Original source · versioned page text
2014-05-20 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 20 MAY 2014 EXECUTIVE SUMMARY Not applicable. RECOMMENDATION That Council approve Application No. OPW13/0830 for a Development Permit for Operational Works – Earthworks and Stockpile for Repairs situated at 26 Exhibition Street, Pomona in accordance with the following Conditions of Approval: 1. The applicant must provide a “Flood Impact Assessment” of the filling placed on site. *(Refer to Advisory Note) The assessment must: (a) be prepared by a suitably qualified professional engineer, (b) clearly indicate the extent of any off-site impacts, and (c) should the assessment conclude that off-site impacts will occur, make recommendations on the necessary remedial works 2. The applicant must undertake any necessary remediation works included in the recommendations of the required “Flood Impact Assessment”. 3. The applicant must provide a landscape rehabilitation plan, based the findings of the “Flood Impact Assessment”, that provides compensatory habitat along the batters of the fill to offset habitat lost. The compensatory habitat must provide habitat features for local threatened frog species. 4. The landscape rehabilitation plan must be submitted to Council for approval within 2 months of this notice. 5. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works: (a) Earthworks; (b) Landscaping and/or rehabilitation 6. All unsuitable materials and other waste must be removed from the fill. 7. All fill and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. 8. The batters of the existing fill must be re-graded such that that are a maximum grade of: (a) 1 in 6 where in proximity to waterbodies (b) 1 in 4 for grassed areas (c) 1 in 3 for planted areas 9. No further filling, excluding the repairs to the existing surface, is to be undertaken on the site without Council approval. 10. No further disturbance of the riparian vegetation, unless for ecological restoration works, is to be undertaken on the site without Council approval. 11. All stockpiles of fill material must be located above the 1%AEP flood level. 12. All exposed or disturbed surfaces must be suitably stabilised as soon as is practicable after works have been completed. *(Refer to Advisory Note) 13. Where damage occurs to any council asset as a result of the development works, it must be repaired immediately where it creates a hazard that presents risk to person or property. Other damage must be repaired prior to completion of works. 14. All works must be completed within 12 months from the date that this permit takes effect. Page 36 of 143
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.