PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 20 MAY 2014
Page 79 of 143
Document No; "[Click to insert document #]"
Revision No: 001
@ Effective date: 20 February 2014
Next Review Date: 20 February 2016
Unitywater . : : I
ra Interim Connections Policy — Schedule 3: Amendments
Table 6 - Amendments of conditions of Water Approvals
Step Connections Policy Provision
Amendments of | How to request an amendment of a condition
conditions SNe aah ¢ Do all of the following:
Approvals
o Complete the Unitywater approved application form (available on Unitywater’s website at www.unitywater.com),
including supplying the plans and other information specified in the form;
o Pay the fee stated in Unitywater’s Fees and Charges Schedule;
o Provide written confirmation that the change sought does not result in the Water Approval becoming a different
category of approval to that which the original Connection application related (e.g.. that a Standard Connection Water
Approval remains a Standard Connection Water Approval);
o If the Applicant is not the owner of the land related to the Connection, provide the land owner's written consent to the
application.
Note; This also includes the written consent of land owners related to the Connection e.g. the nearest suitable sewerage main may be located on an
adjoining private property and work will need to be carried out to this main to provide the Connection. The written consent of this land owner is also
required to accompany the application.
What will the application be assessed against?
*« The amendment request application will be assessed against the same Connection Criteria as the category for the
original Connection application, to the extent the Connection Criteria are relevant to the request (see Schedule 1:
Criteria);
« However, to remove any doubt, the amendment request application will be assessed against the Connection Criteria in
place for the relevant category of Connection at the date when the amendment request application is made.
What is the timeframe for deciding the amendment request?
Copyright © Unitywater Page 26 of 28
Printed copies are uncontrolled 79 of 143See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.