Skip to the record
Accept no substitutions.

Original source · versioned page text

2022-06-28 Special Meeting - Item 2 - Attachment 1 - Operational Plan 22-23

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Corporate Plan Theme - The Noosa Community                                                           Operational Plan 22/23
Corporate Plan Key     Operational Initiatives         Outcomes                                            Responsible Areas
Focus Areas
2.1 Undertake         Implement priority activities    An effective framework to continue to improve       Community
implementation of the from the Social Strategy         community wellbeing and cohesiveness                Development
Noosa Social Strategy

                       Support the community with      Improved community outcomes through Council CEO
                       the intensity of usage of the   advocacy
                       Kin Kin Quarry
                       Maintain our relationship       A positive and effective partnership built on trust Director
                       with the local indigenous       and respect                                         Community
                       community                                                                           Services
                       Finalise and initiate           Understanding of housing challenges is widely       Director
                       implementation of Housing       understood by the community and a range of          Environment &
                       Strategy                        initiatives are underway to address current         Sustainable
                                                       housing shortages                                   Development
2.2 Adopt and          Implement priority activities   Delivery of better social outcomes including a      Community
implement the          from the Cultural Plan,         cohesive resilient community, an active and         Development
following plans that   Community Health and            healthy community, an accessible diverse and
form part of our       Wellbeing Plan and the Sport    affordable community
Noosa Social           and Active Recreation Plan
Strategy - Cultural    Living Well Noosa               Increased community health and wellbeing            Community
Plan, Community                                                                                            Development
Health and
Wellbeing Plan and
the Sport and Active   Early literacy programs         Delivery of learning programs for children aged     Libraries &
Recreation Plan                                        0-5 and their families to improve early literacy    Galleries
                                                       outcomes


                       Heritage Noosa Stage 3          Increase preservation and awareness of              Libraries &
                                                       Noosa’s heritage                                    Galleries


                       Development of conservation Preservation of heritage sites                          Libraries &
                       management plans for two                                                            Galleries
                       additional heritage sites

                       Undertake heritage studies      Implementation of recommendations from the    Libraries &
                                                       Local Heritage Register Review to ensure best Galleries
                                                       practice management and protection of Noosa’s
                                                       heritage sites


                       Develop scope of                Implementation of recommendations of the            Libraries &
                       remediation works for           Conservation Management Plan                        Galleries
                       Cooroy Butter Factory
                       brickwork
2.3 Implement the      New Mobile Library and     Accessible and contemporary outreach library             Libraries
Libraries Strategic    Community Outreach Service services
Plan                   is implemented
2.4 Continue to        Progress the implementation     Strategic direction for the development and         Community
support our            of the Master Plans for the     implementation of sport and recreation facilities   Development
community to utilise   Noosa District Sports
Council controlled     Complex and Cooroy Sports
land and buildings     Complex
through formal         Noosa Leisure Centre            Optimization of the use of the facility and         Community
tenure arrangements    Options Study                   community needs are met                             Facilities

                                                           15
Log in to download the original file

2022-06-28 Special Meeting - Item 2 - Attachment 1 - Operational Plan 22-23(PDF, 2MB).pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.