Original source · versioned page text
OPW Form 6
Attached to the e-mail Operational Works Application OPW16/0338.
IDAS form 6—Building or operational work assessable
against a planning scheme
(Sustainable Planning Act 2009 version 3.1 effective 3 August 2015)
This form must be used for development applications for building work or operational work assessable against a
planning scheme.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
complete IDAS form 1—Application details
complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.
This form must be used for building work or operational work relating on strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,
take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.
Mandatory requirements
1. What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable
boxes.)
Building work—complete Table A Operational work—complete Table B
Table A
a) What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
building)?
b) Are there any current approvals associated with this application? (e.g. material change of use.)
No Yes— provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (OPW Form 6.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 4 pages
Page 2
Table B
a) What is the nature of the operational work? (Tick all applicable boxes.)
Road works Stormwater Water infrastructure
Drainage works Earthworks Sewerage infrastructure
Landscaping Signage Clearing vegetation under the planning scheme
Other—provide details
b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
No Yes—specify the number of lots being created
c) Are there any current approvals associated with this application? (E.g. material change of use.)
No Yes—provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
2. What is the dollar value of the proposed building work? $
(Inc GST, materials and labour.)
3. What is the dollar value of the proposed operational work? E$2000 (tree
(Inc GST, materials and labour.) removal)
Mandatory supporting information
4. Confirm that the following mandatory supporting information accompanies this application
Mandatory supporting information Confirmation of Method of
lodgement lodgement
All applications involving building work or operational work
A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are Confirmed
recommended scales) which shows the following:
the location and site area of the land to which the application relates
(relevant land)
the north point
the boundaries of the relevant land
the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)
any existing or proposed easements on the relevant land and their
function
any access limitation strips
all existing and proposed roads and access points on the relevant land.
IDAS form 6—Building or operational work assessable
against a planning scheme
Version 3.1—3 August 2015
Page 3
A statement about how the proposed development addresses the local Confirmed
government’s planning schemes and any other planning documents relevant
to the application.
A statement addressing the relevant part(s) of the State Development Confirmed
Assessment Provisions (SDAP). Not applicable
Applications for building work (including extensions and demolition that is assessable development)
Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are Confirmed
recommended scales) which show the following: Not applicable
the north point
the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
the room layout (for residential development only) with all rooms clearly
labelled
the existing and the proposed built form (for extensions only)
the gross floor area of each proposed floor area.
Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are Confirmed
recommended scales) which show plans of all building elevations and Not applicable
facades, clearly labelled to identify orientation (e.g. north elevation).
Plans showing the size, location, proposed site cover, proposed maximum Confirmed
number of storeys, and proposed maximum height above natural ground level Not applicable
of the proposed new building work.
Plans showing the extent of any demolition that is assessable development. Confirmed
Not applicable
Applications for operational work involving earthworks (filling and excavating)
Drawings showing: Confirmed
existing and proposed contours Not applicable
areas to be cut and filled
the location and level of any permanent survey marks or reference
stations used as datum for the works
the location of any proposed retaining walls on the relevant land and their
height
the defined flood level (if applicable)
the fill level (if applicable).
Applications for operational work involving roadworks
Drawings showing: Confirmed
existing and proposed contours Not applicable
the centreline or construction line showing chainages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points
information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
edge of pavement where kerb is not constructed
position and extent of channelisation
location and details of all traffic signs, guideposts, guardrail and other
street furniture
pavement markings including details on raised pavement markers
IDAS form 6—Building or operational work assessable
against a planning scheme
Version 3.1—3 August 2015
Page 4
catchpit, manhole and pipeline locations
drainage details (if applicable)
cross road drainage culverts (if applicable)
concrete footpaths and cycle paths
location and details for access points, ramps and invert crossings
changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing: Confirmed
existing and proposed contours Not applicable
drainage locations, diameters and class of pipe, open drains and
easements
manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.
Applications for operational work involving water reticulation
Drawings showing: Confirmed
kerb lines or edge of pavement where kerb is not constructed Not applicable
location and levels of other utility services where affected by water
reticulation works
pipe diameter, type of pipe and pipe alignment
water main alignments
water supply pump station details (if applicable)
minor reservoir details (if applicable)
conduits
location of valves and fire hydrants
location of house connections (if applicable)
location of bench marks and reference pegs.
Applications for operational work involving sewerage reticulation
Drawings showing: Confirmed
location of all existing and proposed services Not applicable
location of all existing and proposed sewer lines and manhole locations
location of all house connection branches
kerb lines or edge of pavement where kerb is not constructed
chainages
design sewer invert levels
design top of manhole levels
type of manhole and manhole cover
pipe diameter, type of pipe and pipe alignment
location of house connections (if applicable)
sewer pump station details (if applicable).
Applications for operational work involving street lighting
Drawings showing: Confirmed
location of all light poles and service conduits Not applicable
location of all other cross road conduits
type of wattage and lighting
any traffic calming devices
additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment
IDAS form 6—Building or operational work assessable
against a planning scheme
Version 3.1—3 August 2015
Page 5
details of lighting levels.
Applications for operational work involving public utility services
Drawings showing: Confirmed Unity Water
any existing light poles and power poles Not applicable decision notice
2016008949
any existing underground services
details of proposed services
alteration to existing services.
Applications for operational work involving landscaping works
Drawings showing: Confirmed
the location of proposed plant species Not applicable
a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences
the proposed maintenance period
irrigation system details.
Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONLY
Date received Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure, Local Government and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
IDAS form 6—Building or operational work assessable
against a planning scheme
Version 3.1—3 August 2015