INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

 

 

the IP Regulation. 18.__ An. application. may_trigger. referral-to-the-local-government-as-the-concurrence-agency-if-the building work—|

Assessment period 5 days, No response Is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.

Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedule 2 table 1 of been completed.

the IP Regulation,

Assessment period 15 days. No response is a

deemed refusal.

Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the

services building work

For more information go to schedule 2 table 1 of ¢ — complies with the performance criteria of the Queensland Development cade part 15; and

the IP Requlation and the QDC part 15. ¢ the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusall.

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residentiat

For more information go to schedule 2 tabla 1 of Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

the IP Regulation and the QDC part 20. referral to the local government as the concurrence agency.

Assessment period 15 days. No response is a

deemed refusal,

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of

the IP Regulation,

Assessment period § days. No response is a

deemed refusal.

Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

designated rainwater tank area
For more information go to schedule 2 tabte 1 of
the IP Regulation and the QDC part 25.

Assessment period 15 days. No response is a
deemed refusal

 

building work or structure complies with the relevant performance criteria if -

e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

« Under the Queensland Development Code, part 25, the rainwater tank does not include an
acceptable solution for a relevant performance criteria.

 

Page 16

 

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0255 - MCU - Detached House [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.