Council archive · source document
OPW17/0123 - Precinct F - Noosa Springs, Noosa Heads - Amendment to Bulk Earthworks and Site Clearing · OPW17/0123.02
Subject: 16003 [OPW17/0123] - Precinct F, Noosa Springs, Noosa Heads - Amendment to Bulk Earthworks and Site Clearing From: Henry Morgan Date: 2018-03-13T05:47:31+00:00 To: Mailbox Council Mail Attention: Mark Lewis To ensure that our current approvals are in line with our most recent updated plans at Precinct F, Noosa Springs can you please confirm if a generally in accordance with or amendment to the Operational Works Approval OPW17/0123 is required for the attached minor modifications. With reference to the attached updated Bulk Earthworks and Site Clearing Plans we confirm the following minor amendments have been made: 1. Inclusion of bio-retention basin, pad mount transformer and Block 2 to bulk earthworks; and 2. Estimated extent of clearing in Resort Drive verge has been included within site clearing plans to account for path and cross-over works. Please also find attached a copy of the updated Vegetation Management Plan prepared for Precinct F and E2 for your reference. This document has been clearly referenced for all tree retention requirements. Council has a copy of this document as part of the Precinct E2 operational works approval request. Kind Regards, Henry Morgan Director BE MIEAust CPEng RPEQ NPER MORGAN CONSULTING ENGINEERS T: 07 3369 8411 | F: 07 3369 1893 | [email protected]<mailto:[email protected]> 1 Great George Street Paddington QLD 4064 | www.morgance.com.au<https://apac01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.morgance.com.au%2F&data=02%7C01%7C[email protected]%7Cf8ca14679fa0402c400508d588a5fe71%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C636565171046946614&sdata=hlgj9Np6A1ul8TLroUmFMPTLlF%2BdwmKF%2BrFw%2FWrfF2U%3D&reserved=0>
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW17/0123 - Precinct F - Noosa Springs, Noosa Heads - Amendment to Bulk Earthworks and Site ClearingRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
- MSG
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.