Original source · versioned page text
2014-07-22 Planning & Organisation Committee Agenda
The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 22 JULY 2014 RECOMMENDATION That Council note the report by the Development Planner regarding Application No. MCU13/0067 for a Development Permit for Material Change of Use for Service & Utility Type 3 Tower situated at Grahams Road, Pinbarren; and A. Approve the application in accordance with the following conditions: PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of the Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed below, unless otherwise amended by the conditions of approval. Plan No. Rev. Plan Name Date 4POM-51-09-COTT-C2 04 Overall Site Plan drawn by Aurecon 15/04/2014 4POM-51-09-COTT-C3 04 Site Set-out Plan drawn by Aurecon 15/04/2014 4POM-51-09-COTT-C4 04 Site Elevation and Details drawn by 15/04/2014 Aurecon Building Height 3. The maximum height of the structure must not exceed 31 metres above the finished ground level and the natural ground surface. 4. Certification must be submitted to Council from a Licensed Surveyor which certifies that the monopole structure does not exceed the maximum height requirement of this Decision Notice. 5. No lights are permitted to be attached to the telecommunications facility, except where required for aircraft hazard lighting purposes or similar. Health and Safety 6. The development must not, at any time during the life of the development, result in human exposure to environmental electromagnetic emissions exceeding the current regulations, standards and/or recommendations of the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the infrastructure must provide, at any time upon request by Council, written certification to demonstrate compliance with this condition. The written certification must assume: (a) a maximum number of users over the lifetime of any pole or other supporting structure (b) full power usage (c) a maximum down tilt of antennae. 7. Warning information signs and security fencing must be provided on the site to prevent unauthorised entry. Fencing must be camouflaged through the use of colours, materials and screening vegetation to blend the fence into the visual landscape. Colours and Finishes 8. The monopole and associated panels must be finished in colours that blend in visually into the landscape. Cessation of Use 9. The telecommunications facility must be removed from the site upon cessation of the use. Page 28 of 133
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.