Council archive · source document
Landscaping plan 22332_OPW[A] · OPW22/0207
Plans and drawings: the text below has words only, no drawings.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
DRAWING SCHEDULE
22332 CD-000 COVER SHEET
22332 CD-001 SPECIFICATION NOTES
22332 CD-100 PLANTING PLAN
22332 CD-101 PLANTING PLAN
22332 CD-200 CONSTRUCTION DETAILS
CD-100 CD-101 PLANTING SCHEDULE
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/
/
/
/
/
/
/
/
/
/
/
/
/
S
/
S
/
/
S /
S S S S
/
/
/
/
/
/
/ / / /
/
/
/
/
/
S
/
/
/
/
/
S
/
/
/
/
/
/
/
/ / /
/
/
/ / /
/
/
S
/
/
/
S
/
/
/
/
/ / /
/
/ / /
/
/
/
S
/
/
/
S
/
/
/
/
/
/
/
/ / / / / / / / / / / / /
/
S
/
/
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
S
S
CONTEXT PLAN
MATERIALS & FINISHES SCHEDULE
CODE / ITEM REQUIREMENTS
Turf Type 1 (T1) A-Grade Couch 'Wintergreen' Laid as per detail shown on CD-200.
Garden Bed Type 1 Internal grade typical, 300mm depth amended site or imported topsoil to
(GB1) specification, cover with 100mm thick Organic Forest Chip Mulch, refer to detail
CD-200.
Bio Basin (GB2) Mulch to be 100mm thick coarse straw / sugar cane mulch with minimal fines.
Bio Basin Batter Mulch to be 100mm thick coarse straw / sugar cane mulch with minimal fines.
(GB3) Secure with jute mesh netting. Pin twice recommended rate to prevent the mesh
from lifting.
Gravel (GRA) 100mm depth Mary River gravel 35-25mm.
Revision Date Amendment Drawn Checked
APPROVAL ONLY
COVER SHEET NOT FOR CONSTRUCTION
A 17.08.2022 For Approval XL CS
CD-000 scale: 1:300@A1; 1:600@A3
9 KAURI STREET, COOROY
TH
NOR
JOB NUMBER: 22332 CLIENT NAME: SUNSHINE GROVE PTY LTD.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 sections
Section 2
11. Services
LANDSCAPE NOTES 8. Containerised plant material - supply and installation The location of all underground or overhead services shown on these drawings are indicative only. They have been
EXTENT OF WORKS All planting is to be carried out in a manner consistent with good horticultural practice. All plant stock is to be in accordance with incorporated at the design or Council Approval stage for general information. The Landscape Contractor shall be
the scheduled nomenclature, well formed, hardened off nursery stock. They are to be container grown in potting mixture with a responsible for liaising with the Principal Contractor to determine where the 'As Constructed' location of all water,
Contractor shall allow to carry out items of landscaping as detailed on the Landscape Plans listed on 22332 Cover healthy root system and not pot bound. All pots shall be free of weeds and plant stock is to be free from living insects, pests and sewer, stormwater, electrical,communication or other existing services before commencing any excavation works.
Sheet CD-000. Contractor to ensure they have the latest issue of the documents prior to tendering and construction.
disease. All plants are to be fully sun or shade hardened-off to suit their on-site growing position for a minimum period of 6 weeks.
Contractor should also take full account of documentation of Architectural, Civil Engineering, Hydraulic Engineering 12. Inspection Plan
Contractor shall be responsible for replacing failed plant stock within the 12 month maintenance period. It is therefore
and Electrical Engineering works which will be made available on site. Hard surface layout is to be at the discretion of The Contractor shall co-ordinate the following inspections with the site superintendent.
recommended that the Contractor does not accept below Standard stock from the Nursery/Supplier.
the Project Manager. Where there is conflicting information, contact the Landscape Architect. - "Pre-start" - prior to commencement of works, for setout approval and construction timetable
Ensure sufficient supply of each species shown on the drawings is available to achieve the required layout and densities, and in the confirmation.
Landscape works for this contract are to include the following: - Excavation inspection - at completion of excavation and drainage works and prior to topsoil addition.
event of supply for replacement stock due to failure, damage, unhealthy specimens or theft. Prior to plant stock arriving to site, a
Nursery inspection including the Landscape Architect and Landscape Contractor is required. The plant supplier is to ensure all stock - Pre-planting inspection - at commencement of placement of advanced plant material.
1. Co-ordination with other Trades and conduit installation - Setout inspection - at first setout of containerised plant stock.
2. Removal of Debris (or good selection of stock) is present during the inspection. It is also recommended that the Landscape Architect is on site to
- "On Maintenance" - at practical completion.
3. Excavation and Drainage of planting areas inspect plant stock and plant set out prior to planting.
"Off Maintenance" - 365 days after practical completion.
4. Topsoil - Supply and Incorporation
5. Soil Amendments Plant stock notes:
13. Maintenance of Landscape Works
6. Edging to planting areas - where not already supplied - Container sizes are noted as follows:-
7. Shaping of garden areas - Pots in millimetres. Establishment notes:
8. Containerised Plant Material - Supply and installation - Bags in litres. The Establishment Period commences at the date of Practical Completion of Works. During the Establishment Period
9. Garden Mulch - Supply and Spread - Stock may be rejected if plants are:- maintain best horticultural pratices including (but not limited to) the following items where required: watering,
10. Turf - Supply and lay - Undersized proportional to specified container size or if the root system is underdeveloped. weeding, fertilising, pest and disease control, mulching, pruning, rubbish removal and keeping the site neat and tidy.
11. Services - Oversized proportional to specified container size or severely root bound. Rectify defects that become apparent in the works under normal use.
12. Inspection Plan - Unbalanced or uncharacteristic of normal or specified growth pattern for the species.
13. Maintenance of landscape works (12 months) - Not suitably acclimatised for the specific environment. The Landscape Contractor is to allow for topping up mulch, rectifying defects, top dressing sunken edges, replacing
14. Bio-basin - Diseased, infested with pests or suffering from other form of significant stress. failed or under-performing plant stock at the end of the Maintenance Period. All Council controlled works to be
- Have poor root development or root defects. inclusive of a twelve (12) month maintenance program.
- Substitution of specified plant species only by written instruction from Landscape Architect.
1. Co-ordination with other trades Maintenance and Inspection Program
Contractor is to make full allowance for the reasonable activities of other trades. Where directed by the Principal Implementation notes: Responsibility Weeks after practical completion Maintenance Inspection Frequency
Contractor all must comply with soil and erosion control measures. Contractor shall allow for the installation of Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and management environment of Contractor 0-2 3 per week
electrical services for landscape lighting at the appropriate time in the construction program. Contractor shall pay Contractor 3-4 2 per week
this project. The following minimum is expected:
due consideration to installation of irrigation lines so as to minimise disturbance to planted areas. The coordination Contractor 5 - 13 1 per week
- Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root ball. Break up the base of
of appropriate conduit lines forms part of this contract. Contractor 14 - onwards As per established maintenance regime
the hole to a further depth of 100mm and loosen the sides of the hole.
- Remove the plant from the container with minimum disturbance to the root ball, place in final position, ensure it is central Maintenance Program General Notes
Contractor shall take due care with any machinery to site. Particular care is to be taken with newly poured concrete and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed.
curbing and with newly laid A.C. road surfacing. Any damage to existing structures or services will be rectified at the - Maintenance inspection frequencies are minimum.
- Ensure correct placement of fertiliser requirements such as Nutri-Tech Solutions 'Life-Force Gold' + Life Force Carbon is - Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture
contractors expense. Any disputes will be settled by the site Superintendent. ameliorated into existing or imported topsoil and that any water retention additive and the above fertilisers are installed as levels are critical during early establishment. Avoid over irrigating planting areas.
per the manufactures specification. - Mow turf every 2 weeks.
2. Removal of Debris
- Thoroughly water plants immediately after planting with sea change KFF and at such times during the contract period - Prune and shape all shrubs and trees on a monthly basis as required.
Site is to be cleared and is to remain clear of any deleterious material prior to commencement and throughout
as required. All large stock will require a minimum of 10ltrs of water and smaller stock 5ltrs of water at the time of planting. - Remove all stakes at 90 day inspection, or after satisfactory establishment.
construction of landscape works. Planting areas are to contain planting and selected drainage materials only and are
- Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets. Ensure that - Fertilise all garden beds and street trees at 3 months.
not to contain any building material waste.
topsoil is not placed over the top of the rootball. - Contractor shall maintain an up to date written log book to record inspection observations and actions.
- The log will be made available to the site superintendent, upon request, at any time for examination.
3. Excavation and drainage of planting areas
Break up and remove any asphalt, roadbase material or excess concrete slurry from kerbing works to achieve All tree stock within the landscape works must be healthy, true to form and free of defects:
- Roots should be of good form and free from circling, girdling, J-rooting or other defects/abnormalities. Contractor 14. Bio-Basin
required planting depths. Excavate site soil as required to ensure consistent high quality planting material. Break up Bio Basin filter media to contain 5% organic matter to support plant growth as per Water by Design Guidelines.
existing subgrade to a depth of 300mm. Any excavated planting areas are to be scarified at sides to provide to tease out roots and prune as required to encourage healthy root development. Contractor is not to accept trees
Provide filter media test results to confirm organic content. Plant Macrophytes with pre-soaked water retentive
anchorage for future root development. Additional excavation works will be required in areas of advanced plant which are not of a high quality or grown to best horticultural practice.
material such as coir and slow release plant starter fertiliser. In the absence of regular rainfall, ensure basins are
material. Drainage is to be incorporated to all planting areas that are enclosed by hard edging and not otherwise - All tree stock to be inspected at unloading and prior to planting. Trees that fail to meet the above criteria are not be
watered twice weekly through a 3 month establishment period.
drained. Contractor should allow for drainage to all garden areas. planted and are to be returned to the Nursery/Supplier.
- Collect all empty plant containers daily during planting operations, remove from site and return for nursery to re-use.
4. Topsoil - supply and incorporation - Do not vary the plant locations from those specified on the drawings unless otherwise directed by the
All soils are to comply with AS 4419 Table 1 (both site topsoil and imported topsoil) Superintendent. Should it be necessary to vary the locations and spacing for any reason, immediately apply for
Topsoil for garden areas should be a minimum 300mm depth. Where available maximise the use of soil from on site. directions by the Superintendent. Replace failed or damaged plants. This does not include vandalised or stolen plant
Top soils are to be tested for horticultural suitability and receive appropriate amelioration if required. All topsoil must material - this will be replaced prior to practical completion.
be free from noxious weeds, rocks, roots, nut grass, rubbish or any other deleterious material.
Place all topsoil in the areas directed and specified. Ensure that the topsoil is spread and graded evenly to prevent 9. Garden mulch - supply and spread
any ponding. Prevent excess compaction by construction plant. Stripped site topsoil needs to be stored in piles no All mulch is to be free of deleterious or extraneous matter such as soil, weeds, rocks, and twigs. The finish level of the mulch is to be
greater than 2m high x 3m wide. Topsoil storage piles for storage greater than 4 months should be seeded with a level with the finish level of all adjacent surfaces after settlement allowances of the topsoil and mulch. Ensure all mulch is placed
suitable grass mix. Eradicate weeds using environmentally acceptable methods Project Urban discourages the use of clear of plant stems to avoid rotting at ground level. Mulch is to be coarse chipped forest mulch (a combination of wood, leaves and
Glyphosate and is happy to discuss alternative options with the Landscape Contractor. Noxious weeds need to be bark) with no more than 10% fines nominal 25-50mm size or approved equal. Mulch shall be to a predominant depth of 100mm as
screened out of the topsoil prior to placement. described above. Mulch is to be formed to avoid placement against green plant stems and overflow from purpose formed edges,
kerbs and pathways. Samples of all mulch types to be provided to Landscape Architect for approval prior to installation.
5. Soil Amendments
The Contractor shall allow to amend the garden and podium soil with the following components, to be confirmed by 10. Turf - supply and lay
soils test: Obtain turf from a specialist grower of cultivated turf.
- Nutri-Tech Solutions 'Life Force Carbon' - Spread a 3 - 5 mm layer of Life Force® Carbon™ over garden beds. Turf notes:
Work into the top 10- 15 cm of soil where practical and water in well. Apply 2-3 times a year for best results. Planting - "A" Grade turf as per Material Schedule with a minimum sod depth of 25 mm
New Trees: 1 - 2 cups per tree in the hole. - Turf to be laid within 24 hours of being cut and on day of delivery.
- Nutri-Tech Solutions 'Life Force Gold' - For Landscapes - 200 g (or 1 cup) per square metre and for Podium - Grade turf areas evenly with falls to drains.
Media - 15 grams per litre
- Allow for ground preparation and placement of 100mm topsoil to specification requirements.
- Apply 'turf starter' fertiliser prior to laying (as per Manufacturer's specifications).
6. Edging to planting areas- where not already supplied
- Lay turf parallel to slope contours with staggered, close-butted joints so that the finished turf surface is flush with
All planting areas adjoining turf are to be edged as specified on the landscape plans or detail sheets. Edging should
adjacent finished surfaces.
finish flush with adjoining finished levels and hard pavements. Round / Ease all edges where applicable.
- Turf to be laid 10mm proud of adjoining surfaces to allow for settling of topsoil and to ensure there is a flush finish at at
7. Shaping of garden areas the end of the maintenance period.
Planting areas are to be finished in a well mounded fashion to facilitate drainage of excess water and to show - Water in well and roll after laying to remove undulations - ensure all joins are gap-free. Top-dress any gaps or
planting to best advantage. Mounds to be generally of 1:3 max and 1:5 minimum at time of practical completion. undulations with coarse washed sand.
- Keep lawn moist until established and rooted in. Install temporary
barriers (flagging tape) to ensure walking and driving on turf
areas is prevented and avoided.
- Replace failed turf and relay with new turf.
Revision Date Amendment Drawn Checked
APPROVAL ONLY
SPECIFICATION NOTES NOT FOR CONSTRUCTION
A 17.08.2022 For Approval XL CS
CD-001 scale: N/A
9 KAURI STREET, COOROY
JOB NUMBER: 22332 CLIENT NAME: SUNSHINE GROVE PTY LTD.
Section 3
LEGEND
PLANTING
Retaining Wall. GROUNDCOVERS/GRASS
Refer Civil Drawings.
2 SYZ BC 4 CAR DS 2 SYZ BC 4 CAR DS 3 SYZ BC 5 CAR DS 2 SYZ BC 5 CAR DS 4 SYZ BC
HEDGES
4 ELA eum
FEN-1 ADJOINING RESIDENTAL LOT FEN-1
16 LIR EG / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/
/
/
/
/
GB1 ACCENT SHRUBS
/
/
/
/
/
FEN-1
FEN-1
/
/
/
/
/
FEN-1
/
/
/
/
/
S
/
/
/
/
/
6 DIA cae 9 CAS CI 24 DIC SF EG-1 EG-1 10 DIC SF TREES
/
/
/
/
/
6 LIR SW EG-1 6 LIR AME 6 LIR SW 7 LIR AME 10 LIR EG 7 LIR SW
/
8 CAS CI 7 LIR SW
/
/
/
12 CAS CI
/
/
/
6 DIC SF
/
/
/
4 LIR SW 7 LIR SW 5 LIR AME
/
/ / / / /
/
/ /
/
5 CAL LJ S S S S 7 LIR AME S
S S S S
7 LIR SW S
FEN-1
10 LIR EG
/
FEN-1
/
/
/
S
Carpark. Refer Civil
/
Carpark. Refer Civil
/
7 LIR EG
/
/
7 XAN LP 1 SYZ lue
/
/
/
Drawings.
/
Drawings. 2 COR RUB
7 LIR AME
/
S
/
6 LIR AME
/
/
GB1 10 DIA cae 3 DIA cae 12 LIR AME
/
/
/
/
10 DIA cae 7 LIR AME
/
3 CAL LJ 12 LIR AME
/
/
/
6 LIR SW 10 DIA cae
/
S
/
/
16 DIA cae
/
3 WES Section 4
NAR
/
/
6 LIR AME 6 LIR SW
/
/
4 MEL MQ
/
3 CUP GLA
S
/
/
/
1800mm Timer Fence. 10 DIA cae
/
/
/
3 PHI LP
Refer Civil Drawings.
/
/
1 RHA exc
LEGEND
S
/
/
Retaining Wall. 1 MEL LD
/
/
2 ARC cun Refer Civil Drawings. 4 LIR EG
/
/
SURFACE FINISHES
S
/
/
13 LIR EG 10 LIR EG
/
/
4 DIA cae T1 - TURF TYPE 1
/
/
S
2 RHA exc T1
/
/
/
/
6 LIR SW
GB1 - Garden Type 1
/
/
T1
S
FEN-1
T1 FEN-1 GB1 General Gardens Typical
/
/
/ / / / / / / / / / / / / /
4 WES NAR
/
/
3 CUP GLA
KAURI STREET
/
/
S
GB2 - Garden Type 1
/ 12 LIR AME GB2 Bio Basin
5 DIC SF
/
S
/
3 HAR pen 6 DIC SF GB3 - Garden Type 3
/
16 DIA cae
/
6 LIR SW GB3 Bio Basin Batter
JOINS CD-101
/
S
/
FEN-1 FEN-1
/
GB1 / / /
1800mm high
S
/
Timber Paling Fence
/
6 LIR AME 3 PHI LP EG-1 Edge Type 1
GB1
/
1 RHA exc 4 WES NAR EG-1 - Refer to CD-200
S
5 MEL MQ
/
Concrete pedestrian. 5 XAN LP 1 MEL LD 3 CUP GLA
/
Refer civil drawings. 6 LIR EG 10 DIA cae 3 RHA exc 4 LIR EG
/
GRA Gravel
S
FEN-1 /
6 LIR SW GRA - Refer to Material Schedule
GB1
/
EG-1
/
S
/
/
3 PHI XAN
/
S
FEN-1
/
/ / / / / / / / / / / / / / /
/
S
/
3 ARC cun EG-1
/
13 DIA cae 10 DIA cae
/
S
/
6 LIR SW
/
/
6 DIC SF
S
/
/
Existing turf to remain, 6 CAS CI
/
S
4 WES NAR
FEN-1
and replace damaged
/
6 LIR AME 3 PHI LP
/
area. 3 CAL LJ
1 RHA exc
S
/
2 RHA exc
1 MEL LD
/
7 DIA cae
4 LIR EG
/
/
S
/
/
/
GB1 /
SW
/
GB1
S
/
FE /
N-
/
/
1 /
6 DIA LJ 6 DIA LJ
S
/
5 GAR FLO /
SW
/
/
2 MIC COC
Driveway. Refer Civil
GB1
S
Drawings.
S
Existing turf to remain,
S
and replace damaged 6 PHI XAN 10 LIR EG 6 PHI XAN 11 LIR EG
area.
Retaining Wall.
Refer Civil Drawings.
S
T1 GB1 GB1
T1 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / Section 5
/ / / / / / / / / / / / / / / / / / / / / / / / / / /
ADJOINING RESIDENTAL LOT
3 CUP GLA 3 CUP GLA 3 CUP GLA 3 CUP GLA 6 LAV den
S
3 TRA TRI 5 WES nar 3 TRA TRI 5 WES nar 3 TRA TRI 5 WES nar 3 TRA TRI 5 WES nar
6 LAV den 6 LAV den 6 LAV den 6 LAV den 6 LAV den 6 LAV den 6 LAV den 6 LAV den
S
S
Revision Date Amendment Drawn Checked
APPROVAL ONLY
PLANTING PLAN NOT FOR CONSTRUCTION
A 17.08.2022 For Approval XL CS
CD-100 scale: 1:75@A1; 1:150@A3
9 KAURI STREET, COOROY
TH
NOR
JOB NUMBER: 22332 CLIENT NAME: SUNSHINE GROVE PTY LTD.
Section 6
00L-d9 SNIOPr
-— 5 CAR DS 4 SYZ BC 4 CAR DS
—eN-4 ADJOINING RESIDENTAL LOT FEN-1
, ig Rea ~ a ma :
GB1 UALS leo VS PONS Af pty
—_ \ - <0 I 9 CAS Cl 32 DIC SF Retaining Wall. Kx 9. CAS cl vf of
eet BRP \ Refer Civil Drawi ans
(oy = 13 UR EG . “ | efer Civil Drawings. [ .'- 13LIREG~ = * |<
5DiAcae ii + 3 DIA cael bo 1 Ab Carpark. Refer Civil Carpark. Refer Civil aa fyb C5 Cal UeA\\.
\ 10 DIC SF \ se SCORRUB = ™ | + | Drawings. Drawings. “10 WES NAR . 1SYZ lue 7URSW 7 |
~6URSW siuRsw ps of WES NAR LN LI: fos SAE kk
— Loot > > nan < ~~ I
} 1 SYZ lue AD IN NIN NN (YL () +f YK Car ( DP 10 DIA cae I
, 2 RHA exc g + YrVyryry ry ta) + 0+ |) es Kh 6 5
7 LIR AME —! 4 x WI | ! | ) |
6 LIRSW 71 CRT 7 UR SW ~_5 COR KIW | | i
— 7 LIR AME ‘ 15 LIR EG | Oo!
Ne 1 RHA exc | cf :
6 LIR SW S\ -= 3. CUP GLA | | § ><
~ --_-| KE EET - 7 LR AME es | | 10 LIR EG a
dp 40 Heer ae 3 PHILP °c pe - Be
_— "F \ -1RHAexc -\ Rt -
aa 1 MEL LD |
HT, 4 LIREG — \ | | Retaining Wall. |
cL a) s | Refer Civil Drawinas. \I
l : +4 | 5 IRAME ~
Poo (hod
— _ |
f { +] ) r l |
- 4 WES NAR shh —— |
+ 3 CUP GLA “ | |
= YL peed
| + |!) Ro A a a y oT
| = | “ ooo > | 1 F_10DIAcae | ke
‘ ' | | Si
| — | — | | 3 RHA exc J
| 12 CAS Cl —~ 3, &
| | |
Po Re | | | 7 UR AME 7 [si
y/ / 5 |
= | 4 WES NAR 3 PHILP x Recccececcec: :
Ty | 3CUPGLA \\ 1 RHA exc ww |
+|)-/ 1MELLD ~ \. \ 5 LIR SW “mI
= / 4UREG > \ \\ | | _ o,
p49 p49 + PAL \ * bh
tod toad 4 + y <GBI i 7 UR AME ~~
4 Toe a ai [ ! ot wees
<r pt 2 r [+ (| + 6)
pe - aE 1 oo J —FEN-Y Lf
ery po 7; | | el 10DIAcae | |
|| WIZN / | | | 3 RHAexc — |
A v if
UY) | | i 12 DIC SF —~!
< | I
-------4 Ho ~~ ~~~ = tI. ! | |
ovens al oo “ty 4 WES NAR | : | FE Jur AME — |)
ae = 3 CAL LJ . | Be
To + 3 PHI LP —— \|| |
ot 1 it AN 1 RHA exc ww eet |
—_ hi | bee *y 1 MEL LD WN | 7 = 5 UR SW “TO
— lf a xh 4UREG ~ \ \I | | a
<a 1s ~ ae PK \y \ ~~
aq = \A
YZ DP i SGB1) CD) K ¥ SPAY
oN 6 DIAU <a Y 9 LIR AME
“S— 2 MIC COC _,~ Driveway. Refer Civil Seek o —_]
| Drawings. “f
/ — _J
T-Na4
ISdd ONINIO‘AV
\
\ LOT TWN
\
T-Naa-
|
t
——___| ||
Retaining Wall. +
Refer Civil Drawings.
————— — A [>
rithetete Fy} + (J
ote +) "
— 3 CUP GLA — 3 CUP GLA | we — — Bio-Basin. Detail refer Civil Drawi
3 TRA TRI 5 WES nar \ 3 TRA TRI | \ io- asin. etail re er ivi rawings.
\ 4 ELA eum Bio-Basin Batter. Detail refer Civil Drawings.
6 LAV den 6 LAV den — 4 LAV den
PLANTING PLAN
CD-101
scale: 1:75@A1; 1:150@A3
APPROVAL ONLY
NOT FOR CONSTRUCTION
9 KAU
RIS]
»
FET, COO
ROY
JOB NUMBER: 22332 CLIENT NAME: SUNSHINE GROVE PTY LTD.
4 COR KIW
10 DIA cae
_— 8 MELMQ
-— 5 COR KIW
Z
10 DIA cae
— 8 MEL MQ
~— 5 COR RUB
10 DIA cae
3 MEL MQ
6 COR KIW
12 DIA cae
— 139 LOM hys
20 FIC nod
40 CAR app
_-— 12 LOM hys
2 BAN rob
4 MEL CT
4 MEL thy
2 Cal pac
Date
17.08.2022
Amendment
LEGEND
PLANTING
je GROUNDCOVERS/GRASS
(aa)
a a Oe
ay
ev
HEDGES
ACCENT SHRUBS
\ TREES
7,
LEGEND
SURFACE FINISHES
T1 - TURF TYPE 1
(T1]
7 GB1 - Garden Type 1
|GB1) General Gardens Typical
ZZ. GB2 - Garden Type 1
|GB2| Bio Basin
TZ GB3 - Garden Type 3
|GB3| Bio Basin Batter
FEN-1
EN-L 1800mm high
Timber Paling Fence
EG-1 Edge Type 1
EG-1_ “Refer to CB-200
ELE GRA Gravel
|GRA|~ —- Refer to Material Schedule
“= PROJECT 4
URBAN \
W: www.ProjectUrban.com.au
P: 07 5443 3844
E: [email protected]
Suite 1, Corner Surf Road & Gardak Street
Alexandra Headland QLD 4572
Section 7
Notes:
- Place the rootball on a firmed base to achieve required FSL.
- Thoroughly water the root ball immediately after planting. Notes:
- Number of stakes will vary with pot size. Refer plant schedule. - Place the rootball on a firm base. Macrophyte planting with root
- Cultivate sides of excavated hole 50mm. Jute mesh/coir netting. With
- Thoroughly water the root ball immediately after planting. ball fully into media and pull 300mm long pins at twice
- Cultivate sides of excavated hole 50mm deep. foliage through netting recommended rate to prevent
- Do not disturb kerb, road pavement or road side drainage works.
the mesh from lifting.
- Tease out roots on side of rootball when planting.
- Ensure top of rootball is not buried; expose and set flush with finished level.
Filter media and drainage per
engineer. Filter media to contain
75mm thick coarse straw/ sugar
5% organics per water by
Hardwood Stake: cane mulch with minimal fines.
design guidelines
25x25x90mm Place 600mm
into the ground. Do not
place through rootball.
Secure with ties by looping
in a figure eight pattern.
Hardwood stake: Place 600mm
Mulch: Pull away from into the ground. Do not place
base of plant. through rootball. Secure with 3 BIO-BASIN PROFILE
ties by looping in a figure eight CD-200 1:10@A1, 1:20@A3
Form an earthen basin pattern.
around base of plant.
Raise plant 50mm above
finished surface level.
Mulch: Pull away from base
Topsoil blend of plant. FSL
Fertiliser: Do not allow Form an earthen basin Mulch
contact with roots. around base of plant. Turf as specified
- to 100mm depth
Topsoil
Water retention additive Soil blend or site topsoil - to 100mm depth
- to 300mm depth
Topsoil blend Cultivate subgrade
min 300
- to 150mm depth
1 140-300mm PLANTING Water retention additive
Existing subgrade
CD-200 1:10@A1, 1:20@A3 Cultivated subgrade
Fertiliser: Do not allow 1
- to 150mm depth
fertiliser to come in 1
contact with roots.
width (w)
10 - 20mm Drainage gravel
2xw
2 45-200ltr PLANTING 4 GARDEN BED PROFILE
Turf profile
TURF PROFILE
scale 1:5
CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3 5
CD-200 1:5@A1, 1:10@A3
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A 17.08.2022 For Approval XL CS
CD-200 scale as noted
9 KAURI STREET, COOROY
JOB NUMBER: 22332 CLIENT NAME: SUNSHINE GROVE PTY LTD.
Used in these records
Landscaping plan 22332_OPW[A].pdfRelated documentApplication case desk ↗
Landscaping plan 22332_OPW[A].pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.