Council archive · source document
Development Application part 1 of 2 Application forms 2 · OPW11/0281
f2 f^E ^r^r f J'. '1 JCE
SCRC '.;';
Place barcode here IIIIIIIIIIIIII^III!V IIIIII^^^IIIIIN
IIIIIIIII
500468 ^ 4
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part I Of Z
Application number: . Y^o ( I
ktopWufti Pan Rel ord Cover Shea !a!!JCT 6 L40 0 OJ e w
Lint 9nd 1 L
a aluno3 1uawd0jan9a
2SO► O 10
af.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 20 pages
Page 2
CadCon
"Successful Projects Start with the Right Advice"
Tuesday, 161h August 2011
Our Ref: 094787
Council Ref: 2010/515
The Chief Executive Officer
Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre, QLD 4560
RE: OPERATIONAL WORKS APPLICATION - ACCESS, STORMWATER AND EROSION &
SEDIMENT CONTROL, 2 & 4 DELORME STREET (LOTS 126 & 127 ON RP160425) AND 28
& 30 WYANDRA STREET (LOTS 51 & 52 ON RP139776), NOOSA HEADS
Dear Sir,
We write on behalf of our client, Charter Keck Cramer, in lodging this Application for an Operational
Works Permit (Access, Stormwater and Erosion & Sediment Control) over land located at 2 & 4
Delorme Street (Lots 126 & 127 on RP160425) and 28 & 30 Wyandra Street (Lots 51 & 52 on
RP139776), Noosa Heads.
On 21 July 2010 Council issued a development approval for a Development Permit for a
Reconfiguration of 4 lots into 2 lots (2010/515).
Please find attached the following documents comprising an application for Operational Works as
required by the above approval and ancillary documentation:
Operational Works Application
• Application fee totalling of $3035 in accordance with the Regulatory Fees 2011/12:
o Works relating to ROL $1589
o Increment $475/lot i.e. $950
Unity Water $134 (sewer) and $114 (water) per lot i.e. $496
• Signed Owner's Consents (one copy).
• IDAS Application Forms 1 and 6 (one copy each).
• Operational Works drawings 10-0895-01 to 06 prepared by Lindsay Consulting Pty Ltd (five
copies). These drawings include a Construction Management Plan and Erosion and Sediment
Plans.
Ancillary Information
• Lindsay Consulting Statement of Compliance.
• Lindsay Consulting Estimated Schedule of Quantities.
a The Estimated Schedule of Quantities is significantly below $80,000 therefore
QLeave is not payable at this stage.
• Telstra pre-provisioning certificate.
• Energex pre-provisioning certificate.
We trust this information is sufficient for your purposes. Should you require any further information
please contact John Gillespie on 07 5479 5311.
Yours Faithfully, Development Counter
17 AUG 2011
John Gil s ie, Managing (rector
Licensed Surve & Certified Pr ctising Pl RrOOChydOre
Cadcon provides boundary surveys, contour & detail surveys, construction surveys, town planning applications, liaison & negotiation with
architects, engineers, Councils & Government, we can coordinate and manage your property development from start to finish.
cPP C' I %. -1] PID11
•^ Moroocnrdore
a chow er a
CoTmefce
Page 3
fro
Telstra Property
25 March 2010 Level 34, 242 Exhibition Streel
Melbourne VIC 3000
Telephone 03 8647 3994
lmoll:
co!ly_osuanri IggP],!4j1SfLc9ro
Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre
Qld 4560
Sent via email: [email protected]
Dear Sir / Madam
Re: Telstra Corporation Limited (Telstra) Proposed Subdivision - Part Noosa Heads TE
& CMTS
Property: Proposed Subdivision of Lots 126 & 127 on RP160425 & Lots 51 & 52 on RP139776 -
Cnr.
Delorme & Wyandra Streets, Noosa Heads QLD
We refer to the above matter and advise that as registered proprietor of the land, Telsira
Corporation Limited hereby grants authority to Cadcon Surveying & Town Planning
(Consulting Surveyors) to lodge Applications with Sunshine Coast Regional Council and
attend meetings & discussions in regard to seeking a Development Permit for the
reconfiguration of four (4) lots into two (2) lots on our behalf.
I trust the above advice is sufficient for your purposes. If you have any further
queries, please contact myself or Nick Ashton of Charter Keck Cramer on direct
line 03 9425 5525, mobile 0413 778 700, or via email at
[email protected] sincerely
Telstra Corporation Limited
Carly Osborne
Leasing Manager
Telstra Property
Telstra Corporation IJmite
ABN-33 051 775 556
Page 4
Dated 2005
Power of Attorney
Telstra Corporation Limited
("Principal")
in favour of
General Manager Real Estate &
Accommodation Management;
Manager Divestment & Freehold
Acquisitions;
Leasing Manager;
Senior Client Relationship Manager
(Real Estate & Accommodation
Management);
National Property Services
Manager;
Manager Strategic Planning
Network Accommodation; and
Property Services Manager
(each an "Attorney")
708678956
$105.60
23/03/2005 15:0i
BE 804
Page 5
Power of Attorney
Date: 2005
Party: TELSTRA CORPORATION LIMITED (ACN 051 775 556) having
its registered office at 41/242 Exhibition Street Melbourne Victoria
3000 ("Principal")
Operative provisions:
1 Appointment
The Principal appoints each person who holds an office specified in
Schedule I (each an "Attorney"), or any person holding or fulfilling
the duties of one of those offices from time to time, jointly and each of
them severally to be its attorney until notice of revocation of this
Power of Attorney shall be received by the Attorney.
2 Power and authority
The Attorney may do in the name of the Principal and on its behalf
everything necessary or expedient to:
(a) enter into and to sign, seal, deliver, execute or accept the
documents described in Schedule 2 (each a "Document") and
any document ancillary to a Document;
(b) enter into and to sign, seal, deliver, execute or accept any other
documents or do any other acts which are referred to in the
Documents or which are ancillary or related to them or the
transactions contemplated by them, in the absolute discretion
of the Attorney; and
(c) complete blanks and make amendments, alterations and
additions to the Documents (including, without limitation,
changing the parties' names in the Documents), which are
considered necessary or desirable by the Attorneys.
Ratification
The Principal declares that all acts, matters and things done by the
Attorney in exercising powers under this power of attorney will be as
good and valid as if they had been done by the Principal and agrees to
ratify and confirm whatever the Attorney does in exercising powers
under this power of attorney.
4 Indemnity
The Principal indemnifies the Attorney against liability, loss, costs,
charges or expenses arising from the exercise of powers under this
power of attorney.
Page 6
5 Third Party Reliance on Attorneys
The Principal acknowledges that any person (including, but not limited
to, a fine, body corporate, unincorporated association or authority and
including the Registrar of Titles of Western Australia or any other
registration authority in Australia or elsewhere) dealing in good faith
with any Attorney or a person purporting to be an attorney under this
power, is:
(a) entitled to rely on execution of any document by that person as
conclusive evidence that:
(i) the person holds the office set out in the power;
(ii) the power of attorney has come into effect;
(iii) the power of attorney has not been revoked; and
(iv) the right or power being exercised or being purported
to be exercised is properly exercised and that the
circumstances have arisen to authorise the exercise of
that right and power.
(b) not required to make any enquiries in respect of any of the
matters set out in paragraph (a).
6 Duration
This Power of Attorney shall continue to operate and be effective until
expressly revoked.
7 Attorney's personal liability
The exercise by an Attorney of the powers and authorities conferred by
this deed does not involve any assumption by that Attorney, or any
body in which he or she is a partner or employed, of personal liability
in connection with the exercise of the powers and authorities or the
consequences of so doing.
8 Registration
The Principal shall, if necessary, register this deed wherever required
to give effect to its terms. If the Principal fails to do so, the Attorney
may register this deed and claim reimbursement from the Principal of
any costs reasonably incurred in doing so.
9 Revocation
The Power of Attorney dated 11 February 2002 is revoked with effect
from the date which is three months after the date of this deed.
Page 7
10 Governing Law
This deed is governed by the laws of the State of Victoria.
EXECUTED as a deed
[OCR of page images]
10 Governing Law
This deed is governed by the laws of the State of Victoria.
EXECUTED as a deed
Page 8
Schedule I
Attorney
General Manager Real Estate & Accommodation Management
Manager Divestment & Freehold Acquisitions
Leasing Manager
Senior Client Relationship Manager (Real Estate & Accommodation Management)
National Property Services Manager
Manager Strategic Planning Network Accommodation
Property Services Manager
Schedule 2
Documents
1 Any document relating to:
(a) property;
(b) any estate or interest in property; or
(c) the granting or obtaining of any licence in respect of property (together "property
dealings")
to effect any transaction relating to property dealings either within any part of Australia or
outside it which the Principal could enter into or execute in its own name, including:
To purchase any property by any means, for any price and on any terms;
To sell any of the Principal's property by any means, for any price and on any terms;
To grant options to sell any of the Principal's property, for any price and on any
terms;
To grant or take a licence over property or any estate or interest in property;
To mortgage all or any of the Principal's property and to grant any other security
over that property, in each case, on any terms;
(i) To give any discharge or partial discharge of any mortgage where the Principal is the
mortgagee;
(1) To lease or let any property, to grant sub-leases and to surrender or accept the
surrender of any lease or sub-lease in which the Principal is interested as landlord or
tenant, in each case, on any terms;
(k) To exercise any power or discretion (whether express or implied) which at any time
is vested in or conferred on the Principal under any contract or as landlord or
mortgagee;
Page 9
(1) In relation to any of the Principal's property:
to accept service of any legal process;
to represent the Principal in any legal proceedings of any nature;
to commence any actions or legal proceedings;
to submit any claims or disputes to mediation or arbitration;
to compromise any claims or disputes; or
to agree to any scheme of arrangement or compromise;
(m) To apply for and take up any lease or licence of any kind, and convert land held
under any lease or licence into land held under a different tenure;
(n) To grant, transfer or acquire easements or other rights over any land and to dedicate
any land to the public;
To enter into agreements granting access or permitting access over any property;
To effect a merger of any estate or interest in property;
To apply for any consents, licences, permits or approvals in respect of the use of any
property; and
(r) To sign any transfer or other instrument, to sign any caveat or withdrawal of caveat,
to lodge or register any document, to make any application to the Registrar of Titles
or to make any statutory declaration that may be required.
2 Any document to enable title to property or any estate or interest in property or any licence
in respect of land to be transferred to, acquired by, vested in, or reserved for the Principal to
be registered in the name of the Principal in accordance with the provisions of any statute
for the time being in force enabling title to property or any estate or interest in property or
any licence in respect of property to be registered.
3 Property means, for the purposes of schedule 2, all real property of any nature and includes
the Principal's present and future land and interests of every kind held under the Transfer of
Land Act 1893 (WA), the Land Administration Act 1997 (WA) and the Strata Titles Act
1985 (WA).
Page 10
EXECUTED by TELSTRA
CORPORATION LIMITED in
accordance with section 127(1) of the
Corporations Act 2001 (Cwlth) by
authority of its directors:
Signature of ctorJcompany
secretary
pou&o C N C r0091E...... ............................................................
Name of director (bl k letters) Name of difee er/company secretary
(block letters)
Page 11
Integrated Development Assessment System form
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details - IDAS form 1)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Charter Keck Cramer
Name/s (individual or company name in full)
c/- CadCon Surveying & Town Planning
For companies, contact name John Gillespie
Postal address PO Box 5774
Contact phone number (07) 5479 5311
Mobile number (non-mandatory)
Fax number (non-mandatory) (07) 5479 1289
e-mail address (non-mandatory) [email protected]
1. What is the nature of development proposed? (tick all applicable boxes)
q material change of use of premises
q building work
® operational work
q reconfiguring a lot
QPlarr Queensland
Government
0
Page 12
2. What type of approval is being sought?
® development permit
q preliminary approval
q both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
® No
q Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
Lot No
No.
No. No. suburb/locality name code and plan no.
388 &
1 Wyandra Street, Noosa Heads 4558 & RP139776 SCRC - Noosa Shire
Street address / lot on plan
52
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
2 2&4 Delorme Street, Noosa Heads 4567 126 & RP160425 SCRC - Noosa Shire
Street address / lot on plan
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Easting Northing Latitude Longitude
q GDA94
q WGS84
1
q other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
2404 m2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
Single Building (Telephone Exchange)
Appl.:,! : n Deter':. - IDAS form 1
Version 1.0 18 December 2009
Page 13
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Operational Works (Access, Stormwater and Erosion & Sediment Control)
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
q No
® Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
Table E
Name of owner/s of the land Australian Telecommunications Commission
® The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
By making this application, I, the applicant, declare that the owner has given written consent to the making of
q the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
on strategic port land under the Transport Infrastructure Act 1994 - complete table I
in a tidal water area - complete table J
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
® No q Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Apple:.;!,: n Det.3, :, IDAS form 1
Version 1.0 18 December 2009
Page 14
12. Does the proposal include new building work or operational work on the premises? (including any
services)
q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
® No - Go to question 15 q Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
® No
q Yes - provide details below
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
1 IDAS Form 6 over the counter
2 Cover letter and Appendices over the counter
17. Applicant's declaration
® By making this application, I declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
Applre:: %i: Dr>f:ris IDAS form I
Version 1.0 18 December 2009
Page 15
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.qleave.qld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.gld.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
coil ?ctPd will he retained ac required by the Puklic Records Act 2002.
OFF Ic &Yc ; meet Counter
Dat received
17 erence numbers oQ' %\ 0 2% \
NO IFICATI O[W A_rRI ATE CERTIFIER
Council. I have been engaged as the private certifier for the
To:
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
pplication Details - IDAS form 1
Version 1.0 18 December 2009
Page 16
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
1
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
Applicati rr Details IDAS form 1
Version 1.0 18 December 2009
Page 17
Integrated Development Assessment System form
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Applicant details - IDAS form I
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
q building work - complete table A ® operational work - complete table B
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
® road works ® stormwater q water infrastructure
q drainage Works q earthworks q sewerage infrastructure
q landscaping q signage q clearing vegetation under the planning scheme
® other - please specify below
Erosion & Sediment Control
What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)
® development permit q preliminary approval q both - specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
q No ® Yes - specify the number of lots being created
2
Department of Infrastructure and Planning QPlan Queensl a nd
`_,^^ Government
Page 18
I
Are there any current approvals associated with this application? (e.g. material change of use)
q No ® Yes - provide details below
List of approval reference/s Date approved Date approval lapses
1 2010/515 21 July 2010 21 July 2014
2. What is the dollar value of the proposed building work? (inc GST, materials and labour)
Buddin(I and operational wcnk ,assessable against a pl,,1 1
!lq scheme - IDAS form 6
Version 1.0 18 December 2009
Page 19
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
Method of lodgement
of lodgement
All applications for operational works
site plans drawn to scale which show the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, ® confirmed over the counter
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
• any existing or proposed easements on the relevant land and their
function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents confirmed over the counter
relevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works q confirmed
• the location of any proposed retaining walls on the relevant land and
their height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
• information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed confirmed over the counter
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
ial work assessable sgawst a plr,ru^rn^^ s^ ht vi cw - IDAS form 6
Version 1.0 18 December 2009
Page 20
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and
easements q3 confirmed over the counter
• manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments fl confirmed
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages confirmed
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices q confirmed
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
plane. m: ^, Jiemr - IDAS form 6
Version 1 0 18 December 2009
Page 21
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving public utility services
drawings showing:
• any existing light poles and power poles
• any existing underground services qconfirmed
• details of proposed services
• alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and qconfirmed over the counter
garden edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details
Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFTCFUS-
Develop Ment r
D ate Received Reference Numbers Q Fw '1^ 028 ^
The Sus^a r bl P1a nin ct 2009 is administered by the Department of Infrastructure and Planning. This form and
all oth r = fr^pr I lterials sh&uld be sent to your assessment manager and any referral agencies.
j),, urrr^r^ hriuc - IDAS fon11 6
Version 1.0 18 December 2009
Used in these records
Development Application part 1 of 2 Application forms 2Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.