Performance outcomes Acceptable outcomes Compliance
If a DFE is adopted, structures used for the
manufacture or storage of hazardous material are
located above the DFE level.
Editor’s Note— Refer to the Work Health and Safety
Act 2011 and associated Regulation and Guidelines,
the Environmental Protection Act 1994 and the
relevant building assessment provisions under the
Building Act 1975 for requirements relating to the
manufacture and storage of hazardous substances.
Information is provided by Business Queensland on
the requirements for storing and transporting
hazardous chemical.
PO2 AO2 Complies
All lots have sufficient area that is above the DFE flood The minimum area above flood level (flood free area) The proposed finished floor levels of 5.2m AHD are
level or where modelling is not available, the highest for each lot, is in accordance with Table 8.2.6.5. well above the required 3.5m AHD.
recorded flood level, to safely and adequately
accommodate the intended use.
PO3 AO3 Not applicable
For reconfiguring a lot or operational works, Development areas are not filled to reduce flood risk. Reconfiguring a lot and/or operational is not
development is undertaken in a manner that ensures: proposed.
(a) natural hydrological systems are protected from
erosion, scour or flood damage on the premises or
other premises;
(b) natural landforms and drainage lines are
maintained to protect the hydraulic performance of
waterways and flood plain; and
(c) development integrates with the natural landform
rather than modifying the landform to suit the
development as far as practicable.
PO4 AO4.1 Not applicable
Reconfiguring a lot is not proposed.