construction of other structural elements (i.e. footings & pile caps).

     Groundwater seepage was recorded at a depth of approximately 2.4 mbgl (equating to an approximate
     elevation of approximately 0.3 m AHD), during preliminary geotechnical investigations on the site by
     PTG Consulting in June 2024. All excavated spoil from within the excavation footprint will be
     appropriately neutralised with lime and validated in accordance with recommendations by PTG
     Consulting in the Preliminary Geotechnical Investigation Report (PTG, 2024).

     It is expected that the development will include a ‘tanked’ basement to prevent the requirement for a
     permanent dewatering facility at the site.
5.2 Groundwater extraction
     Dewatering is anticipated to be undertaken using a series of 6.0 m length, 40 mm diameter PVC spears
     installed to below maximum excavation depth at 1.5 m intervals around the internal and external
     perimeter of the basement excavation (refer to supplied indicative shoring design at Appendix C).

     The basement excavation must be dewatered to a minimum of approximately 1.0 m below the deepest
     point of excavation to allow construction to be undertaken in dry conditions. The water table is therefore
     expected to be lowered by a minimum of approximately 1.8 m to around ‐1.9 m AHD. It is expected that
     the cone of depression in the standing groundwater table will be predominantly limited to within the site
     boundaries.

     It is proposed that the development will include a ‘tanked’ basement to prevent the requirement for a
     permanent dewatering facility at the site. Similarly, no permanent groundwater dewatering is proposed
     or likely to occur as a result of the development, with all services and pipework proposed to be situated
     above standing groundwater elevations (that is, at elevations above 0.6 mAHD) and subject to the
     nominated hold points at Section 5.7. Where any deviation is proposed from this arrangement, all
     pipework within the saturated zone, that outlets direct to waterways must be fitted with buried
     headstocks at suitable intervals to prevent ongoing dewatering of groundwater along pipework bedding.
5.3 Extraction/discharge rates and volume
5.3.1 Dewatering extraction calculation based on subsurface soil profile
     The dewatering extraction rate, area of influence and cone of depression has been estimated using the
     Western Australian Department of Water and Environmental Regulation Cone of Depression Calculator.

     The calculation results are based on the following parameters (as provided by SCG) and known site‐
     specific conditions. The following is applicable to the basement excavations spanning across the lot:

           Approximate length of excavation = 20 m
           Approximate width of excavation = 18 m
           Reduction in depth of groundwater across the basement footprint/excavation = 1.8 m
           Approximate depth of saturated aquifer = 10 m (standardised conservative value applied)

     The soil profile of comprised predominantly of fine to medium grained silty sands, which has a hydraulic
     conductivity of 8.2 m/day, or equivalent 0.0000949 L/sec (WA Calculator). The results of the calculation
     are shown in Table 4 below, and a copy of the output is provided in Appendix D.



ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                     Page 10

Page 15

                                                                                            ADG Consulting Pty Ltd



     Table 4 Dewatering extraction rate results

                               Output                                                Result

      Effective radius of dewatering spears (m)                                        11
      Dewatering radius of influence (m)                                               53
      Discharge rate (L/sec)                                                            6
      Discharge rate (L/hr)                                                          21,600
      Establishment of cone of depression (hours)                                      44


     Based on the above inputs, a groundwater flow rate of approximately 6 L/sec or 360 L/min or 21,600 L/hr
     has been predicted for the development, with the estimated cone of depression radius to be
     predominantly limited to within 3 m of the secant pile shoring wall. Flow rates are predicted to be highest
     during initial drawdown of the groundwater table within the basement excavation footprint, and
     reducing to approximately 5 L/sec following establishment of the cone of depression within the
     excavation. Flow rates may fluctuate due to tidal variations, generally approximately ± 0.5 m, and will
     also be influenced by rainfall and surface water collection within the basement excavation footprint
     noting the underlying predominantly sand profile encountered during geotechnical investigations.

     Regardless of the contractor employed, groundwater treatment systems should be installed with
     capability for treating flow rates of up to 8 to 10 L/sec, as a contingency against higher than anticipated
     flow rates exceeding the estimated 6 L/sec as a result of varying ground conditions across the extent of
     excavation.

     However, it should be noted that the WA Calculator provides a conservative assessment of inflows to an
     excavation footprint based on area and depth but does not take account of the method of perimeter
     piling i.e. steel sheet pile, which will inhibit lateral inflows. Also note that the cone of depression radius
     measure includes water table depressions of 1 mm depth or more, so any significant depression of the
     water table is limited to much closer to the spear point dewatering spears (generally within 3 to 10 m
     from the shoring wall in fine‐medium grained sands, depending on density of the strata).
5.4 Dewatering duration
     Dewatering will be necessary throughout the basement construction phase, which is expected to require
     dewatering for approximately 8 to 12 weeks. To minimise the potential impacts during construction of
     short‐term dewatering, periods of active dewatering will be minimised as much as possible. However,
     ADG notes that once active dewatering has commenced, dewatering will not be able to be ceased until
     both: a) the basement hydrostatic uplift forces have been compensated to the satisfaction of the
     consulting RPEQ engineer; and b) potential hydraulic loading on the external face of the sheet pile shoring
     system has been compensated to the satisfaction of the consulting RPEQ engineer and shoring
     contractor.
5.5 Groundwater drawdown
     Groundwater drawdown caused by dewatering has the potential to create settlement in unconsolidated
     sediments and loose sands. It is noted that dilapidation reports for surrounding structures and services
     have been undertaken which were not supplied to ADG for the purposes of preparing this DMP, and are
     to be provided to Council separately from this DMP.

     Groundwater drawdown may also oxidise potential acid sulfate soils within the cone of depression,
     subsequently producing acidic groundwater conditions and mobilising heavy metals. Monitoring of the
     extracted untreated groundwater will be undertaken to detect potential in‐situ oxidation, as required
     and at the frequencies stated in Section 6.5.2. Groundwater monitoring bores for groundwater level
     gauging external to the excavation footprint are unable to be established and monitored prior to and
     during construction on the site, due to limited space (SCG Consulting Engineers).


ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                         Page 11

Page 16

                                                                                      ADG Consulting Pty Ltd



     A plan showing the proposed shoring and dewatering system is provided at Appendix C.
5.6 Groundwater treatment
     All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
     stormwater network. The following treatment measures (or similar depending on final dewatering
     contractor selection) will be adopted, and will be installed and operational prior to the commencement
     of dewatering:

     1.    A groundwater pH buffering treatment system (primary treatment)
     2.    A sedimentation tank to provide additional residence time and sedimentation (secondary
           treatment).
     3.    Installation of fine media filtration to retain suspended sediments and/or heavy metals (tertiary
           treatment), if required.

     Details of the treatment systems and methodologies are provided in Section 6 of this report.

     Note: Consideration should be taken, regarding placement of treatment gear on site to enable easy
     cleaning and maintenance throughout the dewatering phase for the project. Consider the potential
     requirement for regular de‐sludging of sedimentation tank/s to suitable area onsite, if available (cost
     minimisation).
5.7 Nominated Hold Points
     In accordance with anticipated DA Conditions, nominated hold points to be enacted during construction
     have been proposed to facilitate for certification by the suitably qualified person experienced with Acid
     Sulfate Soils, as well as Council Development Engineer to ensure all possible avenues for continual
     dewatering below permanent groundwater level, including around pipework bedding that outlet to
     waterways, are appropriately sealed. The nominated hold points regarding dewatering for this project
     are:
     1. Prior to commencement of dewatering/initial pump out
     2. At finished excavation level, prior to blinding layer application
     3. External to basement service installation trench opening/s prior to backfilling.

     The above nominated hold points are subject to confirmation by the consulting engineer, and liaison with
     council representatives and the Site Manager.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                    Page 12

Page 17

                                                                                        ADG Consulting Pty Ltd


6    Water quality management
6.1 Responsibility
     The Site Manager is ultimately responsible for implementing the water quality management procedures
     described in this DMP.
6.2 Operational policy
     To prevent impacts on the receiving waters by effectively treating all extracted groundwater prior to
     discharge from the site.
6.3 Performance criteria
     The performance criteria for the discharge of extracted groundwater are the water quality objectives
     provided in Table 2 and Table 3 in Section 4 of this report. Both the discharge and receiving waters (within
     a 20 m radius of the stormwater discharge point) will be assessed against the WQOs to ensure that the
     environmental values of the waterway are maintained. Receiving waters data will also be assessed
     against background monitoring data if non‐compliant results are obtained at the receiving waters
     monitoring location.
6.4 Implementation strategy
     All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
     stormwater network. The treatment system described in Section 6.4.1 will be adopted, installed and
     operational prior to the commencement of dewatering.
6.4.1 Groundwater treatment systems
     Subject to final appointment of shoring and dewatering contractors (who all generally have different
     treatment systems), the following treatment systems are generally proposed for dewatered groundwater
     treatment prior to discharge. Regardless of the contractor employed, groundwater treatment systems
     should be installed with capability for treating flow rates of up to 8 to 10 L/sec, as a contingency against
     higher than anticipated flow rates exceeding the estimated 6 L/sec as a result of varying ground conditions
     across the extent of excavation.

     Primary treatment
     A groundwater treatment system will be installed to provide primary treatment of the extracted
     groundwater. The system will provide the following capabilities:

     1.    A baffled treatment tank with 5 kL minimum capacity
     2.    Automated in‐line chemical dosing systems for the addition of buffering solutions and coagulants
     3.    A filtration system to reduce fine particulates (if required)
     4.    Emergency response alarms for non‐routine situations.

     Based on the estimated extraction rate, this system will provide approximately thirteen minutes contact
     time during the initial chemical dosing, prior to secondary treatment using a sedimentation tank. Primary
     treatment tank will be vertically stacked on the secondary treatment tank wherever practicable to
     minimise site area required for groundwater treatment equipment.
     Secondary treatment
     A 23 kL sedimentation tank will be utilised to provide the necessary residence time for secondary
     treatment of the groundwater prior to discharge to the stormwater system. Based on the estimated
     groundwater extraction rate of approximately 21,600 L/hr (equivalent 360 L/min) from Section 5.3.1 of
     this Report, one sedimentation tank will provide approximately sixty‐three minutes retention time
     following primary treatment of the extracted groundwater. This is considered to be sufficient secondary
     settling / retention time based on extensive prior experience on other sites in similar ground conditions.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                       Page 13

Page 18

                                                                                          ADG Consulting Pty Ltd


     Tertiary treatment – may be required following initial testing of extracted groundwater.
     A filtration treatment system with specialised fine filtration media and chlorine dosing will be utilised to
     provide the required heavy metal removal (specifically for total and dissolved iron) where not
     precipitated and retained within the sedimentation tank/s (secondary treatment). This treatment system
     will provide tertiary treatment of the groundwater prior to offsite discharge. This type of fine media
     filtration treatment system is a forced‐flow system under pressure, and generally capable of treating flow
     rates of up to 20 L/sec per filtration unit (therefore residence time is inconsequential to treatment quality
     achieved).

     Tertiary treatment will only be required if the required water quality is unable to be achieved following
     primary and secondary stages of treatment. Subject to the results of field and laboratory testing during
     the pre‐discharge monitoring event.
6.4.2 Dewatering strategy
     The Site Manager, Dewatering Contractor and ADG Consulting must formulate a dewatering strategy to
     ensure that the dewatering treatment system is sufficient to meet the requirements of the project and
     that the necessary equipment can be accommodated within the site prior to the commencement of
     dewatering.

     Where the construction of the proposed development requires occupation of the road reserve (verge
     area and/or road formation) for either short term or long term, a road reserve permit must be obtained
     from Council prior to any occupation of the road reserve.
6.4.3 Initial pump‐out
     Prior to discharge of any extracted groundwater to the canal system, the following pre‐dewatering
     procedure will be undertaken:

     1. The basement area will be excavated down to the standing groundwater level.
     2. The initial dewatering discharge will be directed (via the treatment systems) into the excavation and
        allowed to infiltrate/recharge the aquifer. This process will provide initial clarification of the extracted
        groundwater as disturbed sediment loads are typically reduced following the initial pump‐out.
     3. Samples of the treated groundwater will be recovered and analysed for the parameters detailed in
        Table 2 and Table 3.
     4. The extracted groundwater will be directed into the canal system following confirmation that the
        water quality complies with the discharge criteria.
6.5 Monitoring
6.5.1 Visual monitoring
     Visual inspections of the site and dewatering equipment shall be undertaken daily by the Site Manager
     to identify the following:
          Quantity of chemical product within the dosing system
          Effective operation of all dewatering treatment equipment
          Short circuiting of water around baffles and filter media in sediment tanks, where required to be
           installed.
          Visible hydrocarbon sheens and odours
          Green blue or extremely clear water indicating high levels of dissolved aluminium.
6.5.2 Water quality monitoring
     Water quality monitoring will be undertaken for the duration of dewatering activities at the site by a
     suitably qualified and independent person. The monitoring will include analysis of the extracted
     groundwater, treated discharge water and off‐site monitoring in the receiving waters (in the mixing zone
     within a 20 m radius of the discharge point). The exact location within the receiving waterway (Noosa


ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                          Page 14

Page 19

                                                                                       ADG Consulting Pty Ltd


     River) is to be confirmed, however it is anticipated to be directly north of the site. Background water
     quality monitoring of field parameters will also be conducted during each sampling event, if applicable.
     Background samples will be recovered from the river, either upstream or downstream from the receiving
     water location (tide dependant).

     The proposed monitoring locations are shown in Figure 1, Appendix A are a subject to confirmation
     following mobilisation of dewatering gear to site.

     Monitoring will be undertaken at the following frequencies:


          Daily monitoring of field parameters (pH, electrical conductivity, dissolved oxygen, temperature and
           turbidity) in the treated discharge water and pH of the untreated extracted groundwater (to
           determine potential acidification). Daily monitoring will be undertaken by a suitably trained site
           employee under the supervision of the Site Manager.
          Weekly monitoring of field parameters (pH, electrical conductivity, dissolved oxygen, temperature
           and turbidity) in the untreated extracted groundwater, treated discharge water, receiving waters
           and background waters by ADG Consulting.
          Weekly laboratory analysis of treated discharge water and receiving waters for suspended solids
           and dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium, copper, iron, lead,
           nickel, zinc and mercury). Total aluminium and iron will also be analysed for, if required.
          Pre‐discharge/initial monitoring of field parameters (pH, electrical conductivity, dissolved oxygen
           and oxidation‐reduction potential) in the extracted groundwater (prior to treatment) to assess
           changes in groundwater chemistry associated with PASS oxidation.
          Pre‐discharge/initial laboratory analysis of extracted groundwater (prior to treatment) for
           suspended solids, dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium,
           copper, iron, lead, nickel, zinc and mercury) and for soluble sulfate and chloride to assess changes
           in groundwater chemistry associated with PASS oxidation. Total aluminium and iron will also be
           analysed, if required.
          Laboratory analysis of untreated groundwater would also be performed periodically (monthly) if
           changes in untreated groundwater pH levels are detected that may indicate local acidification, and
           to determine any changes in local groundwaters that may require further investigation of potential
           environmental impacts.
     All samples will be recovered by a suitably qualified Environmental Scientist and submitted to a National
     Association of Testing Authorities (NATA) accredited laboratory for analysis.
6.5.3 Monitoring responsibilities
     The persons responsible for undertaking the compliance monitoring described in Section 6.5.2 above are
     shown in Table 5.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                     Page 15

Page 20

                                                                                           ADG Consulting Pty Ltd


     Table 5 Monitoring responsibilities

                           Activity                          Frequency          Responsibility        Person

       Monitoring of field parameters in discharge water
                                                                 Daily           Site Manager      Site Manager
       and untreated extracted groundwater

       Monitoring of field parameters in untreated
                                                                                                  Environmental
       extracted groundwater, discharge water,                 Weekly           ADG Consulting
                                                                                                    Consultant
       receiving waters and background waters

       Laboratory analysis of samples recovered from                                              Environmental
                                                               Weekly           ADG Consulting
       discharge water and receiving waters                                                         Consultant

       Monitoring of field parameters in extracted                                                Environmental
                                                               Weekly           ADG Consulting
       groundwater (pre‐treated)                                                                    Consultant

       Laboratory analysis of samples recovered from       Initially, then as                     Environmental
                                                                                ADG Consulting
       extracted groundwater (pre‐treated)                     required                             Consultant

6.6 Maintenance
     The groundwater treatment systems must be regularly maintained. Maintenance must include:


          Regular cleaning and or replacement of the filters within the filtration unit, where required to be
           installed.
          Regular removal of sediment from the sedimentation tank. The sediment must be either returned
           to the excavation pit for dewatering and bulking out with excavated material, or removed from the
           site by a licensed liquid waste contractor.
          Regular check of the dosing system and top‐up of buffering solutions and flocculants.
6.7 Reporting
     Dewatering management procedures and monitoring results will be reviewed by ADG Consulting weekly
     to ensure that the treatment procedures are effective, and that the receiving waters are not being
     impacted by the extracted groundwater being discharged.

     The following reporting procedures will be adopted:


          A summary report will be prepared upon completion of the initial pre‐discharge monitoring. The
           report will be submitted to the Site Manager, Dewatering Contractor, and NSC upon request.
          Weekly interim reports will be prepared upon receipt of laboratory data for each round of ongoing
           compliance monitoring. The interim reports will display all data obtained during the previous
           monitoring event, and provide comments and recommendations based on the results.
          A dewatering compliance report will be prepared on completion of the project (upon request).
     The above reports will be prepared by ADG Consulting and provided to the Site Manager and Dewatering
     Contractor as they become available. The reports will include all water quality results and comparison to
     the WQOs, corrective actions and recommendations made to the Site Manager and Dewatering
     Contractor during the monitoring period.

     The Site Manager must keep records of complaints, volumes of chemicals used, and treatment methods
     employed. These records must be available on‐site at all times and submitted to NSC by the Site Manager
     upon request.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                        Page 16

Page 21

                                                                                        ADG Consulting Pty Ltd


6.8 Contingencies
     If water quality monitoring indicates ongoing exceedances of the performance criteria, and the water
     quality objectives for the receiving waters cannot be met, then corrective actions will be adopted as
     necessary. Possible contingencies may include one or more of the following:


          Installation of additional sedimentation tanks to provide increased residence time and assist with
           the retention of precipitated iron hydroxides, other heavy metals and/or suspended sediments.
          Installation of additional flocculant and/or coagulant dosing systems to assist in precipitation of
           suspended sediments and/or heavy metals.
          Installation of activated carbon filtration or other fine media filtration to retain suspended
           sediments and/or heavy metals.
          Install a floating sediment curtain/s around the stormwater termination point in the receiving
           waterway to prevent unsightly plumes and contain sediment and/or heavy metals for periodic
           removal (subject to approval by Noose Shire Council).
          Preventive and corrective actions shall be taken in the event that groundwater monitoring
           observations indicate that unexpected groundwater contamination has been encountered during
           dewatering. The most appropriate action(s) shall be dependent on the stage of construction and
           risk of adverse impacts to groundwater users and the receiving environment.
          Any modification to the dewatering system and pumping rates shall be in consultation with a
           suitably qualified scientist/geotechnical/engineer.
          Following heavy rainfall all ponded surfaces waters are to meet discharge criteria (Table 3) prior to
           offsite discharge. Where discharge criteria not met, Site Manager to obtain approval from
           Dewatering Contractor regarding treating surface waters with treatment gear before offsite
           discharge.
          Pumping systems and shoring works to be maintained in fit for purpose state by Dewatering
           Contractor and/or shoring contractor. In the event that dewatering equipment has failed and is
           likely to cause a significant impact on the environment, or surrounding properties (i.e. flooding) the
           Dewatering Contractor is to be contacted immediately. The Principal Contractor, in consultation
           with the Dewatering Contractor shall be responsible in rectifying the failure in a practicable time
           frame to minimise potential impacts. Equipment, spare parts, materials and tools necessary to
           manage aspects of the system/s which present a high risk of significant impacts in the event of
           failure (if any) shall be readily available.
          Construction vibrations could potentially cause settlement in the loose upper level sands, thereby
           damaging nearby structures founded in these strata. Prior to commencement of construction on
           site (including staged works), it is recommended that a detailed dilapidation survey be undertaken
           to establish the condition of all existing adjacent structures, roads and services.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                       Page 17

Page 22

                                                                                         ADG Consulting Pty Ltd


7    Noise & odour management
7.1 Responsibility
     The Project Manager is responsible for ensuring the appropriate management of noise and odour during
     dewatering operations.
7.2 Operational policy
     To minimise noise and odour emissions generated from the site during dewatering.
7.3 Performance criteria
     The appropriate criteria to measure the performance of dewatering management at the site are provided
     below.
     1.    No noise or odour related complaints received from neighbouring residents or the community.
     2.    No degradation of air quality due to fumes or odours emanating from the dewatering process.
7.4 Implementation strategy
     Noise and odour emissions will be managed as described in the following sections.
7.4.1 Noise
     All dewatering equipment must be operated appropriately and maintained in good working order. All
     dewatering systems and plant must be fitted with the appropriate noise reduction equipment to comply
     with the performance criteria. Non‐complying dewatering plant will be replaced or repaired as necessary.

     It is proposed to employ noise mitigation strategies including use of electric pumps and dewatering
     systems rather than diesel powered equipment. Noise attenuation blankets and screens will be installed
     around noise generating dewatering pumps and equipment where practicable. Noise monitoring
     equipment (unattended) will be installed by the site manager prior to commencement and monitored for
     the duration of dewatering.
7.4.2 Odour
     All dewatering plant must be fitted with the appropriate emission reduction devices. Where practicable,
     all dewatering plant will be sealed to prevent the release of odours to the atmosphere. Fine mist odour
     control sprays will be applied to reduce offensive odours if complaints are received from neighbouring
     residents.
7.5 Monitoring
     An inspection of the site and dewatering equipment shall be undertaken daily by the Site Manager to
     identify the following:
          Excessive noise being generated by the dewatering systems and plant; and
          Strong or offensive odours being generated by the dewatering equipment and/or extracted
           groundwater.
     If required by Council, noise monitoring equipment (unattended, continuous logging) is proposed to be
     installed by the Site Manager prior to commencement and monitored for the duration of dewatering.
     The Environmental Protection (Noise) Policy 2019 (EPP(Noise)) identifies specific acoustic quality
     objectives (noise criteria) to assist in preventing significant impacts on noise sensitive receptors and as a
     guide to long‐term acoustic quality for sensitive receptors. The primary EPP(Noise) criteria relevant to
     this investigation is outside a dwelling (i.e. adjacent dwellings), which should not have noise at levels in
     the daytime or evenings greater than 50dB(A) LAeq, adj,1hr. This means that noise levels in the receiving
     environment outside of nearby dwellings (i.e. on balconies) should not exceed an equivalent sound
     energy as would be received from a one hour continuous sound of 50 decibels on the A‐weighted scale
     (adjusted for tonal character perceptible by the human ear).




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                        Page 18

Page 23

                                                                                      ADG Consulting Pty Ltd


     While this report has not been generated for the purpose of assessing compliance with the requirements
     of workplace health and safety legislation, it is noted that a person conducting a business or undertaking
     must ensure that workers are not exposed to noise that exceeds the exposure standard for noise. The
     exposure standard for noise is defined in the Work Health & Safety Regulation 2011 (QLD) as LAeq,8h of
     85 dB(A) or an LC,peak of 140 dB(C). As such, it is considered appropriate to adopt these exposure
     standards to assess average and peak noise generated at the site with the potential to affect exposure
     levels of nearby sensitive receptors (noting there will be some attenuation between source and receptors
     and actual noise experienced by receptors would need to be measured at the receptor location).
7.6 Reporting
     The Site Manager must keep records of complaints, monitoring records (including continuous noise
     monitoring data), and corrective and preventive actions/methods employed for noise abatement. These
     records must be available on‐site at all times and submitted to NSC by the Site Manager upon request.
7.7 Contingencies
     If noise levels consistently exceed the performance criteria, temporary acoustic barriers will be
     constructed around the offending dewatering systems and plant. Odour control sprays will be applied as
     necessary to mask odour emissions if complaints are received from neighbouring residents. This may
     include the direct injection of deodorisers to the groundwater treatment system.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                     Page 19

Page 24

                                                                                          ADG Consulting Pty Ltd


8    Limitations
     ADG Consulting Pty Ltd has prepared this report for Sam Tatton and SCG Consulting Engineers in
     accordance with the agreed scope of work. The services performed by ADG have been conducted in a
     manner consistent with the normal level of care and expertise exercised by members of the
     environmental consulting profession. No other warranty or guarantee, expressed or implied, is made as
     to the professional advice included in this report.

     This report is solely for the use of Sam Tatton and SCG Consulting Engineers and ADG accepts no
     responsibility for the use of any part of this report for any other purpose or by third parties, as it may not
     contain sufficient information for the purposes of other parties or users. This report must only be
     presented in full, and may not be used for any other objective, except where prior written approval is
     obtained from ADG. This report does not comment on legal obligations, as legal advice can only be given
     by qualified legal practitioners.

     The information contained in this report is provided to minimise potential impacts on the receiving
     environment, however implementation of the described management procedures does not guarantee
     that the objectives will be achieved.

     The information contained in this report is considered to be accurate at the date of issue. Subsurface
     conditions, including contaminant concentrations can change in space and time, either through natural
     processes or by the accidental or intentional addition of contaminants to a site. Where conditions
     encountered subsequently at the site are significantly different from those reported herein, ADG must
     be notified and be provided the opportunity to review the conclusions and recommendations of this
     report.




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                         Page 20

Page 25

                                                                                   ADG Consulting Pty Ltd


9    References
     ANZG 2018. Australian and New Zealand Guidelines for Fresh and Marine Water Quality. Australian and
     New Zealand Governments and Australian state and territory governments, Canberra ACT, Australia.

     ANZECC/ARMCANZ. 2000. Australian and New Zealand Guidelines for Fresh and Marine Water Quality.
     Australian and New Zealand Environment and Conservation Council and Agriculture and Resource
     Management Council of Australia and New Zealand.

     DES. 2019. Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Department of
     Environment and Science, Queensland Government. Brisbane, Queensland, Australia.

     DEHP. 2013. Queensland Water Quality Guidelines 2009, Version 3. Department of Environment and
     Heritage Protection. Brisbane, Queensland, Australia.

     DES. 2022. Noosa River environmental values and water quality objectives. Department of Environment
     and Science (DES), Queensland Government.

     DES. 2018. Monitoring and Sampling Manual 2018, Version 2 June 2018. Department of Environment and
     Science. Brisbane, Queensland, Australia.

     Government of Western Australia. 2011 (Amended 2015). Cone of Depression. Department of Water and
     Environmental Regulation. Accessed 11 June 2024, https://www.der.wa.gov.au/your‐environment/acid‐
     sulfate‐soils/66‐cone‐of‐depression.

     NHMRC. 2018. Guidelines for Managing Risks in Recreational Water. Australian Government, National
     Health and Medical Research Council.

     PTG Consulting. 28 June 2024. Geotechnical Investigation Report, Proposed Residential Development, 25
     Wyuna Drive, Noosaville. Ref: PTG/00259 – 0001–Rev0.

     SCG Consulting Engineers. May 2024. Operational Works for Residential Development, Lot 12 on N10576,
     25 Wyuna Drive, Noosaville. Ref: SCG‐0282‐CD, Issue 1. particularly Drawing 0282 ‐OW3.1 (Refer to
     Appendix C).




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24                                                Page 21

Page 26

                                                                      ADG Consulting Pty Ltd




Appendix A:         Figures
                    Figure 1 Site and proposed monitoring locations




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24

Page 27

Figure 1 - Site and proposed monitoring locations (to be confirmed)                                                               A product of

Lot 12 on N10576, 25 Wyuna Drive, Noosaville, QLD
26°23'33"S 153°4'33"E                                                 26°23'33"S 153°4'54"E




                                                                                                   Legend located on next page




                                                                                                                             0                       50 metres
                                                                                                                                     Scale: 1:1927

                                                                                                                                    Printed at: A3
                                                                                                                                Print date: 11/7/2024
                                                                                                                      Not suitable for accurate measurement.
                                                                                                                   Projection: Web Mercator EPSG 102100 (3857)
                                                                                               For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
                                                                                                                                        us.html
                                                                                              Includes material © State of Queensland 2024. You are responsible for ensuring that
                                                                                              the map is suitable for your purposes. The State of Queensland makes no
                                                                                              representation or warranties in relation to the map contents and disclaims all liability.
                                                                                              If imagery is displayed, imagery includes material © CNES reproduced under license
                                                                                              from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, © Planet Labs
                                                                                              PBC, 2023




26°23'47"S 153°4'33"E                                                 26°23'47"S 153°4'54"E                                 Department of Resources

Page 28

                                                      ADG Consulting Pty Ltd




Appendix B:         DRDMW licenced bore search




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24

Page 29

DRDMW Licensed Bore Search                                                              A product of

200 m radius
26°23'30"S 153°4'28"E        26°23'30"S 153°5'3"E




                                                         Legend located on next page




                                                                                 0                           100 metres
                                                                                           Scale: 1:3212

                                                                                          Printed at: A3
                                                                                      Print date: 11/7/2024
                                                                            Not suitable for accurate measurement.
                                                                         Projection: Web Mercator EPSG 102100 (3857)
                                                     For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
                                                                                              us.html
                                                    Includes material © State of Queensland 2024. You are responsible for ensuring that
                                                    the map is suitable for your purposes. The State of Queensland makes no
                                                    representation or warranties in relation to the map contents and disclaims all liability.
                                                    If imagery is displayed, imagery includes material © CNES reproduced under license
                                                    from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, © Planet Labs
                                                    PBC, 2023




26°23'54"S 153°4'28"E        26°23'54"S 153°5'3"E                                 Department of Resources

Page 30

DRDMW Licensed Bore Search
200 m radius
   Legend                                                                Attribution



                                                                     Maxar
    Registered water bores             Roads and tracks
                                                                     Includes material © State of Queensland (Department of Resources); ©
    [RDMW and private]                     Motorway                  Commonwealth of Australia (Geoscience Australia); © 21AT, © Earth-i, all rights
            Artesian bore                                            reserved, 2024.
                                           Highway
            Artesian bore                                            © State of Queensland (Department of Resources) 2023
                                           Secondary
            (abandoned but useable)
                                                                     © State of Queensland (Department of Resources) 2024
                                           Connector
            Artesian bore
            (abandoned and                 Local                     © State of Queensland (Regional Development, Manufacturing and Water) 2022
            destroyed)                                               This data were created by Geoscience Australia and are subject to
                                           Restricted Access Road
            Artesian bore, ceased to                                 Commonwealth of Australia Copyright.
            flow                           Mall

            Artesian bore, ceased to       Busway
            flow (abandoned but
                                           Bikeway
            useable
                                           Restricted Access
            Artesian bore, ceased to
                                           Bikeway
            flow (abandoned and
            destroyed)                     Walkway

            Sub-artesian facility          Restricted Access
                                           Walkway
            Sub-artesian facility
            (abandoned but useable)        Non-vehicular Track

            Sub-artesian facility          Track
            (abandoned and
                                           Restricted Access Track
            destroyed)
                                           Ferry
            Surface water facility
                                           Proposed Thoroughfare
            Surface water facility
            (abandoned but useable)
                                       [Deprecated] Railway
            Surface water facility     station
            (abandoned and
            destroyed)

    Places: Land parcel
            Site - Lot 12 on N10576

    Places: My Places(1)
            My Place 1

    Green bridges


    Bridges


    Tunnels


    [Deprecated] Railway

Page 31

                                                              ADG Consulting Pty Ltd




Appendix C:         Operational Works ‐ Drawing 0282 ‐OW3.1




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24

Page 32

THE SITE




                             Issue:




                             SCG HOLDINGS PTY LTD T/A
                                                                  Unit 1/11 Project Ave,
                                                                  Noosa Heads
                                                                  Ph (07) 5455 5604
                                                                  email:[email protected]
                                                                  web:www.scg-engineers.com
                                                                  ABN 68 669 675 790




                                       Title:




                                    Project




                                    Date:               Drawn                Design

                                      Checked:          Drg No.                        Rev.




           Rev. - 10.06.16

Page 33

    –


·


                                            ‘      ’

·

·

·
·


·

·

·

·

·

·




                          Issue:




                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604




                          DEBUILD T/A
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 40 098 481 899




                              Title:




                             Project




                             Date:       Drawn                    Design

                              Checked:   Drg No.                            Rev.




        Rev. - 10.06.16

Page 34

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                            Title:




                         Project




                         Date:               Drawn                Design

                           Checked:          Drg No.                         Rev.




Rev. - 10.06.16

Page 35

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                            Title:




                         Project




                         Date:               Drawn                Design

                           Checked:          Drg No.                        Rev.




Rev. - 10.06.16

Page 36

                                                                                                    1.73
                                                                                                        1.




                                                                         Issue:




                                                                         SCG HOLDINGS PTY LTD T/A
                                                                                                                       Unit 1/11 Project Ave,
                                                                                                                       Noosa Heads
                                                                                                                       Ph (07) 5455 5604
                                                                                                                       email:[email protected]
                                                                                                                       web:www.scg-engineers.com
                                                                                                                       ABN 68 669 675 790




SITE PREPARATION & EARTHWORKS                                                      Title:




                                DILAPIDATION REPORT:                            Project




                                                                                Date:                        Drawn                Design

                                                                                  Checked:                   Drg No.                         Rev.




                                                       Rev. - 10.06.16

Page 37

RESIDENTIAL
DEVELOPMENT




                                Issue:




                                SCG HOLDINGS PTY LTD T/A
                                                                     Unit 1/11 Project Ave,
                                                                     Noosa Heads
                                                                     Ph (07) 5455 5604
                                                                     email:[email protected]
                                                                     web:www.scg-engineers.com
                                                                     ABN 68 669 675 790




                                          Title:




                                       Project




                                       Date:               Drawn                Design

                                         Checked:          Drg No.                        Rev.




              Rev. - 10.06.16

Page 38

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                            Title:




                         Project




                         Date:               Drawn                Design

                           Checked:          Drg No.                         Rev.




Rev. - 10.06.16

Page 39

RESIDENTIAL
DEVELOPMENT




                                                   Issue:




                                                   SCG HOLDINGS PTY LTD T/A
                                                                                        Unit 1/11 Project Ave,
                                                                                        Noosa Heads
                                                                                        Ph (07) 5455 5604
                                                                                        email:[email protected]
                                                                                        web:www.scg-engineers.com
                                                                                        ABN 68 669 675 790



        PLUMBING ARTICULATION:
                                                             Title:




                                                          Project




                                                          Date:               Drawn                Design

                                                            Checked:          Drg No.                        Rev.




                                 Rev. - 10.06.16

Page 40

                                                      ADG Consulting Pty Ltd




Appendix D:         Dewatering calculation output




ADG1673.24 Dewatering Management Plan_Rev0_12.07.24

Page 41

Input

Length of excavation: |20 | metres
Width of excavation | 18 | metres
Drawdown required: | 18 | metres
Aquifer thickness”) | 10 | metres
Hydraulic conductivity: lo 0000949 | metres/second

Calculate

Results
Effective pumping radius, Re: 11 metres
Cone of depression radius, Ro : 53 metres

litres/second

oO

Total pumping rate:

Pumping time required: 44 hours

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.