2022-06-28 Special Meeting - Item 2 - Attachment 1 - Operational Plan 22-23
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSignificant Initiatives/Capital Projects
Several significant initiatives have been highlighted in the 22/23 Operational Plan. These
initiatives are at varying levels of planning, commencement of construction or final
implementation however all form part of Council’s priorities in the reporting year and include:
- Development of the new Noosa Council Corporate Plan
- Implementation of major strategies including the Noosa Transport Strategy, the Environment
Strategy, and Economic Development Strategy
- Implement the Walking and Cycling Strategy
- Noosa Hinterland Recreation Trails Upgrade
- Implementation of the Coastal Hazards Adaption Plan
- Implementation of the Climate Change Response Plan
- Development and adoption of Noosa’s Waste Management Strategy
- Completion and implementation of the Housing Strategy
- Development and implementation of a Destination Management Plan
- Implementation of the Noosaville, Eumundi Landfill Master Plan
Council’s capital program will increase significantly in 22/23 because of Council attracting
more than $20 M in government grants and external funds to support Council in undertaking job-
creating and community projects to stimulate economic development and build community
resilience to natural disasters.
The most significant capital projects include:
Bridge Renewal Programme 5.1M (Cooroy Belli Creek Road bridge Renewal 1.8M; Noosa
Heads Garth Proud Bridge Renewal 3 M; Black Mountain Lawnville Road Bridge 292K)
Shire Reseal Program 5.3 M
Noosa Heads Parade Corridor Upgrade 4.6 M
Living Firetec Lab Upgrade Disaster Recovery 1.5 M
Federal Middle Creek Road reconstruction 1.3 M
Noosaville Noosa Lock and Weir Annual Renewal program 1.2 M
Tewantin Beckmans Road Bypass Stage 1, 2 M
Noosa Hinterland Trail 5 Upgrade 1.1 M
Noosa Heads Dogbeach SEMP 1 M
NDCS- Stage 1 Mc Kinnon Drive Community Sports Centre 750K
11