Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 3 - Final New Noosa Plan Part 7 Track Change version

of 81

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                               Acceptable Outcomes
                                                                         (b)   incorporate a mix of lightweight and textured external
                                                                               building materials, including timber finishes with
                                                                               variation provided in texture, detailing and articulation;
                                                                         (c)   incorporate verandahs, open balconies with transparent
                                                                               or open balustrades or shaded patios for outdoor living;
                                                                               and
                                                                         (d)   allow for landscape integrated with the buildings on site.

                                                                         AO7.6
                                                                         Boundary setbacks provide space for trees between buildings.




     Table 7.2.6.3 Criteria for assessment (part)
      Performance Outcomes                                               Acceptable Outcomes

      Centres and services
      PO8
      The coastal communities local plan area is serviced by the         No acceptable outcome provided
      following centres which provide business, entertainment and
      community uses in accordance with their role and function as
      determined by the Noosa Shire Centres Hierarchy for both the
      local community and visitors:
      (a)   Peregian Beach Local centre;
      (b)   Sunrise Beach Neighbourhood centre; and
      (c)   Sunshine Beach Visitor centre.

      PO9                                                           AO9
      In Peregian Beach, Heron Street and the portion of Kingfisher Development provides for Heron Street and Kingfisher Drive
      Drive between Heron Street and Grebe Street have a pedestrian (between Heron Street and Grebe Street) to be maintained as
      orientated character providing key access and visual linkages attractive, vibrant and pedestrian friendly streets.
      between the Peregian Beach park, the beach and the village
      square.
      PO10                                                               AO10
      Development in the Local centre zone at Peregian Beach:            Development:
      (a)   is sympathetic to the coastal village character of the local (a)   respects the layout, scale (including height and setback)
            centre;                                                            and character of development on adjoining sites:
      (b)   contributes to the creation of a contemporary coastal built (b)    provides a fine scale of built form as shown in Figure
            form and streetscape;                                              7.2.6.6
      (c)   creates vibrant and active spaces in the public realm;       (c)   provides active street frontages where identified as
      (d)   provides continuous weather protection for pedestrians;            primary active street frontage in Figure 7.2.6.4 (Peregian
            and                                                                Beach Framework and Character Plan) that incorporate
                                                                               shopfronts, indoor/outdoor cafes and restaurants and
      (e)   provides integrated and functional car parking and                 other activities that are likely to foster casual, social and
            access arrangements that do not dominate the street.               business interaction for extended periods. Refer
                                                                               to Figure AP3­8A for design outcomes for active
                                                                               streetscapes.
                                                                         (d)   has building openings overlooking the street and
                                                                               addressing key corners as shown in Figure 7.2.6.4
                                                                               (Peregian Beach Framework and Character Plan and
                                                                               Figure AP3­7A
                                                                         (e)   provides all weather protection in the form of continuous
                                                                               cantilevered awnings and/or light verandah structures
                                                                               with decorative non­load bearing posts over footpath
                                                                               areas with mature or semi­mature shade trees planted


**FINAL DRAFT ­ Post Consultation 2019**                                                                                               Page 6 of 13
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 3 - Final New Noosa Plan Part 7 Track Change version(PDF, 22MB).pdf · 23.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.