Council archive · source document
Approved Decision Notice - MCU25 0099 · MCU25/0099
written conditions of the approval and the approved plans, the requirements of the written conditions prevail 2 | Any alterations to the plans | At all times To ensure the and document(s) identified development is within Table 1 of this carried out generally response are to be in accordance with resubmitted to Energex for the plans of comment development submitted within the application General Advice: Compliance with the Electrical Safety Act 2002, including any Code of Practice under the Act and the Electrical safety Regulation 2013 including any safety exclusion zones defined in the Regulation is mandatory Should any doubt exist in maintaining the prescribed clearance to the overhead conductors and electrical infrastructure then the applicant is obliged under the Act to seek advice from Energex. Any costs incurred by Energex as a result of the works on the easement are to be met by the property Developer / owner. This response does not constitute an approval to commence any works within the easement. Consent to commence works relevant to the conditions of the easement is required. All works on easement (including but not limited to earthworks, drainage and detention basins, road construction, underground and overhead services installation) require detailed submissions, assessment, and consent (or otherwise) by Energex. All works proposed to be undertaken in close proximity to overhead or underground electrical lines are to be undertaken in accordance with Energex's Works Practice Manual WP1323. This document refers to various standards, guidelines, calculations, legal requirements, technical details, and other information relevant to working near high voltage infrastructure. A copy of WP1323 can be found online via Energex's document library (Document library Energex). Should you require any further information on the above matter, please contact Harriet Veal on 0427 293 604 or via email at [email protected] faithfully, Warreet Veab Harriet Veal Town Planner Have you seen our fact sheets? See the ‘considerations when developing around electricity infrastructure’ section of our website wan energex.com.au/referralagency Page 8 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Decision Notice - MCU25 0099.pdfRelated documentApplication case desk ↗
About this file
- File size
- 671 KB (small file)
- File type
No other editions are linked here.