PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   20 MAY 2014




                                                                 Page 72 of 143

Document No: "[Click to insert document #]"
                                                                                                                                      Revision No: 001
                                                                                                                            Effective date: 6 March 2014
                                                                                                                        Next Review Date: 30 May 2014
  Unitywater                                                    :                     :               :                              *     Critari
       ¥                                                Interim Connections                     Policy — Schedule 1: Criteria

                                                                      a previous stage;
                                                                  e   Any matter required to be assessed under a condition imposed on a previous stage.
                             New sewerage Connection or the | First Stage
                             Alteration or disconnection of an)   |   The availability of relevant infrastructure to service the land;
                             existing sewerage Connection.
                                                                  e   The demands generated       by the   use or the proposed      use,  including  the
                                                                      biological/chemical loads;
                                                                  e«  The existing and planned capacity available in the relevant network and the impacts
                                                                      of the demand on the standards of service;
                                                                  e   Any constraints affecting the Connection of infrastructure and the provision of the
                                                                      relevant service to the land or the supply of the relevant level of service to other
                                                                      customers;
                                                                  e   If works design plans included in the application — the technical feasibility of the
                                                                      engineering design and its compliance with the SEQ WS & S Design and
                                                                      Construction Code;
                                                                       Note: s. 99BRAG of the Act also requires applications to be assessed against the SEQ WS & S Design
                                                                       and Construction Code.
                                                                  Subsequent Stages
                                                                  e   As for first stage to the extent the matter has not already been assessed in the first or
                                                                      a previous stage;
                                                                  e   Any matter required to be assessed under a condition imposed on a previous stage.

 Copyright © Unitywater                                                                                                               Page 19 of 26
Printed copies are uncontrolled
                                                                                                                                                 Page 72 of 143
Log in to download the original file

2014-05-20 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.