Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 3 - Final New Noosa Plan Part 7 Track Change version

of 81

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                              Acceptable Outcomes
      PO16
      Development improves local connectivity by providing              No acceptable outcome provided
      pedestrian and cycle connections to, within and between
      destinations such as local centres, local community and
      sporting facilities, schools and walking trails in Noosa National
      Park.
      PO17                                                              AO17
      Development integrates with and extends the existing street       Development on land including or adjoining a key
      and pathway networks including but not limited to those           pedestrian/cycle link including where shown in Figure
      identified on Figure 7.2.6.4 (Peregian Beach Framework and        7.2.6.4 (Peregian Beach Framework and Character Plan)
      Character Plan) such that connections to and between key local    facilitates these connections.
      destinations are provided and reinforced.
      PO18
      Development provides for access to foredune and beachfront        No acceptable outcome provided
      areas to be via formalised communal access points which are
      located and designed so as to maintain and enhance visual
      amenity, dune stability, habitat values and water quality.

     Table 7.2.7.3 Criteria for assessment (part)
      Performance Outcomes                                              Acceptable Outcomes

      Environment, natural resources and recreation
      PO19                                                               AO19
      Development has no significant adverse effects on biodiversity, Connecting Habitat Areas as identified on Map SFM­4
      natural vegetation, native fauna habitat, landscape quality, water ­ Biodiversity (Strategic Framework) are protected from
      quality or cultural heritage values, including those related to—   fragmentation and encroachment by development.
      (a)   changes to natural drainage;
      (b)   disturbance to the dune system and wetland system;
      (c)   management of landslide and fire risk;
      (d)   erosion and the transport of sediments off site;
      (e)   unmanaged public access; and
      (f)   changes to fauna habitat and behaviour.

      Editor's Note— Regular hazard reduction activities occur in the
      fire fuel control buffer between the Noosa National Park and
      urban residential development. These activities are necessary
      to reduce risk to people and property and may have an
      unavoidable impact on biodiversity and habitat values.
      PO20                                                              AO20
      Development maintains and protects an integrated open space Open space corridors identified as Ecological Linkages and
      network to—                                                       Major Recreation areas on Map SFM­1 ­ Settlement and Map
      (a)   provide for both passive and active recreational pursuits; SFM­4 ­ Biodiversity (Strategic Framework) are enhanced and
                                                                        protected from fragmentation and encroachment by
      (b)   provide connectivity for pedestrians and cyclists;
                                                                        development.
      (c)   provide habitat connectivity for wildlife and fish passage;
      (d)   protect watercourses and drainage lines;
      (e)   protect vegetation on steep slopes; and
      (f)   form a scenic backdrop for residential development.




     Table 7.2.7.3 Criteria for assessment (part)
      Performance Outcomes                                              Acceptable Outcomes


**FINAL DRAFT ­ Post Consultation 2019**                                                                                           Page 8 of 13
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 3 - Final New Noosa Plan Part 7 Track Change version(PDF, 22MB).pdf · 23.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.