Original source · versioned page text
MCU22/0051 Application For Material Change Of Use Hardware & Trade Supplies At 178 Eumundi Noosa Road, Noosaville · 2023.10.26 Attachment 3 To The Minutes – MCU220051 – Approved Conditions
• Eucalyptus intermedia
• Melaleuca quinquenervia
• Banksia integrifolia
b. Vegetated screening of the proposed development from Gateway Drive, designed such
that the development is screened at maturity;
c. Vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage;
d. Provision of 1 street tree within the road reserve for every 8 metres of road frontage.
16. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Fauna Management
17. Vegetation must only be removed or disturbed in accordance with a Fauna Management Plan
(or part thereof) prepared by a qualified person* and endorsed through an Operational Works
approval.
*(Refer to Advisory Note)
Waste Management
18. A waste storage area must be designed and maintained in accordance with Planning Scheme
Policy PSP9 Waste Management and the Noosa Plan’s Waste Management Code. The
waste storage area must be:
a. imperviously paved and correctly sized for all refuse and recycling containers;
b. bunded and graded so that wastewater and bin leakage drain to the sewer;
c. provided with a conveniently located hosecock and backflow prevention device,
connected to a water supply to service the area; and
d. roofed or otherwise covered.
19. A Waste Management Plan must be prepared that details the type and quantity of waste
material that is likely to be generated by the development; where and how the waste will be
stored, disposed of and procedures for handling the waste. The Waste Management Plan
must be submitted and approved by Council prior to the issue of a Development Permit for
Operational Works.
Performance Bond
20. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves the
right to call upon the bond or guaranteed sum to effect compliance with conditions.
Acid Sulfate Soil
21. The disturbance and release of Acid Sulphate Soils must be avoided by:
a. Undertaking an Acid Sulfate Soils investigation and soil analysis pursuant to the
National Acid Sulfate Soils Guidance.
b. not excavating or otherwise removing soil or sediment containing ASS;
c. not permanently or temporarily extracting groundwater that results in the aeration of
previously saturated ASS; and
d. not undertaking filling on land at or below 5 metres AHD that results in:-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original