Council archive · source document
Approved Plan - OPW23/0175
Plans and drawings: the text below has words only, no drawings.
E
E
E
E
E
E
E
E
S
S
SS S
S
S
S
S
S
S
V
V
V V
S
V V
V V
V
S
V
V V V V
V V V V
TERRACE
SEAVIEW
V
S
V
V
Works to transition neatly in accordance with
S
Conditions of Development Approval
V
V
V
V
S
V
V
S
V
V
S
V
V
S
V
V
NOOSA COUNCIL CIVIL WORKS PLAN
APPROVED PLAN
OPW23/0175 13 DEC 2023
As annotated by Council
DESIGNED BRISBANE T 07 3852 4333 SURVEYOR DATUM DRAWING STATUS
E [email protected]
PROJECT
DRAWN
GOLD COAST T 07 5571 1599
CHECKED
E [email protected] LOCATION DRAWING NUMBER
SUNSHINE COAST T 07 5391 3777 USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES
E [email protected] CHECK WITH THE PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT
APPROVED J. HILL RPEQ 19891 WORK FROM REDUCED SCALE DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL
For and on behalf of
NORTHERN NSW T 02 6674 8047
DRAWINGS & WORKS EXECUTED FROM THEM IS VESTED IN WESTERA PARTNERS TITLE
DATE E [email protected] SHEET NUMBER REVISION
WESTERA PARTNERS PTY. LTD. AND USE OF THERE FORE WITHOUT PERMISSION IS STRICTLY PROHIBITED! IT IS
www.westerapartners.com.au ABN 52 097 417 975 CENTRAL VICTORIA T 03 5441 0922 THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE CARRIED OUT WITH
No. DATE REVISIONS DES DRN CHK APD DOCUMENT CONTROL APPROVED E [email protected] DUE CARE AND DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. CLIENT
Document Set ID: 22654553
Version: 1, Version Date: 08/11/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
SEAVIEW
TERRACE
SECTION
STANDARD PAVEMENT SECTION
SEAVIEW
TERRACE
SECTION TYPE "B1" KERB
SEAVIEW TYPE "ER2" KERB
TERRACE
SECTION
TYPE "B2" KERB
NOOSA COUNCIL
APPROVED PLAN
OPW23/0175 13 DEC 2023
DESIGNED BRISBANE T 07 3852 4333 SURVEYOR DATUM DRAWING STATUS
E [email protected]
PROJECT
DRAWN
GOLD COAST T 07 5571 1599
CHECKED
E [email protected] LOCATION DRAWING NUMBER
SUNSHINE COAST T 07 5391 3777 USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES
E [email protected] CHECK WITH THE PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT
APPROVED J. HILL RPEQ 19891 WORK FROM REDUCED SCALE DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL
For and on behalf of
NORTHERN NSW T 02 6674 8047
DRAWINGS & WORKS EXECUTED FROM THEM IS VESTED IN WESTERA PARTNERS TITLE
DATE E [email protected] SHEET NUMBER REVISION
WESTERA PARTNERS PTY. LTD. AND USE OF THERE FORE WITHOUT PERMISSION IS STRICTLY PROHIBITED! IT IS
www.westerapartners.com.au ABN 52 097 417 975 CENTRAL VICTORIA T 03 5441 0922 THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE CARRIED OUT WITH
No. DATE REVISIONS DES DRN CHK APD DOCUMENT CONTROL APPROVED E [email protected] DUE CARE AND DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. CLIENT
Document Set ID: 22654553
Version: 1, Version Date: 08/11/2023
Used in these records
Approved Plan - OPW23/0175.pdfRelated documentApplication case desk ↗
About this file
- File size
- 793 KB (small file)
- File type
No other editions are linked here.