ADG1673.24 Dewatering Management Plan_Rev0_12.07.24
Plans and drawings: the text below has words only, no drawings.
ADG Consulting Pty Ltd
Table 5 Monitoring responsibilities
Activity Frequency Responsibility Person
Monitoring of field parameters in discharge water
Daily Site Manager Site Manager
and untreated extracted groundwater
Monitoring of field parameters in untreated
Environmental
extracted groundwater, discharge water, Weekly ADG Consulting
Consultant
receiving waters and background waters
Laboratory analysis of samples recovered from Environmental
Weekly ADG Consulting
discharge water and receiving waters Consultant
Monitoring of field parameters in extracted Environmental
Weekly ADG Consulting
groundwater (pre‐treated) Consultant
Laboratory analysis of samples recovered from Initially, then as Environmental
ADG Consulting
extracted groundwater (pre‐treated) required Consultant
6.6 Maintenance
The groundwater treatment systems must be regularly maintained. Maintenance must include:
Regular cleaning and or replacement of the filters within the filtration unit, where required to be
installed.
Regular removal of sediment from the sedimentation tank. The sediment must be either returned
to the excavation pit for dewatering and bulking out with excavated material, or removed from the
site by a licensed liquid waste contractor.
Regular check of the dosing system and top‐up of buffering solutions and flocculants.
6.7 Reporting
Dewatering management procedures and monitoring results will be reviewed by ADG Consulting weekly
to ensure that the treatment procedures are effective, and that the receiving waters are not being
impacted by the extracted groundwater being discharged.
The following reporting procedures will be adopted:
A summary report will be prepared upon completion of the initial pre‐discharge monitoring. The
report will be submitted to the Site Manager, Dewatering Contractor, and NSC upon request.
Weekly interim reports will be prepared upon receipt of laboratory data for each round of ongoing
compliance monitoring. The interim reports will display all data obtained during the previous
monitoring event, and provide comments and recommendations based on the results.
A dewatering compliance report will be prepared on completion of the project (upon request).
The above reports will be prepared by ADG Consulting and provided to the Site Manager and Dewatering
Contractor as they become available. The reports will include all water quality results and comparison to
the WQOs, corrective actions and recommendations made to the Site Manager and Dewatering
Contractor during the monitoring period.
The Site Manager must keep records of complaints, volumes of chemicals used, and treatment methods
employed. These records must be available on‐site at all times and submitted to NSC by the Site Manager
upon request.
ADG1673.24 Dewatering Management Plan_Rev0_12.07.24 Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.