Original source · versioned page text
2017-10-10 S&O Agenda - Attachment 1 to Item 7 - Noosa Local Disaster Management Plan 2018
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn10.3.3 Noosa LDCC activation triggers and actions
Activation level Threat/Trigger Actions
Alert • Information received identifying: a • Hazard / threat identified
threat which is likely to develop in the • Initial threat advice from relevant agency provided to LDC
region over the next 1-3 days.
• Monitor weather forecasts at regular intervals
• Lead agency advises they are likely
• Availability of staff at relevant agencies determined
to establish an incident coordination
centre(s) at Lean Forward or Stand • Contact lists checked and updated including mobile phone and SMS contact
Up status. list
• Notify Chair and members of the Local Group of threat/emergent situation
• Contact with incident controller at lead agency ICC established
• Contact with DDC (or delegate) and QFES (DM) established
• Notify LDCC staff and confirm availability of staff for LDCC if needed
• Media and communication strategy prepared
Lean Forward • Probable disruption / impact of an • Preliminary SitRep developed
expected event on the community, is • Notifications sent and acknowledged
less than 24 hours away.
• Decision made on likely activation phase
• Potential for multiple events which
• Availability of staff for LDCC confirmed
will require a coordinated response
from a number of agencies from the • Contact maintained between lead agency ICC, LDC, DDC and QFES (DM)
Noosa Disaster Management
System. • If time available extraordinary Local Group meeting held
• Preparations undertaken to activate LDCC as per sub-plan
• Lead agency advises it has
established an active incident • Scale (size) of LDCC being considered
coordination centre(s). • After hours support and access arranged if likely to be required
• Public information and warnings plan activated
Noosa Local Disaster Management Plan 2018 Page 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.