Original source · versioned page text
Minutes Ordinary Meeting 20 March 2025
ORDINARY MEETING MINUTES 20 MARCH 2025
QUESTION 2
Will Council provide a few more sets of bollards along the eastern side of
Kingfisher Drive, similar to those that have been in place for many years adjacent
to Brolga Place?
Response provided by Shaun Walsh Director Infrastructure Services
The traffic controls along Kingfisher Drive were placed many years near ago to
Brolga Place and are a mixture of bollards, white and red delineator posts and
boulders. As outlined above, assessment of new controls would await the Parking
Management Plan and Framework to provide a consistent set of guiding principles
that can be applied across the shire. Any new controls are also regulated by
Austroads Guidelines and Australian Standards AS 1742.2 (Traffic Control
Devices for General Use) & AS 1906.2 (Retroreflective Devices for Road Traffic
Control).
8.2. PATRICIA (PAT) SPICER
QUESTION 1
In the council development application for expansion of the cemetery in 2008, a
vegetated buffer zone was included on all perimeter boundaries of the plan for the
cemetery. This included Lake Macdonald Drive boundary. The Cooroy Cemetery
Management Plan repeatedly refers to the highly attractive and strong sense of
enclosure and privacy that is generated by the surrounding perimeter of mature
vegetation, especially the mature camphor laurels, pines and eucalypts to the
southern, western and northern boundaries and the mature pine plantation to the
eastern boundary. These statements are made in 8.2, policy 33, 9.2, 9.4, policy 38
to list a few. Council’s revised subdivision plan appears to be an artist’s impression
as the plan shows the open space between Lot 2 and 3 joins the full angled section
of my fenceline which is inaccurate as the open space is 20m wide and this
fenceline is 29.5m. Open space is not a substitute for a buffer. As council is going
to remove most of the vegetation to the east of the existing cemetery as well as to
the south and north, how does council intend to address this improvident planning
of no buffer zone on the plans of the proposed subdivision and the boundary of the
land being set aside for cemetery use (Lot 100 and proposed Lot 1 and 2), on Lake
Macdonald Drive for Lot 100 and the perimeter of Lot 3 on the southern side and
western side as well as privacy fencing on the western side where this land shares
a boundary with Lot 1 SP 118458 (my boundary) to ensure amenity for all residents
as a matter of urgency
Response provided by Kim Rawlings Director Strategy and Environment
The revised subdivision plan provides the indicative layout of the lots. The full
engineered project drawings are being finalised by the consultants in preparation
for the upcoming tender process. Consultation with cemetery planning staff has
occurred during all stages of this project and continues to regularly occur.
Remediation of the lots will occur to the extent necessary to satisfy relevant
environmental regulations to be able to remove the lots from the Environmental
Management Register. Native trees on site will be retained where possible, noting
some Gympie Messmate trees may need to be trimmed or removed if they are
unsafe, or have suffered previous damage from storms. A native tree survey has
been undertaken to inform this. The intention is the cemetery will not lose amenity
from this project, with all site revegetation to occur in accordance with the
Landscape Management Plan which will form part of the broad tender
documents. All landscaping and revegetation work will consist of suitable local
native species.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.