- Place the rootball on a firmed base to achieve required FSL.
- Thoroughly water the root ball immediately after planting. Notes:
- Number of stakes will vary with pot size. Refer plant schedule. - Place the rootball on a firm base. Macrophyte planting with root
- Cultivate sides of excavated hole 50mm. Jute mesh/coir netting. With
- Thoroughly water the root ball immediately after planting. ball fully into media and pull 300mm long pins at twice
- Cultivate sides of excavated hole 50mm deep. foliage through netting recommended rate to prevent
- Do not disturb kerb, road pavement or road side drainage works.
the mesh from lifting.
- Tease out roots on side of rootball when planting.
- Ensure top of rootball is not buried; expose and set flush with finished level.
Filter media and drainage per
engineer. Filter media to contain
75mm thick coarse straw/ sugar
5% organics per water by
Hardwood Stake: cane mulch with minimal fines.
design guidelines
25x25x90mm Place 600mm
into the ground. Do not
place through rootball.
Secure with ties by looping
in a figure eight pattern.
Hardwood stake: Place 600mm
Mulch: Pull away from into the ground. Do not place
base of plant. through rootball. Secure with 3 BIO-BASIN PROFILE
ties by looping in a figure eight CD-200 1:10@A1, 1:20@A3
Form an earthen basin pattern.
around base of plant.
Raise plant 50mm above
finished surface level.
Mulch: Pull away from base
Topsoil blend of plant. FSL
Fertiliser: Do not allow Form an earthen basin Mulch
contact with roots. around base of plant. Turf as specified
- to 100mm depth
Topsoil
Water retention additive Soil blend or site topsoil - to 100mm depth
- to 300mm depth
Topsoil blend Cultivate subgrade
min 300
- to 150mm depth
1 140-300mm PLANTING Water retention additive
Existing subgrade
CD-200 1:10@A1, 1:20@A3 Cultivated subgrade
Fertiliser: Do not allow 1
- to 150mm depth
fertiliser to come in 1
contact with roots.
width (w)
10 - 20mm Drainage gravel
2xw
2 45-200ltr PLANTING 4 GARDEN BED PROFILE
Turf profile
TURF PROFILE
scale 1:5
CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3 5
CD-200 1:5@A1, 1:10@A3
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A 17.08.2022 For Approval XL CS
CD-200 scale as noted
9 KAURI STREET, COOROY
JOB NUMBER: 22332 CLIENT NAME: SUNSHINE GROVE PTY LTD.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Landscaping plan 22332_OPW[A].pdfRelated documentApplication case desk ↗
Landscaping plan 22332_OPW[A].pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.