Attachment C- REC14.0005 Negotiated Decision Notice

of 10

Page text shows just the words. Original shows the document exactly as it was published.

                                          Officer:            Denis Wallace
                                          Direct Telephone:   5329 6239
                                          Fax:                5329 6501
                                          Our Reference:      DWALLACE:REC14/0005
                                          Your Reference:     PR102995-10

25 September 2014


Bunnings Properties Pty Ltd
C/- RPS
PO Box 1559
FORTITUDE VALLEY QLD 4006


Dear Sir/Madam

                             Negotiated Decision Notice
                                Sustainable Planning Act 2009
I refer to your application and the representations you made in respect to the decision notice.
On 24 September 2014 Council decided your representations.

Details of the decision are as follows:
1     APPLICATION DETAILS

Application No:                 REC14/0005
Street Address:                 178 Eumundi Noosa Rd NOOSAVILLE QLD 4566
Real Property Description:      Lot 101 SP 241371
Planning Scheme:                The Noosa Plan (16 September 2013)
2     DECISION DETAILS

Council on 4 July 2014 decided to issue the following type of approval:
     Development Permit to Reconfigure a Lot (1 Lot into 2 Lots)

In relation to representations, Council on 24 September 2014 decided to:
A.    Amend the numbering of the Assessment Manager Conditions listed under Item 4 to run
      consecutively.
B.    Agree to change Condition 5 (Landscaping) and original Condition 5 (Easements), now
      Condition 13.
C.    Agree to delete Conditions 4(d) and 4(h).
D.    Refuse to change Conditions 7 & 9(b) and original Condition 6(b) now Condition 14(b)

3     RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval is 4 years starting the day that this
development approval takes effect.



                                                                                    Page 1 of 10
Log in to download the original file

Attachment C- REC14.0005 Negotiated Decision Notice.pdf · 113 KB (small file)

Full text of the other 9 pages

Page 2

                                                                                     REC14/0005

4    ASSESSMENT MANAGER CONDITIONS

PLANNING

     When conditions must be Complied With
1.   Unless otherwise stated, all works required by the conditions of this Decision Notice
     must be completed prior to submission of the subdivision plan to Council for compliance
     assessment

     Approved Plans
2.   Development authorised by this approval must be undertaken generally in accordance
     with the Approved Plans listed within this Decision Notice.

3.   All lot numbering on the subdivision plan to be submitted to Council for compliance
     assessment must remain as shown on the Approved Plans.

     Boundary Encroachments
4.   Certification must be submitted to Council from a Licensed Surveyor which certifies that:
     (a) the boundary clearances for any existing buildings remaining on the site comply
            with the relevant provisions of the planning scheme and the Building Act 1975,
            unless varied by this Decision Notice
     (b) all constructed access and roadworks (including associated fill batters and
            retaining walls) are fully contained within a dedicated reserve or registered
            easement
     (c) all existing and proposed utility services and connections (eg. electricity,
            telecommunications, water, sewerage) are wholly located within the lot they serve,
            or alternatively included within an easement where location within the lot is not
            possible
     (d) deleted
     (e) all dams (including ponded water, dam walls and associated spillway structures)
            are wholly located within the boundaries of a single lot
     (f)    all retaining walls and structures are fully contained within the lot they retain
     (g) any fill, including fill batters, are wholly contained within the subject site and not on
            adjacent properties
     (h) deleted.

     Landscaping
5.   Native street trees shall be established at 10 metre centres within the footpath reserve
     along the frontage of Lot 103 and shall have a minimum pot size of 45 litres.

     Vegetation Clearing
6.   Vegetation clearing is not authorised by this approval and shall only be undertaken in
     association with an appropriate development approval.




                                                                                  Page 2 of 10

Page 3

                                                                                  REC14/0005

ENGINEERING

      External Works
7.    Gateway Drive must be upgraded for the length of its frontage to the subject site. The
      works must be undertaken in accordance with an Operational Works approval and must
      include in particular the construction of a pedestrian footpath in accordance with the
      conditions of this Decision Notice. This condition is imposed pursuant to s665 of the
      Sustainable Planning Act 2009 being non-trunk infrastructure.

      Pedestrian and Bicycle Facilities
8.    Pedestrian and bicycle facilities must be provided for the development. The works must
      be undertaken in accordance with an Operational Works approval and must include in
      particular a 2 metre wide footpath within the road verge extending from the end of the
      existing pathway in Gateway Drive to the northern boundary of proposed Lot 103. This
      condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-
      trunk infrastructure.

      Stormwater Drainage
9.    The site must be provided with a stormwater drainage system connecting to a lawful
      point of discharge. The works must be undertaken in accordance with an Operational
      Works approval and must include in particular:
      (a) A connection point for the future development of proposed Lot 103 to the existing
            stormwater drainage system
      (b) The retention of the existing overland flowpath that conveys stormwater runoff
            from the adjoining property (Lot 26 SP151406) through proposed Lot 103. The
            flows must be contained and conveyed wholly within a combined drainage solution
            consisting of underground drainage, capable of accommodating flows up to a Q10
            event, and a landscaped and suitably stabilised (rock lined or other engineered
            alternative) open drain. The design of the drain must be sufficient to include all
            design storm events up to and including the 1%AEP event of critical duration.
            Design calculations (that include at a minimum depth of flow and velocity) and
            certification by a suitably qualified RPEQ demonstrating the above must be
            submitted as part of the operational works application
      (c) Additional elements in the design of the open drain (localised bunding etc) that
            allows stormwater flows from the minor storm event to enter the existing piped
            system and ensure that velocities (generated in both the major and minor events)
            are in accordance with the safety guidelines recommended in QUDM.

      Electricity and Telecommunication Services
10.   Underground reticulated electricity and telecommunication services must be provided to
      each lot in accordance with an approval for Operational Works and the standards and
      requirements of the relevant service provider.

11.   Unless otherwise stipulated by telecommunications legislation at the time of
      construction, the development must be provided with all necessary conduits, pits and
      pipes to accommodate the future connection of optic fibre technology
      telecommunications.

12.   Certification must be submitted to Council from all relevant service providers which
      certifies that the development has met the requirements of this Decision Notice and all
      applicable legislation at the time of construction.


                                                                               Page 3 of 10

Page 4

                                                                                    REC14/0005

      Easements
13.   A drainage easement must be created within proposed Lot 103. The easement must be:
      (a) Of sufficient width (approximately 4.5m) to encompass all elements of the
            combined underground pipe and open drain solution (underground pipe (Q10
            flows), batters, bunds, etc. and a 1.5m maintenance track),
      (b) In favour of Lot 26 SP151406 to connect to a legal point of discharge as defined in
            QUDM.
      (c) Alignment of the underground pipe, open drain, and easement is to be determined
            through operational works application (as per condition 9(b) above).

14.   A drainage easement must be created within proposed Lot 101. The easement must be:
      (a) In favour of Lot 26 SP151406 and proposed Lot 103,
      (b) Centrally located over the existing piped drainage system connecting proposed Lot
            103 and Lot 26 SP151406 to the existing stormwater discharge point in Gateway
            Drive.

15.   Unless otherwise agreed in writing by the relevant service provider, any public or third
      party infrastructure located on the subject site must be placed within an easement
      registered against the title of the property.

16.   All easements must be designed in accordance with the planning scheme and granted
      at no cost to the Grantee. Where the Grantee is Council or a service authority, the
      easement documentation must be in accordance with the Grantee’s standard easement
      terms. Draft easement documentation must be submitted to Council for endorsement.

17.   All works must be kept clear of any existing or proposed easements on the subject land,
      unless agreed otherwise in writing by the Grantee.

      Earthworks and Retaining Walls
18.   All fill and associated batters must be undertaken in accordance with an Operational
      Works approval, and contained entirely within the subject site unless written permission
      from the respective landowner(s) is provided to Council.

19.   All retaining walls must be designed and constructed in accordance with the planning
      scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
      retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with
      a commercial grade safety fence.

      Damage to Services and Assets
20.   Any damage caused to existing services and assets as a result of the development
      works must be repaired at no cost to the asset owner at the following times:
      (a) where the damage would cause a hazard to pedestrian or vehicle safety,
           immediately; or
      (b) where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and
      assets must first be referred to the relevant service authority for approval.




                                                                                 Page 4 of 10

Page 5

                                                                                      REC14/0005

UNITYWATER

Important Advisory Note - The following Unitywater conditions are applied in accordance with
the Chapter 4c, part 7 and sections 135 and 140(c) South East Queensland (Distribution and
Retail) Restructuring Act 2009 and Unitywater’s Interim Connections Policy. The conditions
below form part of a water connection aspect which are taken to be a water approval for a
staged connection. You are entitled to appeal against the water connection aspects of this
application in accordance with section 99BRAY and Chapter 4c, part 4, Divisions 1 and 2 of
 the South East Queensland (Distribution and Retail) Restructuring Act 2009. Unitywater can
be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com

21.   Reticulated water must be provided to each lot in the development. This must include:
      (a) Ensuring that existing internal water pipes are wholly contained within the lot they
            will serve.
      (b) An approved water meter for each lot in accordance with Unitywater and SEQ
            Standard Drawings.
      (c) Provision of a water service to service proposed all lots in accordance with
            Unitywater and SEQ Standard Drawings.
      (d) Provision of a pipeline conduit under Gateway Drive in accordance with Unitywater
            and SEQ Standard Drawings.
      (e) An approved 150mm diameter water service connection to each lot in accordance
            with Unitywater requirements.

22.   Water meters must be located on alternative boundaries to electrical pillars.

23.   Reticulated sewerage must be provided to each lot in the development. This must
      include:
      (a) Ensuring existing sewer house drains are wholly contained within the Lot they will
            serve.
      (b) Provision of sewerage infrastructure to the property boundaries of Lot 103.

24.   Written approval to enter and construct must be obtained from the owners of properties
      through which external sewers will traverse, and be submitted with lodgment of the
      associated development application for Operational Works.

25.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers
      located within property boundaries in accordance with the SEQ standards. Easements
      shall be centred over the pipe. Easement terms shall be the most current registered
      dealing held by the Department of Natural Resources & Mines and shall not be altered
      or amended.

26.   Written approval to enter and construct must be obtained from the owners of properties
      through which external watermains will traverse. This must include approval for an
      easement over the mains, and be submitted with lodgment of the associated
      development application for Operational Works.

27.   A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
      proposed building envelopes, buildings and other structures.



                                                                                 Page 5 of 10

Page 6

                                                                                  REC14/0005

28.   Stormwater retention systems and gross pollutant traps must maintain a minimum
      clearance of 1.5 meters from Unitywater water supply and sewerage infrastructure

29.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
      Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
      plants within these clearances must be low growing when mature and suitable
      Unitywater approved varieties.

30.   Construction works undertaken in the vicinity of Unitywater water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs
      associated with repair, replacement or alteration of infrastructure must be met by the
      applicant.

5     REFERRAL AGENCY CONDITIONS

Not Applicable

6     ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:

      Building and Construction Industry (Portable Long Service Leave) Levy
1.    The QLeave levy must be paid prior to the issue of a development permit where it is
      required. Council will not be able to issue a Decision Notice without receipt of details
      that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
      6855.

      Co-ordination of Operational Works Assessment
2.    Additional application fees apply to Operational Work applications where the different
      aspects of the works are lodged separately. Significant savings in application fees will
      result if all works are lodged in a single application.

      Preparation of a Preliminary Construction Management Plan
3.    A preliminary Construction Management Plan must be submitted with the Operational
      Works application and must address the following:
      (a) traffic management during all aspects of the construction phase including:
           (i)   a Traffic Management Control Plan in accordance with the Manual of
                 Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                 and traffic control measures prior to construction
           (ii) maintenance of safe pedestrian access for the areas affected by the works
                 during and after daily construction has ceased
           (iii) proposed fencing to the site during the construction phase of the
                 development
           (iv) approval of the Traffic Management Control Plan by the Department of
                 Transport and Main Roads (DTMR) for any works on State controlled roads
           (v) provision for worker car parking
      (b) maintenance and protection of water quality and existing drainage lines through
           the construction site, through the implementation of appropriate erosion and
           sediment control measures


                                                                               Page 6 of 10

Page 7

                                                                                 REC14/0005

     (c)   works programme identifying key components of the works and their respective
           durations
     (d)   establishment of a communication protocol with the general public, adjoining
           owners, emergency services and local businesses to advise of agreed
           construction times, impacts on traffic, services and other relevant issues
     (e)   identification of complaint management procedures including:
           (i)    contact details for the on-site manager
           (ii) dispute resolution procedures
     (f)   it is acknowledged that the preliminary Construction Management Plan will be a
           draft document requiring finalisation upon appointment of the Principal Contractor
           employed to construct the works and a final document will be required to be
           submitted at the Pre-Start Meeting for the project.

     Unitywater
4.   Connection to the Unitywater live water supply and live sewerage system must be
     undertaken by Unitywater at the applicant’s cost.

     Infrastructure Charges
5.   This Development Permit may trigger an “Adopted Infrastructure Charge Notice” (if
     applicable) to be issued in accordance with Council’s “Adopted Infrastructure Charges
     Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the
     Sustainable Planning Act 2009.

7    PROPERTY NOTES

Not Applicable.

8    PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

Not Applicable

9    FURTHER DEVELOPMENT PERMITS REQUIRED

    Development Permit for Operational Work (Access, Frontage Works, Services,
     Stormwater, Earthworks)

10   SELF ASSESSABLE CODES

Not Applicable

11   SUBMISSIONS

Not Applicable

12   REASONS/GROUNDS FOR APPROVAL

Not Applicable




                                                                              Page 7 of 10

Page 8

                                                                                    REC14/0005

13     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Sustainable Planning Act 2009 is attached.

14     OTHER DETAILS

If you wish to obtain more information about Council’s decision, electronic copies are available
on line at www.noosa.qld.gov.au, or at Council Offices.

DECISION NOTICE HISTORY
Original Decision Notice (4 July 2014)
Negotiated Decision Notice (24 September 2014)



Yours faithfully




DENIS WALLACE
SENIOR DEVELOPMENT PLANNER



Enc:    Appeal Rights
        Negotiated Infrastructure Charge Notice



cc:     Unitywater




                                                                                 Page 8 of 10

Page 9

                                                                                                                 REC14/0005



                                                 Appeal Rights
                                                 SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
                                                 REGULATION 2009




The following is an extract from the Sustainable Planning Act       463 Additional and extended appeal rights for
2009 (Chapter 7).                                                       submitters for particular development applications
                                                                    (1) This section applies to a development application to
MATERIAL CHANGE OF USE, RECONFIGURING A LOT &                           which chapter 9, part 7 applies.
OPERATIONAL WORKS                                                   (2) A submitter of a properly made submission for the
                                                                        application may appeal to the court about a referral
Division 8           Appeals   to       court    relating  to           agency’s response made by a prescribed concurrence
                     development         applications     and           agency for the application.
                     approvals                                      (3) However, the submitter may only appeal against a
                                                                        referral agency’s response to the extent it relates to—
461     Appeals by applicants                                           (a) if the prescribed concurrence agency is the chief
(1)     An applicant for a development application may appeal                 executive (environment)—development for an
        to the court against any of the following—                            aquacultural ERA; or
        (a) the refusal, or the refusal in part, of the                 (b) if the prescribed concurrence agency is the chief
              development application;                                        executive (fisheries)—development that is—
        (b) any condition of a development approval, another                  (i) a material change of use of premises for
              matter stated in a development approval and the                       aquaculture; or
              identification or inclusion of a code under section             (ii) operational work that is the removal, damage
              242;                                                                  or destruction of a marine plant.
        (c) the decision to give a preliminary approval when a      (4) Despite section 462(1), the submitter may appeal
              development permit was applied for;                       against the following matters for the application even if
        (d) the length of a period mentioned in section 341;            the matters relate to code assessment—
        (e) a deemed refusal of the development application.            (a) a decision about a matter mentioned in section
(2)     An appeal under subsection (1)(a), (b), (c) or (d) must               462(2) if it is a decision of the chief executive
        be started within 20 business days (the applicant’s                   (fisheries);
        appeal period) after—                                           (b) a referral agency’s response mentioned in
        (a) if a decision notice or negotiated decision notice                subsection (2).
              is given—the day the decision notice or
              negotiated decision notice is given to the            464 Appeals by advice agency submitters
              applicant; or                                         (1) Subsection (2) applies if an advice agency, in its
        (b) otherwise—the day a decision notice was                     response for an application, told the assessment
              required to be given to the applicant.                    manager to treat the response as a properly made
(3)     An appeal under subsection (1)(e) may be started at             submission.
        any time after the last day a decision on the matter        (2) The advice agency may, within the limits of its
        should have been made.                                          jurisdiction, appeal to the court about—
                                                                        (a) any part of the approval relating to the assessment
462     Appeals by submitters—general                                         manager’s decision about any part of the
(1)     A submitter for a development application may appeal                  application requiring impact assessment under
        to the court only against—                                            section 314; or
         (a) the part of the approval relating to the                   (b) any part of the approval relating to the assessment
              assessment manager’s decision about any part of                 manager’s decision under section 327.
              the application requiring impact assessment           (3) The appeal must be started within 20 business days
              under section 314; or                                     after the day the decision notice or negotiated decision
         (b) the part of the approval relating to the                   notice is given to the advice agency as a submitter.
              assessment manager’s decision under section           (4) However, if the advice agency has given the
              327.                                                      assessment manager a notice under section
(2)      To the extent an appeal may be made under                      339(1)(b)(ii), the advice agency may not appeal the
         subsection (1), the appeal may be against 1 or more of         decision.
         the following—
        (a) the giving of a development approval;                   465 Appeals about decisions relating to extensions for
        (b) any provision of the approval including—                    approvals
              (i) a condition of, or lack of condition for, the     (1) For a development approval given for a development
                   approval; or                                         application, a person to whom a notice is given under
              (ii) the length of a period mentioned in section          section 389, other than a notice for a decision under
                   341 for the approval.                                section 386(2), may appeal to the court against the
(3)     However, a submitter may not appeal if the submitter—           decision in the notice.
        (a) withdraws the submission before the application         (2) The appeal must be started within 20 business days
              is decided; or                                            after the day the notice of the decision is given to the
        (b) has given the assessment manager a notice                   person.
              under section 339(1)(b)(ii).                          (3) Also, a person who has made a request under section
(4)   The appeal must be started within 20 business days (the           383 may appeal to the court against a deemed refusal of
      submitter’s appeal period) after the decision notice or           the request.
      negotiated decision notice is given to the submitter.         (4) An appeal under subsection (3) may be started at any
                                                                        time after the last day the decision on the matter should
                                                                        have been made.


                                                                                                             Page 9 of 10

Page 10

                                                                     REC14/0005

466 Appeals about decisions relating to permissible
    changes
(1) For a development approval given for a development
    application, the following persons may appeal to the court
    against a decision on a request to make a permissible
    change to the approval—
    (a) if the responsible entity for making the change is the
         assessment manager for the application—
         (i) the person who made the request; or
         (ii) an entity that gave a notice under section 373
               or a pre-request response notice about the
               request;
    (b) if the responsible entity for making the change is a
         concurrence agency for the application—the person
         who made the request.
(2) The appeal must be started within 20 business days after
    the day the person is given notice of the decision on the
    request under section 376.
(3) Also, a person who has made a request under section
    369 may appeal to the court against a deemed refusal of
    the request.
(4) An appeal under subsection (3) may be started at any
    time after the last day the decision on the matter should
    have been made.

467 Appeals about changing or cancelling conditions
    imposed by assessment manager or concurrence
    agency
(1) A person to whom a notice under section 378(9)(b) giving
    a decision to change or cancel a condition of a
    development approval has been given may appeal to the
    court against the decision in the notice.
(2) The appeal must be started within 20 business days after
    the day the notice of the decision is given to the person.




                                                                 Page 10 of 10

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.