Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

07/0806 - Approved plans [As Published] · 172007.806

of 4

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

   

zincalume cusiom orb
roofing @ 25° pitch.

600mm eave
typical

 
 

 

 

 

A.
90x35 exposed h3 pine _

rafters @ approx 900 ©.

painted FC with battens ———-—__—_5

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

to match roofing

 

 

 

 

 

ye ~ 150 x150 h3 pine

post refar detail.

 

 

 

 

 

 

 

 

}

 

 

 

zincalume down pipe

fw gutter, zincalume half round ‘
profile fixed with straps,

 

 

2700

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90x35 exposed h3 pine
rafters @ approx 900 3.

2incalume down pipe
to match roofing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

painted rendered brickwork

 

 

 

 

 

 

 

 

 

 

j

 

 

 

 

|

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

painted rendered. brickwork

 

 

     

[J

 

2700

 

 

 

 

 

 

 

 

 

 

 

== |
SOUTH WEST ELEVATION
Scale 1:100 }
1
‘ sae aaa
ol , Nn m eave
cage tree nator aM Nl Vt

 

NORTH WEST ELEVATION

 

Scale 1:100

powder coated alum,
framed windows & doors.

4

  

|
|
}
|

!
t

i

 

GENERAL NOTES:

 

 

 

 

  

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

19/03/07

 

 

 

 

 

 

 

 

 

 

 

 

}

ESS Revisions ss: Vest mensions prior to constuction ‘squred dimensions take precedence | @ Copyright: David | ; Project: |Proposed Designed: D Villani Date:
:| Revision: ate: over scaled dimensions. COPYING iN PART OR WOROLE 1S , | Alterations/Additions Drawn: _D Villani Scale:_1:100 (A3)
‘A_[ WORKING DRAWINGS 19703707 | 2. All work 10 comply with relevant authority acts, regulations and ls. STRICTLY PROWBITED WHTHOUT : :
3, TIMBER PRAM be cored tin accondanes veih AS \g082. 1999 WRITER AUTHORITY. S Watherso n B Ul fe ers Pty Ltd Lot: 120 Drawing:
imber - Framed Construction.
«centr Catcceng sasesion oi. seh. tone onset (RED: 7¥| _ PROFESSIONAL BUILDING SERVICES | aimond Court ELEVATIONS #2
Or 3
5, Provide a moisture barrier (min. 200um thick} under ground stabs with 200mm Nat & Nodina Roberton ? Marcus ‘Beach Q :
laps. Securely tape ail joints and penetra :
6. Temite bariers to comply wilh AS 3660.1 Provide Termimesh or equal ae iO Po Box. 11 Woombye Qld 4559. Client:
broprietary system collars te all Penetrations in ground stab unless noted see Phone/Fax: (07)54455510 Mobile: 0409611398 Matt & Nadina Sheet #:] dab #: Drawing #: Rev #
otherwise. 3
7, Provide a positive fall away from the residence for ail disturbed ground at the [Parish: _We . ,
Sea lose octeaty dames Pea ee pasion wind SPEED: Q.B.S.A. Licence Number 1109379 Robertsdn 05|2007:120) WD.05| A
Copyright; Oavid Witani 2007 Area, 910 sq W33N-N2_k 1
4 |

 

Used in these records

About this file

File size
421 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0806 - Approved plans [As Published].pdf · 421 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.