Subject: RE: J001178 - Reporting Delivery - BHA & CRP for proposed RAL @33 Pavilion St POMONA
From: Noel Shipp
Date: 2023-07-10T03:01:54+00:00
To: Joshua Lee - North Coast Environmental Services, Jack Lewis

Thank you Josh

 

Response in blue.

 

Regards

 

Noel Shipp

0421 572 866

 



 

From: Joshua Lee - North Coast Environmental Services <[email protected]> 
Sent: Monday, July 10, 2023 12:16 PM
To: Noel Shipp <[email protected]>; Jack Lewis <[email protected]>
Cc: Jarrod Isaacs - North Coast Environmental Services <[email protected]>
Subject: RE: J001178 - Reporting Delivery - BHA & CRP for proposed RAL @33 Pavilion St POMONA

 

Hi Noel,

 

Please see my responses to your comments below.

 

Bushfire Report:

*	Distribution – Please change to PSP Developments Pty Ltd  
*	Conclusion – Please confirm no BAL ratings apply and that the BLE’s of lots 9 & 10 remain low hazard area. As long as grassland on lot 9 is maintained as short cropped grass then only Lot 8 may be assigned a BAL rating. This would occur if the building is located within 7m of its western boundary due to the presence of the 10m wide rehabilitated waterway. A separation of 20m is required in order for the linear revegetation works to be classed as ‘low threat vegetation’. Good outcome, ie plant rain forest plants and negate the need of BAL rating to houses.

 

Covenant Plan:

*	Plate B – I don’t see the need to fence the entire covenant area. One fence to the covenants eastern side will achieve what you want that people do not access these areas. Need to think about gate locations to waterway strip. Fence either side of linear waterway to keep stock out on lot 9 and one fence on eastern side of riparian buffer cov area to achieve the same. Noted
*	Maintenance period – Maintenance period of 3 years is too long as I will not be the owner once developed and how do I then maintain someone else’s property? 12 months is much more realistic manageable. We went through this on adjacent lot and Council conditioned 36 months.  Maintenance access is provided via clause in the sale contract. Most people are happy to have their land managed at no cost. We can state 12 months and see how we go. Please confirm again. Please go with 12 months
*	Revege methodology – Revege area 1 – point 9. Talks about 24 month maintenance period. Need to be consistent. We can state 12 months and see how we go. Please confirm again. Please go with 12 months
*	Revege methodology – Revege area 2 – point 5. Talks about 12 month maintenance period. Need to be consistent. We can state 12 months and see how we go. Please confirm again. Please go with 12 months

 

Ecological Report:

*	Distribution – Please change to PSP Developments Pty Ltd ok
*	Executive Summary – fifth dot point from bottom – can we say, the covenant land is revegetated as per the attached Covenant Rehabilitation Plan (CRP). ok
*	5.1.2 Mitigation Measures – can we say, the covenant land is revegetated as per the attached Covenant Rehabilitation Plan (CRP). yep
*	5.3.1 Impacts – Should we confirm that the rehabilitation of the waterway will be completed as part of stage 2, so there is no confusion? Yes noted
*	5.3.2 Mitigation Measures – can we say, the covenant land is revegetated as per the attached Covenant Rehabilitation Plan (CRP). Yep noted
*	7.1 Conclusion – dot point 5 from the bottom of the page – can we say, the covenant land is revegetated as per the attached Covenant Rehabilitation Plan (CRP). Ok noted
*	In the conclusion, we should say that the site is getting a significant ecological benefit/gain by the revegetation of the riparian zone and waterway corridor proposed by this development. Sure thing Thank you

 

Jack, any other comments?

 

Should you have any queries regarding this matter please do not hesitate to contact me.

 

Regards,

 

Joshua Lee - Director
B. Sc. Australian Environmental Studies (Ecology, Land & Water, Pollution & Health)

mEIANZ, mFPAA, mESA 
 


P.O Box 385 

Peregian Beach QLD 4573

Mobile:   0406 626 913 | Email:  [email protected] <mailto:[email protected]>  | Web:   www.northcoastenv.com.au <http://www.northcoastenv.com.au/> 

 

P Please consider the environment before printing this e-mail

PRIVATE AND 
NOTICE: This e-mail is intended only for the use of the addressee and may contain information that is privileged, confidential and/or exempt from disclosure at law. You must not edit this e-mail or any attachments without our express written consent.  North Coast Environmental Services is not liable for any failed, corrupt or incomplete transmission of this e-mail or any attachments or for any viruses contained in them. By opening any attachments, you accept full responsibility for the consequences. If you are not the intended recipient, any dissemination, reliance upon or copying of this e-mail or any attachments is strictly prohibited, and you must immediately erase them permanently from your system, notify us by telephone (at our cost) and destroy any hard copies. Thank you.

 

 

 

 

From: Noel Shipp <[email protected] <mailto:[email protected]> > 
Sent: Friday, July 7, 2023 1:56 PM
To: Jarrod Isaacs - North Coast Environmental Services <[email protected] <mailto:[email protected]> >; Joshua Lee - North Coast Environmental Services <[email protected] <mailto:[email protected]> >; Jack Lewis <[email protected] <mailto:[email protected]> >
Subject: RE: J001178 - Reporting Delivery - BHA & CRP for proposed RAL @33 Pavilion St POMONA

 

Hi Jarrod/Josh

 

Thank you for completing bushfire/ecology/covenant reports. I make the following comments, Jack, please add your comments:

 

Bushfire Report:

*	Distribution – Please change to PSP Developments Pty Ltd
*	Conclusion – Please confirm no BAL ratings apply and that the BLE’s of lots 9 & 10 remain low hazard area.

 

Covenant Plan:

*	Plate B – I don’t see the need to fence the entire covenant area. One fence to the covenants eastern side will achieve what you want that people do not access these areas. Need to think about gate locations to waterway strip.
*	Maintenance period – Maintenance period of 3 years is too long as I will not be the owner once developed and how do I then maintain someone else’s property? 12 months is much more realistic manageable.
*	Revege methodology – Revege area 1 – point 9. Talks about 24 month maintenance period. Need to be consistent.
*	Revege methodology – Revege area 2 – point 5. Talks about 12 month maintenance period. Need to be consistent.

 

Ecological Report:

*	Distribution – Please change to PSP Developments Pty Ltd
*	Executive Summary – fifth dot point from bottom – can we say, the covenant land is revegetated as per the attached Covenant Rehabilitation Plan (CRP).
*	5.1.2 Mitigation Measures – can we say, the covenant land is revegetated as per the attached Covenant Rehabilitation Plan (CRP).
*	5.3.1 Impacts – Should we confirm that the rehabilitation of the waterway will be completed as part of stage 2, so there is no confusion?
*	5.3.2 Mitigation Measures – can we say, the covenant land is revegetated as per the attached Covenant Rehabilitation Plan (CRP).
*	7.1 Conclusion – dot point 5 from the bottom of the page – can we say, the covenant land is revegetated as per the attached Covenant Rehabilitation Plan (CRP).
*	In the conclusion, we should say that the site is getting a significant ecological benefit/gain by the revegetation of the riparian zone and waterway corridor proposed by this development.

 

Well written guys.

 

Josh, give me a call to discuss these points.

 

Thank you

 

Regards

 

Noel Shipp

0421 572 866

 



 

From: Jarrod Isaacs - North Coast Environmental Services <[email protected] <mailto:[email protected]> > 
Sent: Tuesday, June 27, 2023 8:47 AM
To: Noel Shipp <[email protected] <mailto:[email protected]> >
Cc: Joshua Lee - North Coast Environmental Services <[email protected] <mailto:[email protected]> >
Subject: J001178 - Reporting Delivery - BHA & CRP for proposed RAL @33 Pavilion St POMONA

 

Morning Noel,

 

Please see attached:

*	Bushfire Hazard Assessment; and
*	Covenant Rehabilitation Plan.

 

To support the proposed Reconfiguration of A Lot (RAL) Development Application located at 33 Pavilion St POMONA. 

 

The ecological reporting will be soon to follow.

 

Kind Regards,

 

Jarrod Isaacs – Environmental Scientist
B. Env Sc.
 


P.O Box 385 Peregian Beach QLD 4573 <x-apple-data-detectors://3/0> 
Mob: 0438 370 901 
Email:  [email protected] <mailto:[email protected]>  
Web:   www.northcoastenv.com.au <http://www.northcoastenv.com.au/> 

 

Please consider the environment before printing this e-mail

PRIVATE AND 
NOTICE: This e-mail is intended only for the use of the addressee and may contain information that is privileged, confidential and/or exempt from disclosure at law. You must not edit this e-mail or any attachments without our express written consent.  North Coast Environmental Services is not liable for any failed, corrupt or incomplete transmission of this e-mail or any attachments or for any viruses contained in them. By opening any attachments, you accept full responsibility for the consequences. If you are not the intended recipient, any dissemination, reliance upon or copying of this e-mail or any attachments is strictly prohibited, and you must immediately erase them permanently from your system, notify us by telephone (at our cost) and destroy any hard copy. Thank you.
Log in to download the original file

RE_ J001178 - Reporting Delivery - BHA & CRP for proposed RAL @33 Pavilion St POMONA.msg · 308 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.