Original source · versioned page text
M2677 - IR response
BRISBANE | SUNSHINE COAST | CENTRAL QLD KON-TIKI BUSINESS CENTRE TOWER 1, LEVEL 2, SUITE T1.209, 55 PLAZA PARADE, MAROOCHYDORE QLD 4558 JFP URBAN CONSULTANTS PTY LTD ABN 79 050 414 045 16 February 2021 Job Ref: M2677 Client Ref:20110/PO11000006 Council Ref: MCU20/0150 Noosa Council By Email: <[email protected]> Att: Patrick Murphy – Coordinator Planning Re: Development application for a Material Change of Use (34 x Multiple Dwellings), over land at 101-105 Eumundi Noosa Road Noosaville, and legally described as Lot 1 on RP 849431 & Lot 1 RP230931 Dear Patrick, We refer to Council’s Information Request, dated 12 January 2021 , regarding the abovementioned application. In accordance with s13.2 of the Development Assessment Rules, we hereby provide all of the information requested as follows: Council Issue 1 – Stormwater It is noted that the proposal includes a proprietary device to treat the stormwater. This is contrary to Performance Outcomes O7 and O9 of the Water Quality and Drainage Code of the Noosa Plan 2020 The use of the proprietary underground stormwater treatment device in this instance is not supported as it has not been shown that use of a vegetated treatment system is not possible at this site and performance of the proposed system has not been verified through an independent national testing protocol (SQIDEP) Information Required Provide a revised stormwater treatment system and management plan which incorporates use of vegetated treatment systems as required by Specific Outcome O7 of the Water Sensitive Design Code. Response The use of an underground proprietary stormwater treatment device is no longer proposed. Accordingly, a revised Site Based Stormwater Management Plan has been prepared by Morgan Consulting Engineers (refer to Attachment A). This revised stormwater strategy incorporates the use of a vegetated treatment system, as outlined in the Water Sensitive Design code. Council Issue 2 – Stormwater Quality Provide a revised stormwater management plan incorporating a stormwater detention system which addresses the following issues: i. Demonstrate that stormwater discharges onto neighbouring land will not be concentrated for all events up to the 1%AEP event. Consideration should be made to adapting the detention basin design such that there is no spillway discharge for the 1%AEP event
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.