3. Stockpiles for soils and materials are to be protect using bunded banks to divert upstream flows, and with
downstream sediment fencing to prevent sediments being lost from the stockpile area
4. Diversion of upstream catchments around any exposed areas using diversion drains around the site.
5. Disturbed areas are to be stabilised through turfing or hydromulching as soon as practicable once
earthworks are complete.
4.2. Operational Phase
As the proposed development site is less than 2,500m 2 in area, the development is not required to meet stormwater
quality design objectives outlined in Table B in Appendix 2 of the State Planning Policy (2017). As this is not required
under the State Planning Policy, water quality improvement devices have not been included in the design.
Project number 20220206 Page 15 of 19
File 20220206 48 Elm St SWMP, 2023-02-03 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.