Referral Agency Response — Material Change of Use
S$ 3.3 16 Integrated Planning Act 1997

1. Application information

11.
12.
1.3.
14,
15.

16.

Applicant’s name: Noosa Shire Council

Property description: 77 SP177938 - Noosa Shire
Assessment Manager/Reference: Noosa Shire Council

Date application was referred to Department: 26 April 2005

Departmental Reference. eLVAS Case No: 2005/101216, File Ref. No:
GYP/000280, Trackjob No: IR0405NAM0004

Type/s of development sought by the application:
QO Matenal Change of Use

2. Concurrence Agency response:

The Chief Executive of the Department of Natural Resources and Mines directs that the
following conditions must be imposed on any approval given by the Assessment Manager:

2.1

22

23

24

25

26

27

This permit does not authorise the clearing of any native vegetation that 1s on any land
not contained withm the area identified as Permit A on the attached Referral Agency
Response (Vegetation) Pian RARP2005/101216.

Expansion of the area designated for Waste Disposal and Recycling Facility within
Lot 77 on SP177938 is restricted to the area identified as Permit A on the attached
Referral Agency Response (Vegetation) Plan RARP2005/101216.

Prior to clearing for the establishment of additional landfill cells and waste
management facilities, a storm-water management and sediment control plan that
prevents storm-water, sediment and other possible contammants from encroaching into
areas outside of the area of Permit A on RARP2005/101216, must be developed and
inshtuted so as to be effective durmg the operational works stage of the site
preparation and landfill construction

The design and construction of new landfill cells must incorporate a leachate
Management system that prevents the escape of water from the landfill cells into the
surrounding environment

The leachate management system must incorporate a groundwater monitoring system
and response strategy that 1s capable of rapid identification of cell leakage and
rectification measures.

The design and construction of the expanded waste management facility must
weorporate a storm-water control system that will prevent, m perpetuity, storm-water,
sediment and other possible contammants from encroaching into surrounding areas of
remnant vegetation.

All works are to be undertaken im accordance with Environmental Protection Agency
Guidehnes for Landfill siting, design, operation and rebabiltation, Waste Disposal —
ERA 75.

IDAS Referral Agency Response

Document Set ID: 22816452
Version: 8, Version Date: 22/02/2024

Page 12 of 24
Log in to download the original file

SUPERSEDED Decision Notice - Other Change - Council Meeting Decision 132005 638 03 [As Published].pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.