Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Stormwater Management Plan · MCU18/0019

Attached to the e-mail Multiple Housing Type 3 - Retirement & Special Needs (Aged Care Facility (Proposal Plans Part 4) - MCU18/0019.

of 39

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
SC7440 – Goodchap St, Noosa                                                                            11




4.3.2   Catchment Areas
The subject site has been modelled in its existing pre-development and proposed post-development states
with the catchment areas illustrated in Tables 4.1 & 4.2 and Appendix A. In its pre-development state the
subject site was modelled as one hydrologic node to replicate the existing sheet flow situation for the lot.
XP-STORM model outputs are included in Appendix C of this report.


                 Node                     Description              % Impervious      Area (Ha)

                                           Landscape                      0             0.512
                 ‘PRE’
                                              Roof                      100             0.162

                              Total Catchment (ha)                       24             0.674
                         Table 4.1 - Pre Development Node Sub-Catchment Areas


                 Node                      Description            % Impervious       Area (Ha)
                ‘TANK’                        Roof                     100             0.400
                                     Carpark/hardstand areas           100             0.085
                                           Landscape                    0              0.189
                          Total Catchment (ha)                          72             0.674
                          Table 4.2 - Post Development Sub–Catchment Areas

4.3.3   Roughness Coefficients
The conduits and links used within the model are based on the ultimate design scenario for the internal
roadways and overland flow paths. Mannings “n” roughness coefficient values are specified as 0.014 for
RCP pipes and 0.011 for uPVC pipes.


For overland flow within the sub-catchment areas a Mannings “n” value of 0.014 for concrete areas and
0.045 for vegetated areas was adopted.


4.3.4   Storm Events
Storm patterns were setup using Australian Rainfall and Runoff storm patterns for Area 3 with intensity
frequency duration data taken for the local area. Storm durations of 10, 15, 20, 25, 30, 45, 60 and 90
minutes were investigated for the pre and post developed scenarios.

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.