Notes for Construction & Maintenance of Timber Decks: Timber Queensland recommend that all timber has a moisture content of 15%
Decking boards to be fixed with 2/nails or screws & staggered or offset along the joists. Holes at ends of boards
Builder to adhere to BCA Part 3.10.6 & to Manufactures Engineers specifications or industry standards at all times & to be drilled holes to be 80% of nail diameter & 12mm from ends of boards. Nails & screws to finish flush with
Owners to follow manufactures details for maintenance & cleaning of deck top of boards (Not Punched). Nails or screws to be hot dipped galvanized or stainless steel. Stainless Steel to
All timber posts to be naturally durable Class 1 or 2 above ground or softwoods H3 treated if supported on bracket if in be used within 900 mm of pools
ground to be H5 Treated soft or hardwood. All Framing Anchors, Fixing Plates, Nailing Plates, Joist hangers to be Galvanised Minimum or Stainless Steel
Recommend brackets or supports be used & Bitumen paint be applied to the top 200 mm of bracket in the concrete. where Construction within 2.0 km radius of open coastal areas
Posts to have a Minimum 75 mm clearance from the base of the post to footing or slab & post to be 10 mm above cross Ends of boards to be slightly undercut at joints. Gaps between decking boards to be min 3 mm to 5 mm
member of bracket. End grain of post to be sealed prior to erecting. (Check with supplier Gaps range with different Types of timbers)
Top of concrete pad footing to be mounded to fall away from support to prevent water from ponding Decking boards to be fully sealed (Oiled, Stained, Painted etc.) prior to fixing.
Bearers, Hardwood to be H3 treated if less than 400 mm above ground H4 for touching ground H5 for in ground. Recommend a light coloured sealer, with UV protection and a fungicide to be used
Joists as bearers depending on ground clearance. Joists to have Malthoid strip or an, approved proprietary joist
protection system, fixed to top of joists. Softwood & Engineered manufactured timbers bearers & joists to be H3 min Maintenance & inspection of deck by Owner is to be carried out regularly
treated at all times. Approved connectors be used for treated timbers & location. Sweep or blow, leaf or other debris off deck. Hosing or use of water to be avoided. Keep the gaps between
Recommend hot dip galvanized or stainless steel connectors & fixings be used at all times. Especially where decking boards clear of dirt & debris.
inspections are not possible deck is to close to ground or decking to be screwed in place to allow for easy removal to Reseal decking boards when required by manufactures recommendations
inspect sub-floor for any issues. Inspect all connections for corrosion or movement regularly (Twice Yearly)
Pot plants to be on stands with a drip tray underneath & moved around regularly to prevent uneven weathering
of the deck
Accolade Building Designs recommends that Builder & Home Owners read Wood Solutions TDG 21 at
www.woodsolutions.com.au
Teco Bracing over rafters
Top Plates 2/70x45 MGP12 or tensioned & looped at ends
1/90x45 + 1/90x35 MGP12 2/30x2.8 nails per rafter
Approved type Colorbond Flashing Trimdek (Monument) Roof sheeting
From wall to Roof Sheet Fixed to Manufacturers details for N3 Wind Rating
Wall plate 150x35 Smart LVL14
1/Type 14 No 17 x 75 mm each Stud Approved type roof battens
10° Fixed to Manufacturers details for N3 Wind Rating
Trimdeck (Monument) Roof sheeting
Fixed to Manufacturers details for N3 Wind Rating Rafters 150x42 Smart LVL 15 Cont/Span @ 900 Ctrs
Approved type roof battens 15° 2/Framing Anchors (Triple grips) 4/30 mm FH Nails per leg
Fixed to Manufacturers details for N3 Wind Rating
Rafters 130x42 Smart LVL 15 @ 900 Ctrs g
1/ Framing Anchor (Triple Grip) or Hanger Ceilin
ing to 2nd Res. Pitching
4/30x2.8 FH. Nails per leg pe Lin
ved ty
Appr o
3564 Top of Frame
2430
All cladding Colorbond Trimdeck (Monument) sheeting
Lintels to openings See Win/Door Schedules
W7 Fixed to Manufacturers details for N3 Wind Rating
Studs up to 3000mm 70x35 MGP12@ 450 Ctrs
W1
2200 Underside of Beam
2430 Pitching Hgt
Studs up to 3600mm 2/70x35 MGP12 or 90x35 MGP12 @ 450 Ctrs
D1
C1: Hwd post
75 mm Clearance to base
2100
Approved type Balustrade to BCA 3.9.2
FJ1: Floor Joists @ 450 Ctrs Cont/span
1/Framing Anchor (Triple Grips)
1000
DJ2: Deck Joists @ 450 Ctrs 4/30x2,8 FH Nails per leg
1/ Framing anchor (Triple Grips)
4/30x2.8 FH Nails per leg 19 mm Structaflor (Yellow Tongue) 2nd Res. Floor
DB2: Deck Bearer 2/M12 bolts to C1
0
Bottom Plates 70x35 MGP12
FB1: Floor Bearers Cont/span
2/M12 bolts to C2
2291
16 mm Rod Bracing Sets
see Sheet 8 C2: Galv SHS With Bitumen paint applied
Mass Concrete strip & Pad footings
Pryda PSQ600100/12 See Sheet 8
Post support bracket 2/M12 bolts to posts
N12 Rod cranked through bracket
Section A
A 1 : 50
Engineers Details to Take
Precedence Over Shown Details
Client: Peter & Karyn Cook Address: 70 Blanckensee Rd Black Mountain Noosa Shire Council Mobile: 0407 693 018 Date 30/05/2023 2:30:10 PM
ACCOLADE Building Designs Drawn by; S.Horn Drawn for A3 Sheet
RPD: Lot 1 on RP 193199 Site Area : 19,986 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected]
Project Number 0323CPK
Proposed Additional Bed room & Living Area, SHS & Timber Posts , Timber Framed, Sheet Roof QBSA Lic. 54806 Issue Date: 30 - MAY - 2023 Scale 1 : 50 Sheet No. 5 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
220241.01 - 70 Blanckensee Road, BLACK MOUNTAIN - SECONDARY DWELLING - Architectural & Engineering Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 668 KB (small file)
- File type
No other editions are linked here.