OPW Form 6
Attached to the e-mail Operational Works Application OPW16/0338.
catchpit, manhole and pipeline locations
drainage details (if applicable)
cross road drainage culverts (if applicable)
concrete footpaths and cycle paths
location and details for access points, ramps and invert crossings
changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing: Confirmed
existing and proposed contours Not applicable
drainage locations, diameters and class of pipe, open drains and
easements
manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.
Applications for operational work involving water reticulation
Drawings showing: Confirmed
kerb lines or edge of pavement where kerb is not constructed Not applicable
location and levels of other utility services where affected by water
reticulation works
pipe diameter, type of pipe and pipe alignment
water main alignments
water supply pump station details (if applicable)
minor reservoir details (if applicable)
conduits
location of valves and fire hydrants
location of house connections (if applicable)
location of bench marks and reference pegs.
Applications for operational work involving sewerage reticulation
Drawings showing: Confirmed
location of all existing and proposed services Not applicable
location of all existing and proposed sewer lines and manhole locations
location of all house connection branches
kerb lines or edge of pavement where kerb is not constructed
chainages
design sewer invert levels
design top of manhole levels
type of manhole and manhole cover
pipe diameter, type of pipe and pipe alignment
location of house connections (if applicable)
sewer pump station details (if applicable).
Applications for operational work involving street lighting
Drawings showing: Confirmed
location of all light poles and service conduits Not applicable
location of all other cross road conduits
type of wattage and lighting
any traffic calming devices
additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment
IDAS form 6—Building or operational work assessable
against a planning scheme
Version 3.1—3 August 2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (OPW Form 6.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.