Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 3 - Final New Noosa Plan Part 7 Track Change version
The original of this document is very large (23.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable outcomes
(b) provide convenient and safe rear access to premises
including service vehicles where relevant;
(c) provide safe pedestrian linkages
(d) add to the heritage character of Cooroy.
PO17 AO17.1
Access to development is only taken from a laneway where the Development facilitates the widening of laneways including where
laneway is upgraded to accommodate anticipated levels of traffic. indicated in Figure 7.2.2.4 (Cooroy Framework and Character
Plan).
Development facilitates the widening and upgrading of
laneways in the Cooroy Local Plan Area to accommodate AO17.2
anticipated levels of traffic. Where: The amount of land required for widening is suitable to achieve
the outcome shown in Figure 7.2.2.5.
(a) access to development is taken from a laneway, a 2m
resumption from the laneway frontage is required for
widening and the laneway is to be upgraded to the
No acceptable outcome provided.
appropriate standard; or
(b) development is undertaken on a property with a laneway Editor's Note- The design and upgrading of the laneway is
frontage, and access is not taken, a 2m easement is done in accordance with Council's Laneways Policy for
provided for future widening and upgrading purposes.
Cooroy.
PO18
Development improves local connectivity by providing safe and No acceptable outcome provided
convenient pedestrian and bicycle pathways to and between
key destinations such as the town centre, railway station,
community and sports facilities and schools.
PO19 AO19
Development integrates with and extends the existing street Development on land including or adjoining a key pedestrian/cycle
and pathway networks including but not limited to those link shown on Figure 7.2.2.4 (Cooroy Framework and Character
identified on Figure 7.2.2.4 (Cooroy Framework and Character Plan) facilitates these connections.
Plan) such that connections to and between key local
destinations are provided and reinforced.
Table 7.2.2.3 Table for Assessment Criteria (part)
Performance outcomes Acceptable outcomes
Environment, natural resource and recreation values
PO20 AO20
Development has no significant adverse effects on biodiversity, Connecting Habitat Areas as identified on Map SFM-4 -
natural vegetation, native fauna habitat, landscape quality, water Biodiversity (Strategic Framework Map) are protected from
quality or cultural heritage values, including those related to: fragmentation and encroachment by development.
(a) changes to natural drainage;
Editor’s Note— Council may request additional information on
(b) disturbance to any of the wetland systems;
the proposed method of effluent disposal to ensure the nature of
(c) management of landslide and fire risk; the development is compatible with environmental values.
(d) erosion and the transport of sediments offsite; Refer to PSP1 – Preparing a well made application..
(e) unmanaged public access;
(f) effluent disposal; and
(g) changes to fauna habitat and behaviour.
PO21 AO21
Development maintains and protects an integrated open space Open space corridors identified as Ecological Linkages and
**FINAL DRAFT - Post Consultation 2019** Page 7 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.