Council archive · source document
DA Form 1, Plans, Form 15, Council Breach Letter · OPW22/0076
Attached to the e-mail Operational Works Application OPW22-00XX 3_5 Sunseeker Close Noosaville Boat lift application.msg.
Plans and drawings: the text below has words only, no drawings.
10. The jetty is to be used for private purposes only with no commercial operations to be undertaken. 11. Boat repair activities will not be permitted on site. 12. Wastewater and sullage shall only be disposed of at approved pumpout facilities. 13. The mooring facility shall not be utilised for live-aboard purposes. 14. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 1997. 15. The approval or conditions do not constitute a ruling on structural safety and the applicant must make their own arrangement to ensure adequacy of design and work. Also any approval granted does not warrant that such plans and specifications have been checked in detail, nor does not warrant that such plans and specifications have been checked in detail, nor does it absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works. The Council does not accept any responsibility for the accuracy of such plans and specifications as approved. 16. Certification by a Registered Professional Engineer of Queensland that states that the jetty is constructed in accordance with best practice methods and is structurally sound shall be submitted to Council prior to the return of any bond monies held by Council. A final inspection and approval of the structure by Council’s Inspector is also required prior to the return of any bond monies held by Council. Please contact Council’s Land Development Section to arrange the inspection. 17. This approval lapses where the construction of the jetty has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension. 18. The jetty shall be licensed with the Council upon completion of the structural work and shall be licensed annually thereafter. Yours faithfully, Danie! Gallagher PLANNING OFFICER Award Winner - Australian Clean Beach Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DA Form 1, Plans, Form 15, Council Breach Letter.pdfRelated documentApplication case desk ↗
BRW30C9ABB037AA_000332.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.