Part 3 - A - Information Response

Attached to the e-mail OPW20/0117 - Information Response - 37 Mossman Court Noosa Heads.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Tuesday, 6 October 2020

Our Ref: 20153 / Office: Sunshine Coast
Council Ref: OPW20/0117

       NOOSA COUNCIL
       PO BOX 141
       TEWANTIN QLD 4565

       ATTENTION: Mark Lewis

Dear Mark

INFORMATION RESPONSE


37 MOSSMAN CRT, NOOSA HEADS
LOT 83 N21847

Further to your information request for the abovementioned development application we now respond
to all of the information requested.
1. Council has some concerns with the proposed retaining wall replacing the existing revetment wall.
   The proposed wall appears to be significantly higher than the original revetment wall that stood
   approximately 500mm above the beach profile and there is some concern with the new wall being
   sufficient to cater for the expected loadings form tidal and flood waters.

At this location, Council has advised that the original revetment wall level is RL0.9m (AHD). In this
immediate area, the original revetment wall boundary is completely covered with sand and not visible.
The wall currently lies beneath the rock edging and grassed area evident in Figure 1.




                                          Subject Site




                             Figure 1: Foreshore in Mossman Court area
Log in to download the original file

Part 3 - A - Information Response.pdf · 859 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 3 pages

Page 2

In this location, the sand leading up to the wall is much higher than typically found in other areas so the
original revetment wall does not sit 500mm above the sand height as suggested by Council. The images
below show the location of the revetment wall at nearby properties confirming that the sand level is
much higher up the original revetment wall and in some cases, completely covers the top of the wall.


      Masonry wall built off the
      top of the revetment wall


                                                          Top of original
                                                          revetment wall


                                                                                 Scouring to base of
                                                                                 wall




                     Figure 2: Original wall on nearby property in Mossman Court




    Just visible top of                                                            Top of original
    revetment wall with                                                            revetment wall
    masonry wall above                                                             covered by sand




                                                                  Scouring to base of wall



                  Figure 3: Original wall on other nearby properties in Mossman Court

It is evident that the tidal levels come right up to (and above) the top of this original wall level and
evidence of scouring is also noticeable. It seems that many properties in the area have built additional
masonry walls above this to keep the adjoining property safe from tidal inundation. With HAT at
1.08m (AHD) this evidence shows that the tides come over the height of the revetment wall at RL 0.9m
AHD.

Page 3

The amenity of this area would suggest that a higher boundary wall would be deemed necessary for
the very protection of the property against the tidal levels. Our client has agreed to lower the height
of the proposed new wall to an RL of 1.3m AHD (see attached plans). This level is 220mm above HAT
but will ensure that the property is protected from the higher tides similar to the nearby properties
that have built even higher masonry walls above the original wall for this protection.

In relation to the proposed wall being suitably designed, the engineer’s certificate included with the
application documents, includes statements in relation to the design of the wall being suitable for
flood, tidal conditions and expected use. Please refer to “Certification of design of prescribed tidal
work” dated 7 July, 2020 signed by Sean Richardson which is attached for your convenience. In
addition, we attached a Form 15 that has been provided by the engineer with the amended plans.


2. The design plan 30153-J7 includes detail of a “boat tie post” but the location and number of boat
   tie posts is not clearly indicated on the site and section plans.

Please find attached amended plans showing the location of the “boat tie post” locations (noted as P3
on the jetty framing plan) as requested.


We trust that we have provided sufficient evidence for Council to agree that our client’s proposal is
suitable for its purpose and suitably meets with Council requirements. Our client is also happy to meet
with Council on site if they believe that this would give them further insite into the proposal. Please let
me know if you wish to organise such a meeting.

We do not believe that it is in the interest of any of the involved parties for a refusal to be issued on this
Development Application. Rather, should Council wish to discuss this matter further or have any further
questions, please contact me in the first instance.

We also wish to advise Council that as advised by SARA we have had to request Owner’s Consent from
Department of Natural Resources, Mines & Energy for the proposed new boundary wall and Department
of Environment & Science for the proposed new jetty. Once we have the letter for owner’s consent in
both instances, SARA will in a position to process the referral response for this application.

Should you have any questions with respect to the above, please do not hesitate to contact me direct.

Yours faithfully
PROJECT URBAN



Trish Belt
Licensing & Permits Officer
Email: [email protected]

Cc:- David & Louise Hales

Page 4

      ATTACHMENT 1
Amended proposal plans

       ATTACHMENT 2
     Engineer’s Form 15


[OCR of page images]
ATTACHMENT 1

 

Amended proposal plans

ATTACHMENT 2

 

Engineer’s Form 15

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.