Skip to the record
The gold standard in government transparency.

Council archive · source document

Development Application part 1 of 2 Application forms 2 · OPW11/0281

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                           Confirmation
                                                                                            Method of lodgement
                                                                           of lodgement
Applications for operational works involving public utility services
drawings showing:
• any existing light poles and power poles
• any existing underground services                                        qconfirmed
• details of proposed services
• alternation to existing services

Applications for operational works involving landscaping works
drawings showing:
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes
    and numbers of plants
• planting bed preparation details including topsoil depth, subgrade
    preparation, mulch type and depth, type of turf, pebble, paving and    qconfirmed        over the counter
    garden edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details

Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
  against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
  mentioned, take it to mean the land use plan for the airport land.


Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.


OFFTCFUS-
  Develop Ment                        r
D ate Received                         Reference Numbers        Q Fw '1^ 028 ^



The Sus^a r bl P1a nin      ct 2009 is administered by the Department of Infrastructure and Planning. This form and
all oth r = fr^pr I             lterials sh&uld be sent to your assessment manager and any referral agencies.




                                                                                          j),, urrr^r^ hriuc - IDAS fon11 6
                                                                                           Version 1.0 18 December 2009

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 1 of 2 Application forms 2.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.