ADG1673.24 Dewatering Management Plan_Rev0_12.07.24
Plans and drawings: the text below has words only, no drawings.
ADG Consulting Pty Ltd
3 Previous investigations
This DMP is based on site specific information sourced from the following, provided to ADG by
SCG Consulting Engineers:
(Preliminary) Geotechnical Investigation, Proposed Residential Development, 25 Wyuna Drive,
Noosaville. June 2024. PTG Consulting. Ref: PTG/00259 – 0001 – Rev0.
Operational Works for Residential Development: Earthworks Plan – 25 Wyuna Dr, Noosaville, QLD.
Drawing set May 2024, SCG 0282‐CD Issue 1, (particularly Drawing 0282 ‐OW3.1). SCG Consulting
Engineers Pty Ltd (Refer Appendix C).
It is noted that dilapidation reports for surrounding structures and services are proposed to be
undertaken prior to commencement of construction and dewatering, however are to be provided to
Council separately from this DMP.
A brief discussion of relevant soil and groundwater conditions is provided below.
3.1 PTG Consulting 2024
A preliminary Geotechnical Investigation and concurrent Acid Sulfate Soils Investigation was undertaken
at the site in May 2024 (reported June 2024) by PTG Consulting.
3.1.1 Soils
A total of one (1) borehole (BH1) was drilled on the proposed development footprint to 6.0 mbgl.
The subsurface profile encountered is generally described as silty sand fill material at the ground surface,
extending to the depth of 2.6 m. Fill material is underlain by natural sand and silty sand which is initially
loose, becoming denser with depth, extending to depths ranging between 2.6 m to the 6.0 m termination
depth.
Alongside the Geotechnical Investigation (2024), Acid Sulfate Soil (ASS) samples were collected at 0.5 m
intervals in BH1 to 6.0 m depth. A total of twenty‐four (24) samples were collected for ASS screening and
four (4) samples were selected for further analysis by the Chromium Reducible Sulfur suite (CRS).
ADG notes that the testing was limited to one borehole with ASS testing to 6.0 m depth, and PTG reports
that within part of this depth profile the natural sands are considered to contain potential ASS requiring
liming at rates of up to 12 kg/tonne. Additionally, on‐site fill material is considered to contain potential
ASS requiring limiting rates of to 3.6 kg/tonne. All excavated spoil from depths below RL 5 m AHD within
the excavation footprint will be appropriately neutralised with lime and validated in accordance with
recommendations by PG in the ASS Investigation Report (PTG, 2024).
3.1.2 Groundwater
During drilling activities for the Preliminary Geotechnical Investigation, groundwater seepage/inflow was
encountered at 2.4 m depth below the ground surface (PTG, 2024) (inferred approx. 0.3 m AHD from SCG
OPW civil drawings).
It should be noted however, that groundwater depths and ground moisture conditions are affected by
weather and climatic conditions, tidal variations, surface and subsurface drainage/permeability
conditions, and human influence and will therefore vary with time. Groundwater levels are expected to
be similar to the water level in the river to the north, albeit somewhat a dampened response to tidal
variations.
3.2 Groundwater quality
No groundwater quality data was obtained by PTG as part of the preliminary geotechnical investigation.
However, based on numerous groundwater investigations and dewatering monitoring projects that have
been undertaken by ADG throughout the Noosa Coast Region in recent years, our understanding of the
groundwater quality in the region is provided below:
ADG1673.24 Dewatering Management Plan_Rev0_12.07.24 Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.