Skip to the record
For the highest quality transcripts.

Council archive · source document

Stormwater Management Plan · MCU18/0019

Attached to the e-mail Multiple Housing Type 3 - Retirement & Special Needs (Aged Care Facility (Proposal Plans Part 4) - MCU18/0019.

of 39

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
SC7440 – Goodchap St, Noosa                                                                    25




Site Location: Noosa
DURATION        1 Year    2 years      5 years    10 years   20 years   50 years   100 years
5Mins           130.00    165.00       202.00     224.00     253.00     291.00     320.00
6Mins           122.00    155.00       190.00     210.00     238.00     274.00     302.00
10Mins          100.00    127.00       156.00     173.00     197.00     227.00     250.00
20Mins          73.70     93.50        116.00     128.00     145.00     168.00     185.00
30Mins          60.20     76.50        94.70      105.00     119.00     138.00     152.00
1Hr             40.60     51.90        64.90      72.40      82.60      96.10      106.00
2Hrs            26.00     33.40        42.60      48.10      55.40      65.10      72.60
3Hrs            19.60     25.40        33.00      37.50      43.50      51.50      57.70
6Hrs            12.10     15.80        21.10      24.40      28.70      34.40      39.00
12Hrs           7.65      10.10        13.80      16.20      19.20      23.30      26.60
24Hrs           5.04      6.69         9.30       11.00      13.10      16.10      18.50
48Hrs           3.35      4.47         6.28       7.45       8.96       11.00      12.70
72Hrs           2.53      3.39           4.81       5.75      6.94      8.60       9.94
                            Table C.1 - IFD Date Sourced from BOM (Noosa)


[OCR of page images]
$C7440 — Goodchap St, Noosa

 

 

Site Location: Noosa

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DURATION 1 Year | 2 years 5 years 10 years | 20 years | 50 years 100 years
5Mins 130.00 | 165.00 202.00 224.00 253.00 291.00 320.00
6Mins 122.00 | 155.00 190.00 210.00 238.00 274.00 302.00
10Mins 100.00 | 127.00 156.00 173.00 197.00 227.00 250.00
20Mins 73.70 | 93.50 116.00 128.00 145.00 168.00 185.00
30Mins 60.20 | 76.50 94.70 105.00 119.00 138.00 152.00
1Hr 40.60 | 51.90 64.90 72.40 82.60 96.10 106.00
2Hrs 26.00 33.40 42.60 48.10 55.40 65.10 72.60
3Hrs 19.60 | 25.40 33.00 37.50 43.50 51.50 57.70
6Hrs 12.10 15.80 21.10 24.40 28.70 34.40 39.00
12Hrs 7.65 10.10 13.80 16.20 19.20 23.30 26.60
24Hrs 5.04 6.69 9.30 11.00 13.10 16.10 18.50
48Hrs 3.35 4.47 6.28 7.45 8.96 11.00 12.70
72Hrs 2.53 3.39 4.81 5.75 6.94 8.60 9.94
Table C.1 - IFD Date Sourced from BOM (Noosa)

 

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.