RFI - Attachment 6 - Technical Note
4 February 2021 Devcon Property Group Attention: Mr Simon Drew Email: [email protected] PROPOSED INDUSTRIAL COMPLEX 11 LEO ALLEY ROAD, NOOSAVILLE Dear Simon, At the request of Devcon Capital 9 Pty Ltd (Devcon), Tectonic has reviewed supplied documents to enable the provision of the geotechnical advice given below for a proposed retaining wall at the above site. The following documents were reviewed: CSI Soil Testing (CSI) report 13971, dated 18/01/2021. Blackburne Jackson architectural drawings 31317-DA01 to DA-14, not inclusive, dated 13/01/2021. Covey Associates Pty Ltd (Covey) civil design drawings 192297-C001 to C-411, not inclusive, various issues and dates. We understand that a cut is proposed along the western boundary of the site to depths of not more than 1.5 m below ground level (BGL). The Covey design specifies sheet pile walls to provide temporary support to the cutting along most of the western boundary, with permanent support presumably to be provided by concrete tilt panels which will form external walls to the adjoining industrial unit buildings. A short intervening area between the units, at an existing sewer crossing, is to be retained using masonry block walls supported on concrete bored piles taken below the sewer invert level (Covey ref. RW4). We are advised by Devcon (email dated 3 February 2021) that the Covey design is to be amended to include concrete block masonry walls along the western boundary of the units, in place of concrete tilt panels. The CSI soil test indicates that three boreholes (denoted BH1 to BH3) were drilled along the western side of the site, in proximity to the proposed sheet pile walls. These boreholes encountered similar subsurface conditions comprising an upper layer of variable materials including soft to stiff clays, sands and gravels to about 0.5 m BGL, then very stiff to hard natural silty clays to drilling termination at 3 m BGL. Soils in these boreholes were mostly described as moist, however some very moist and wet soils were indicated by CSI in the upper materials in boreholes BH2 and BH3. Available aerial imagery, and anecdotal information provided by Devcon, indicates that there are no buildings or sensitive structures within at least 2 m of the western boundary on the neighbouring property to the west. Provided that the upper variable soils are benched no steeper than 1V:1H (e.g. 0.5 m horizontal bench), and that significant groundwater seepage is not encountered during construction, the temporary, unsurcharged cutting along the western boundary through very stiff to hard natural silty clays may be formed vertical to a height of not more than 1.5 m. The cut must be retained within two weeks of excavation, unless a longer timeframe is approved following inspection of the excavation by a suitably qualified and experienced RPEQ geotechnical engineer (‘Geotechnical Engineer’). We therefore suggest that the proposed concrete block walls for the western units could be used to provide permanent support to the western boundary cutting, and that the proposed sheet piles would not be required subject to implementation of the above advice during construction. Details for waterproofing, drainage and backfilling behind the block retaining walls would need to be assessed and detailed by a structural engineer. Tectonic Geotechnical Pty Ltd PO Box 899, Buderim, QLD 4556 Office: (07) 5478 9016 Email: [email protected] www.tectonicgeo.com.au A.B.N. 83 165 727 828
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.