Figure 3.2 – DRAINS Pre-development catchment
Figure 3.3 – DRAINS Post-development catchments
It should be noted that the total site area in the proposed condition is greater than the existing site area due to
proposed awnings over the footpath. The results of the modelling against the range of design storms for the
development under the existing and proposed development conditions are shown in Table 3.1 Existing and
proposed unmitigated site peak discharge rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Qexisting Qproposed Qchange Qchange
AEP (2100)
(m³/s) (m³/s) (m³/s) (%)
0.5 EY 0.026 0.032 0.006 23%
10% 0.044 0.047 0.003 7%
5% 0.050 0.055 0.005 10%
2% 0.057 0.065 0.008 14%
1% 0.063 0.072 0.009 14%
The development of the site will therefore increase the total peak flows from the site under all storm events.
Attenuation is required to mitigate the outflows to ensure that the development does not exceed the
predevelopment levels to minimise impacts to the downstream environment.
Project number 20220206 Page 8 of 19
File 20220206 48 Elm St SWMP, 2023-02-03 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.